Get alerts
Request for proposalsConstructionFederal buyerWOSB

WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19

DEPT OF DEFENSE, Oklahoma · DEPT OF THE AIR FORCE · FA8137 AFSC PZIOC
Verified 24 h agoUpdated Oct 6 · Updated
Responses dueMon, Nov 22:00 PM CT · Oklahoma time26 days left
PostedMon, Oct 5No amendments since
Solicitation no.FA8137-27-R-0002SAM.gov
Set-asideWOSBOnly firms holding this status can compete

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The US Army Corps of Engineers is soliciting bids for the installation of a React VII facility at Building 9001, Tinker AFB, Oklahoma. The contract will be awarded based on a firm-fixed-price basis, and the evaluation method is unknown. The bid must be submitted in a sealed hard copy.

Scope

  • INSTALL REACT VII FACILITY, B9001, POST V19
  • MICRO FOUNDRY EXPANSION BUILDING 9001
WOSB set-asideInsurance requiredSubmission: physicalDays to respond: 26
CompetitionLikely competitive

2 signals behind this label (incumbent, repeat winner, short window, brand-name or sole-source language, prior sources sought). Pro shows them with sources.

From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.

How to get the bid documents

  1. Download the 170 stored documents below; 5 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit by physical before 2:00 PM CT on Nov 2
Documents · 168 items, 175 filesDownload all (zip)
Start here
  • Solicitation · Solicitation - FA813727R0002.pdfView
  • Pricing · ELECTRICAL PANEL SCHEDULE U18L.xlsxView
  • SOW / PWS · SOW Att 02a_Controlled Area Training.pptxView
  • PDF
    029c50d02a14408e99714fcd6635b8e5.pdf897 KB · 16 pages
  • PDF
    033c7dad347f4951996260327ae491fc.pdf40 KB · 10 pages
  • PDF
    039657a3b5c24372abf8b85045820db5.pdf151 KB · 33 pages
  • PDF
    04ca1130f22541dd9a71dee7185070e9.pdf139 KB · 33 pages
  • PDF
    05a3e5e0341446209b49da4cc841538a.pdf467 KB · 1 page
  • PDF
    08cf32c45502454b86e5607ad97aa790.pdf121 KB · 1 page
  • XLSX
    0b0593c6bdce426fb5d08b25c6c880f1.xlsx70 KB
  • PDF
    0f67e92d8c244493914147c825420f34.pdf11.9 MB · 12 pages
  • DOCX
    1144446300f2428a89577db10d5c4607.docx44 KB
  • PDF
    1189e33e91de47abaf078560007f893e.pdf1.9 MB · 215 pages
  • PDF
    1580a62575264f0db498c4b7cbef93df.pdf37 KB · 1 page
  • PDF
    17bb7a2a9fef4155b375bf32d6992f26.pdf265 KB · 6 pages
  • PDF
    199bee4070c54c458a9b807ed47551a2.pdf59 KB · 14 pages
  • PDF
    19efcdec4e334d0bbaa41b1e7a28c411.pdf389 KB · 15 pages
  • PDF
    1a34f8bc4a0d41ac823d4eeb1d17bf04.pdf658 KB · 1 page
  • PDF
    22c8370d02ab4211a34744bf296c654a.pdf300 KB · 8 pages
  • PDF
    2358ca494bd44694b599de721df22168.pdf157 KB · 1 page
  • PDF
    2455873401604d849646ea4c7017bdaa.pdf224 KB · 9 pages
  • XLSX
    2757bf89948a4490ba81824a770eac86.xlsx10 KB
