Sign inGet alerts

Closed Sat, Oct 10. Responses were due Tue, Sep 15 · 4:00 PM ET. This notice is kept for reference and no longer takes responses.

WASTEWATER PRETREATMENT PLANT OPERATION AND MAINTENANCE SERVICES

TREASURY, DEPARTMENT OF THE, District of Columbia · BUREAU OF ENGRAVING AND PRINTING · OFFICE OF THE CHIEF PROCUREMENT OFFICER
Verified 8 h agoAmended Jul 15Local presence required
Responses dueTue, Sep 154:00 PM ET · District of Columbia timeClosed
PostedWed, Jul 156 amendments, last Oct 7
Solicitation no.2031ZA26R00023SAM.gov
Set-aside8(a)Only firms holding this status can compete

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Department of the Treasury is seeking contractor services for the management, operation, and maintenance of its Industrial Wastewater Pretreatment Plant. This will be a Firm-Fixed-Price contract, and offers will be evaluated based on factors outlined in Section M of the solicitation.

Scope

  • Manage, operate, and maintain an Industrial Wastewater Pretreatment Plant (WWPP).
  • Provide technical support for Wastewater and Storm Water Programs 24/7.
Sealed bid — price only8(a) set-asideLocal presence required

How to get the bid documents

Documents · 79 items, 83 filesDownload all (zip) · Pro
Start here
  • Solicitation · 2031ZA26R00023 WWPP Solicitation.pdfView
  • Pricing · Attachment B - Pricing Sheet.xlsxView
  • SOW / PWS · Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_v4.pdfView
  • XLSX
    019e7e2e86904c018b3de0917e67370c.xlsx28 KB
  • PDF
    01a4b118f11948708ab1ea27844d4e9a.pdf572 KB · 128 pages
  • PDF
    0493459e349d492bb235a0cb4c20cf11.pdf159 KB · 3 pages
  • PDF
    0b1d24a3c08c4c7ea146367d17d42361.pdf85 KB · 3 pages
  • PDF
    205a691fffaa41c28914ddef512a9975.pdf338 KB · 10 pages
  • PDF
    25f56de912f544b0ba168d3c282072aa.pdf277 KB · 3 pages
  • PDF
    37aeea71de64407a86a310a4ae4540cf.pdf44 KB · 7 pages
  • PDF
    39aa922f6ff448c1803d29c47c9a3819.pdf489 KB · 69 pages
  • PDF
    3d2d42413bd14c0a8c1568302dd60134.pdf232 KB · 4 pages
  • PDF
    421aa58712e3416aaceeb60da30cb515.pdf188 KB · 6 pages
  • PDF
    4d8fd5560abd4e149ddda03f2f59555e.pdf94 KB · 6 pages
  • PDF
    4ee6a1e3b4d54281a03503c53a56eabc.pdf345 KB · 11 pages
  • PDF
    5dacc945530d481bb00335bdf12bd5a1.pdf71 KB · 3 pages
  • PDF
    603974c84b87429599a53b83c029d2ce.pdf14 KB · 1 page
  • PDF
    63a32c83ae1241ea935376d05ed7b9b3.pdf113 KB · 7 pages
  • XLSX
    6be6f929054743038091a4f2ac31e3e9.xlsx28 KB
  • PDF
    6d1977f2e7ae473392eea569638424bc.pdf409 KB · 6 pages
  • PDF
    739db15e82ee4fc4a4df34aa3157e51a.pdf26 KB · 2 pages
  • DOCX
    73a47517fdda4e5da2447335a5fb34eb.docx54 KB
  • PDF
    76507ad3f59749a0a510227ab397af76.pdf75 KB · 4 pages
  • PDF
    8ac67a8bf8d94460a800a895b265a7ff.pdf17 KB · 1 page
  • PDF
    8f21a836c64c4998a227c92d092ef178.pdf1.2 MB · 22 pages
  • XLSX
    ad2f976ba837482fa65e18e6606d72c8.xlsx26 KB
  • DOCX
    ad65b95011ad4b65b4251e585350d8a7.docx33 KB
  • XLSX
    b140bf0c41b04ad99abbc62ab3ec41b1.xlsx13 KB
  • DOC
    b350a8cd6f6347b6a706e0c0939582d9.doc232 KB
  • PDF
    b56fecd5f7f74f33be2cc1c5e09fd08d.pdf301 KB · 6 pages
  • PDF
    b646a67a7f5b436f92e7a829cb0bf622.pdf322 KB · 13 pages
  • PDF
    ba4c4cfa3b484bd8a96b2055f6966b6b.pdf490 KB · 69 pages
  • PDF
    badd81adaa64460eb5eaadba887bffdd.pdf273 KB · 3 pages
  • PDF
    bd646e8560ae4d1c9c523ae7b5a3dbff.pdf368 KB · 3 pages
  • PDF
    c10620ae71a84e36acbac86dacc5d455.pdf73 KB · 3 pages
  • DOCX
    c7264308448d4bf89eafd1c8cca6a4b3.docx22 KB
  • PDF
    cd5a97f4d3394b9eaaa152aa1f750c67.pdf335 KB · 11 pages
  • PDF
    cf4181d9e7ef4348978b3b45faf0007c.pdf160 KB · 5 pages
  • PDF
    d883441a34574316bc914fb47c60b231.pdf207 KB · 1 page