  • DOC
    downloadToo large, open at source
  • 1 earlier version
    • DOC
      downloadToo large, open at source
  • PDF
    306cda04326445fa884a677a33e4e419.pdf2.5 MB · 306 pages
  • PDF
    31fe5fc0f9f1426f9a74d7cbbbe6491c.pdf57 KB · 13 pages
  • PDF
    341940f6cca44f109dbf88fd66b5e241.pdf14.0 MB · 37 pages
  • PDF
    35ff6ab3f72040f1b676d690053d23b2.pdf32 KB · 7 pages
  • PDF
    36f11f490b434d5f85aca57c34fe272d.pdf4.6 MB · 58 pages
  • PDF
    37d9d5063f7843ee84f4e179d4fac358.pdf34 KB · 7 pages
  • PDF
    3a70a0c683ed4b57812b548012a998bb.pdf1.4 MB · 1 page
  • PDF
    3c1e7c956d6d45f689d00996f8d2e6ce.pdf374 KB · 36 pages
  • PDF
    3caacd8a32bf41d48f39c5e5bed2cb6b.pdf168 KB · 17 pages
  • PDF
    3e9d547d5cbc41cb9458aa067144cde3.pdf42 KB · 10 pages
  • PDF
    3edb46f45a2e4535af4ce9e480c59619.pdf340 KB · 5 pages
  • XLSX
    465c1678e93643788091536538cccf03.xlsx10 KB
  • PPTX
    46e4091f2bd94aa3ae37f3f57c8d5c20.pptx651 KB
  • PDF
    480c82314fbf4b68adafaa53cf9230d9.pdf2.1 MB · 101 pages
  • PDF
    48aea1e724aa4ec6821a08e325500d25.pdf26 KB · 6 pages
  • PDF
    4c5d9b72b32d4326a375b65b5dd49e9b.pdf194 KB · 1 page
  • PDF
    4d44389b97ee4da1a06deae7abc9966f.pdf148 KB · 51 pages
  • PDF
    4de63d7a4ee84154ab97da4a0a0a5a5e.pdf1.0 MB · 65 pages
  • PDF
    52bf0887e92f4435b49246e2236bc52f.pdf856 KB · 21 pages
  • PDF
    Solicitation - FA813727R0002.pdf765 KB · 46 pages
  • PNG
    Site Visit Meet Up Location.png1.5 MB
  • PDF
    250063_ATT 14_Prebid RFI Responses Round 2.pdf290 KB · 3 pages
  • PDF
    250063_ATT 13_Prebid RFI Responses Round 1.pdf224 KB · 9 pages
  • PDF
    250063_ATT 9_SOW.pdf374 KB · 36 pages
  • PDF
    250063_ATT 8_Liquidated Damages.pdf82 KB · 1 page
  • PDF
    250063_ATT 6_OPSEC Review Memo.pdf1.8 MB · 1 page
  • PDF
    250063_ATT 4_ODS.pdf157 KB · 1 page
  • PDF
    2020 TAFB Facility Standard.pdf5.8 MB · 112 pages
  • PDF
    2026 TAFB Mechanical Standard_signed.pdf1.2 MB · 30 pages
  • PDF
    2026 TAFB Electrical Standard - Signed.pdf523 KB · 32 pages
  • PDF
    2026 TAFB FIRE PROTECTION STANDARD.pdf341 KB · 9 pages
  • PDF
    SOW Att 04_Automated Casting Cell.pdf658 KB · 1 page
  • PDF
    SOW Att 02c_Controlled Area Training - Certificate.pdf467 KB · 1 page
  • XLSX
    SOW Att 05_SMS Builder Equipment List_v0 2023 0817.xlsx16 KB
  • PPTX
    SOW Att 02a_Controlled Area Training.pptx651 KB
  • PDF
    250063_SOW.pdf374 KB · 36 pages
  • PDF
    250063_ATT 10_Submittal Register.pdf360 KB · 9 pages
  • 1 earlier version
    • XLSX
      250063_ATT 10_Submittal Register.xlsx70 KB
  • PDF
    250063_ATT 3_RMDF.pdf265 KB · 6 pages
  • PDF
    23 09 23.02.pdf168 KB · 17 pages
  • PDF
    22 00 00.pdf359 KB · 73 pages
  • PDF
    23 31 13.00 40.pdf182 KB · 22 pages
  • PDF
    23 08 00.pdf163 KB · 68 pages
  • PDF
    23 00 00.pdf245 KB · 48 pages
  • PDF
    21 13 13.pdf103 KB · 26 pages
  • PDF
    23 07 00.pdf233 KB · 46 pages
  • PDF
    23 36 00.00 40.pdf90 KB · 22 pages
  • PDF
    23 05 48.00 40.pdf49 KB · 10 pages
  • PDF
    23 05 93.pdf57 KB · 13 pages
  • 1 earlier version
    • PDF
      23 05 15.pdf151 KB · 33 pages
  • PDF
    09 67 23.15.pdf90 KB · 28 pages
  • PDF
    23 09 13.pdf171 KB · 22 pages
  • PDF
    09 90 00.pdf139 KB · 33 pages
  • PDF
    26 20 00.pdf187 KB · 44 pages
  • PDF
    10 14 00.20.pdf30 KB · 7 pages
  • 1 earlier version
    • PDF
      10 14 00.10.pdf42 KB · 10 pages
  • PDF
    08 81 00.pdf57 KB · 13 pages
  • PDF
    08 51 23.pdf38 KB · 9 pages
  • PDF
    08 11 13.pdf39 KB · 9 pages
  • PDF
    08 33 23.pdf47 KB · 12 pages
  • PDF
    07 92 00.pdf43 KB · 10 pages
  • PDF
    07 14 00.pdf40 KB · 10 pages
  • PDF
    08 71 00.pdf59 KB · 14 pages
  • PDF
    23 03 00.pdf25 KB · 6 pages
  • PDF
    10 22 13.pdf22 KB · 5 pages
  • PDF
    05 40 00.pdf42 KB · 10 pages
  • PDF
    07 84 00.pdf32 KB · 7 pages
  • PDF
    28 31 76.pdf200 KB · 28 pages
  • PDF
    10 44 16.pdf14 KB · 4 pages
  • PDF
    07 21 16.pdf26 KB · 6 pages
  • PDF
    03 01 00.pdf148 KB · 51 pages
  • PDF
    23 64 26.pdf165 KB · 42 pages
  • PDF
    05 05 23.16.pdf34 KB · 7 pages
  • PDF
    06 41 16.00 10.pdf57 KB · 14 pages
  • PDF
    00 72 00.pdf5.3 MB · 89 pages
  • PDF
    01 78 23.pdf34 KB · 14 pages
  • 1 earlier version
    • PDF
      01 78 00.pdf1.4 MB · 27 pages
  • PDF
    00 71 00.pdf1.5 MB · 18 pages
  • PDF
    00 70 00.pdf897 KB · 16 pages
  • PDF
    01 33 00.pdf856 KB · 21 pages
  • PDF
    01 45 00.00 10.pdf36 KB · 12 pages
  • PDF
    01 50 00.pdf300 KB · 8 pages
  • PDF
    01 32 16.00 20.pdf28 KB · 10 pages
  • PDF
    01 42 00.pdf10 KB · 4 pages
  • PDF
    00 80 00.pdf8 KB · 2 pages
  • 1 earlier version
    • PDF
      00 80 05.pdf10 KB · 4 pages
  • PDF
    01 33 16.00 10.pdf86 KB · 30 pages
  • PDF
    HAZMAT Reporting at Tinker AFB FEB 2025.pdf23 KB · 1 page
  • PDF
    UMRL.pdf686 KB · 281 pages
  • PDF
    ERDCITL_TR12-1_r2.pdf3.4 MB · 73 pages
  • PDF
    ERDCITL_TR12-6_r6.pdf1.5 MB · 115 pages
  • PDF
    ufc_3_260_01_2019_c1.pdf70.0 MBToo large, open at source (70.0 MB)
  • PDF
    ufc_3_535_01_2017_c4.pdf19.8 MB · 320 pages
  • PDF
    tinkerafb_INRMP.pdf15.8 MB · 172 pages
  • PDF
    EM_385-1-1.pdf10.1 MB · 930 pages
  • PDF
    ufc_3_600_01_2016_c6.pdf9.9 MB · 222 pages
  • PDF
    tinkerafb_INRMP_App G.pdf4.6 MB · 58 pages
  • PDF
    dafman91-203.pdf3.8 MB · 350 pages
  • PDF
    dafi21-101_afmcsup_afmcgm2023-01.pdf2.8 MB · 429 pages
  • PDF
    afi91-202_afmcsup.pdf2.7 MB · 250 pages
  • PDF
    dafi21-101.pdf2.5 MB · 306 pages
  • PDF