  • PDF
    da45402ebb0a4977b7c12d60dbe5f0f6.pdf82 KB · 4 pages
  • PDF
    eedce24608694cbd804e408920882bcf.pdf85 KB · 2 pages
  • PDF
    f0d88a6c8de94f13aab6c999147a02bf.pdf668 KB · 7 pages
  • PDF
    f5ec4fc8e64c44f291f118577af719e4.pdf127 KB · 1 page
  • PDF
    Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_v4.pdf489 KB · 69 pages
  • 1 earlier version
    • PDF
      Attachment A - PWS Waste Water Pretreatment Plant Operation and Maintenance_v5 - 21 Aug 2026.pdf490 KB · 69 pages
  • PDF
    2031ZA26R00023 0003.pdf301 KB · 6 pages
  • XLSX
    WWPP - Request for Clarifications-Questions-Answers.xlsx13 KB
  • XLSX
    Attachment B - Pricing Sheet.xlsx26 KB
  • 2 earlier versions
    • XLSX
      Attachment B - Pricing Sheet - 6 Aug 2026.xlsx28 KB
    • XLSX
      Attachment B - Pricing Sheet - 21 Aug 2026.xlsx28 KB
  • DOCX
    Attachment D - Past Performance Questionnaire.docx33 KB
  • PDF
    2031ZA26R00023 0002 - 07 Aug 2026.pdf409 KB · 6 pages
  • PDF
    2031ZA26R00023 0001 - 06 Aug 2026.pdf338 KB · 10 pages
  • PDF
    Attachment C - Site Visit Information.pdf127 KB · 1 page
  • 1 earlier version
    • DOCX
      Attachment C - Site Visit Information - 6 Aug 2026.docx54 KB
  • PDF
    Att 1 - BEP 017-12.pdf1.2 MB · 22 pages
  • PDF
    Att 12 - EHS Requirements for Purchased Materials.pdf668 KB · 7 pages
  • PDF
    Att 5 - WSRP Process Description.pdf368 KB · 3 pages
  • PDF
    Att 18 - Sodium Hydroxide Specification.pdf345 KB · 11 pages
  • PDF
    Att 19 - Sodium-Sulfated Castor Oil Specification.pdf335 KB · 11 pages
  • PDF
    Att 23 - Spare Parts and Supplies.pdf322 KB · 13 pages
  • PDF
    Att 2 - WSWPP Process Description.pdf277 KB · 3 pages
  • PDF
    Att 3 - PWPP Process Description.pdf273 KB · 3 pages
  • DOC
    Attachment 28 Staffing Plan.doc232 KB
  • PDF
    Att 13 - Restricted Materials at DCF.pdf232 KB · 4 pages
  • PDF
    Att 22 - Process and Treatment Chemicals.pdf207 KB · 1 page
  • PDF
    Att 26 - Equipment.pdf188 KB · 6 pages
  • PDF
    Att 8 - EHS Contractor Requirements.pdf212 KB · 19 pages
  • PDF
    Att 25 - Laboratory Analysis.pdf160 KB · 5 pages
  • PDF
    Att 24 - Nonreimburseable Tools - Janitorial - PPE Supplies.pdf159 KB · 3 pages
  • PDF
    Attachment 27 - Corrosion Monitoring.pdf113 KB · 7 pages
  • PDF
    Att 4 - GTWPP Process Description.pdf85 KB · 2 pages
  • PDF
    Att 20 - Boxes - Lids Specification.pdf75 KB · 4 pages
  • PDF
    Att 14 - Bentonite Specification.pdf82 KB · 4 pages
  • PDF
    Att 15 - Sulfuric Acid Specification.pdf94 KB · 6 pages
  • PDF
    Att 17 - Filter Aid Specification.pdf85 KB · 3 pages
  • PDF
    Att 21 - Pallets Specification.pdf71 KB · 3 pages
  • PDF
    Att 16 - Sodium Bisulfite Specification.pdf73 KB · 3 pages
  • PDF
    Att 11 - Wage Determination.pdf44 KB · 7 pages
  • DOCX
    Attachment 29 - Monthly Workforce Report.docx22 KB
  • PDF
    Att 10 - PWPP Equipment List.pdf17 KB · 1 page
  • PDF
    Att 9 - WSWPP Equipment List.pdf26 KB · 2 pages
  • PDF
    Att 7 - BEP Furnished Equipment.pdf14 KB · 1 page
  • PDF
    2031ZA26R00023 WWPP Solicitation.pdf572 KB · 128 pages
  • PDF
    6ff02ffea11945c4a872e71ae3a5c70d.pdf490 KB · 69 pages
  • PDF
    7b7c663873f14a7f8efc62a6763aa23e.pdf287 KB · 6 pages
Open the original listing on SAM.gov

Details

Place of performance
Washington, District of Columbia
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
2031ZA26R00023
Category
Equipment Maintenance & Repair · beta
NAICS
NAICS 561210 (Facilities Support Services): 17 open RFPs
PSC
PSC S216 (HOUSEKEEPING- FACILITIES OPERATIONS SUPPORT): 8 open RFPs
Quantity
1 MONTH from attachment p.4
Delivery location
Washington, DC from notice
Contract type