    ufc_3_260_04_2018.pdf2.3 MB · 136 pages
  • PDF
    ufc_3_601_02_2021.pdf2.1 MB · 101 pages
  • PDF
    dafi91-202.pdf1.9 MB · 215 pages
  • PDF
    tinkerafbi13-204.pdf1.8 MB · 89 pages
  • PDF
    afman32-7003.pdf1.3 MB · 127 pages
  • PDF
    dafi13-213.pdf1.2 MB · 59 pages
  • PDF
    afman40-201.pdf1.1 MB · 87 pages
  • PDF
    tinkerafb_HWMP.pdf1016 KB · 60 pages
  • PDF
    afman48-148.pdf1.0 MB · 65 pages
  • PDF
    dafi13-213_tinkerafbsup.pdf687 KB · 34 pages
  • PDF
    TAFB_SOP_outages_v2.pdf473 KB · 13 pages
  • PDF
    afman91-203_oc-alcsup.pdf389 KB · 15 pages
  • PDF
    afi48-104.pdf317 KB · 13 pages
  • PDF
    tinkerafb_INRMP_App E.pdf225 KB · 7 pages
  • PDF
    tinkerafbi21-100.pdf213 KB · 9 pages
  • PDF
    dodio-2000.16v1_afi10-245-o.pdf37 KB · 1 page
  • PDF
    007200_Attch13_AF487.pdf1.4 MB · 1 page
  • PDF
    013300_Attch1_TAFBF3000.pdf234 KB · 2 pages
  • PDF
    007100_Attch1_Airfield Construction Waiver.pdf192 KB · 1 page
  • PDF
    007000_Attch1_TAFB Outage Request Form.pdf186 KB · 2 pages
  • PDF
    007200_Attch14_Information for New Boilers.pdf144 KB · 1 page
  • PDF
    007200_Attch7b_Monthly Hazardous Usage Report.pdf123 KB · 1 page
  • PDF
    017800_Attch1_DD1354.pdf93 KB · 2 pages
  • PDF
    007200_Attch9_EMS Awareness Training.pdf86 KB · 1 page
  • PDF
    007200_Attch7a_AF3952.pdf40 KB · 1 page
  • DOCX
    017800_Attch2_DD1354 Checklist.docx44 KB
  • PDF
    250063_ATT 11_Drawings.pdf13.9 MB · 50 pages
  • PNG
    image (1).png243 KB
  • 1 earlier version
    • PNG
      image.png66 KB
  • DOCX
    HELICAL PILES NOTES.docx15 KB
  • XLSX
    Room finish schedule.xlsx10 KB
  • XLSX
    Door_Window_Schedule.xlsx21 KB
  • XLSX
    JOIST SPECIAL INSPECTIONS.xlsx10 KB
  • XLSX
    PILE SCHEDULE.xlsx11 KB
  • XLSX
    ELECTRICAL PANEL SCHEDULE U18L.xlsx25 KB
  • PDF
    250063_ Redline A-502.pdf309 KB · 1 page
  • PDF
    esvperf_singledual_2023_V2.pdf670 KB · 10 pages
  • PDF
    DESV_Submittal.pdf457 KB · 3 pages
  • PDF
    HE05IN_Dimension_Drawing.pdf194 KB · 1 page
  • PDF
    z415-bz1.pdf286 KB · 1 page
  • PDF
    esvEH_singledual_2023_V2.pdf267 KB · 2 pages
  • PDF
    lrad331965pd_spec.pdf384 KB · 3 pages
  • PDF
    REACT VII SA-01.pdf340 KB · 5 pages
  • PDF
    lk406gn05t4_spec.pdf220 KB · 2 pages
  • PDF
    z400i.pdf_safe.pdf121 KB · 1 page
  • PDF
    TAFB B9001 VAV Schedule.pdf6 KB · 1 page
  • PDF
    ELECTRICAL COMBINED.pdf52.5 MBToo large, open at source (52.5 MB)
  • PDF
    ARCH-COMBINED.pdf41.2 MBToo large, open at source (41.2 MB)
  • PDF
    4500-S.pdf14.0 MB
  • PDF
    4500-CIVIL.pdf14.0 MB
  • PDF
    4500-MUG.pdf13.6 MB
  • PDF
    220042 As Built Drawings.pdf11.9 MB · 12 pages
  • PDF
    overall plan 04.15.2021.pdf184 KB · 1 page
Open the original listing on SAM.gov

Details

Place of performance
Tinker AFB, Oklahoma
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
FA8137-27-R-0002
Category
Construction
NAICS
NAICS 236220 (Commercial and Institutional Building Construction): 111 open RFPs
Size standard
$45M revenue SBA table, NAICS 236220
PSC
PSC Z1AA (MAINTENANCE OF OFFICE BUILDINGS): 7 open RFPs
Quantity
250 each from notice
Delivery location
Tinker AFB, Oklahoma from notice
Period of performance
48-month base + 6 one-year options from notice
Contract type
Firm-fixed-price from notice
Approved sources
General Motors from notice
Local presence
Not required
Amendments
None since Oct 5
Contact
Isaac Demmers
Office
DEPT OF THE AIR FORCE · FA8137 AFSC PZIOC
Email
isaac.demmers@us.af.mil

Not stated in the notice: estimated value. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Mon, Oct 5Posted
Thu, Oct 15 · 9:00 AM CTPre-bid meeting
Mon, Nov 2 · 2:00 PM CTResponses due · 26 days left
Pre-bid location
North West Parking lot of Building 9001

Change log

verified Tue, Oct 6 · 11:30 PM CT
  1. Posted · SolicitationMon, Oct 5 · 10:56 AM CT
  2. Updated · description text changedTue, Oct 6 · 11:30 PM CT
Report a problem

Notice as published

WWYK250063 - INSTALL REACT VII FACILITY, B9001, POST V19

THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY After review of the project specific documents, if you are a SBA Certified WOSB, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit. Your RSVP email must be received within 5 calendar days from the posting of this project. In you RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access.

If anyone requires base access, you must forward with your RSVP, the Entry Access List (EAL) so that we can know how many personnel require base access. After receipt of your RSVP and EAL if required, Initial Site Visit is set for Thursday, 15 October, 2026 at 0900 (9:00 am) CST. The meet up location for the site visit will be at the North West Parking lot of Building 9001.

Approximate coordinates are: 3523'43.9"N 9723'56.8"W -- An attachment titled "Site Visit Meet Up Location" can be found in the attachments and gives the specific details and visual for the meet up point. You must attend the initial Site Vist for the project, to be considered eligible to propose. Please submit your RSVP to SSgt Isaac Demmers at "[email on the source notice]" and CC Tamra Torres at "[email on the source notice]".

THIS POSTING IS FOR SBA Certified Women Owned Small Businesses (WOSB) ONLY

Similar Dept of the Air Force awards · PSC Z1AA

USAspending.gov, last 36 months

25 awards matched · tier 2: Dept of the Air Force + PSC Z1AA; nothing from this office. Most recent:

  • Jun 16FAITH BUILDERS OF TAMPA BAY, INCPKP - 26-BP05 - CORROSION CONTROL AND PAINT TWO METAL PIPES ACROSS CREEK AT USCENTCOM COMPOUNDFA481426F0084 · DELIVERY ORDER · Department of the Air Force · ends Aug 4, 2026$5K
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Tue, Oct 6, 2026 · 4:15 AM CT.

This contracting office

4 other open notices from this office · buys mostly Construction, Equipment Maintenance & Repair

Similar open RFPs

same PSC Z1AA

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov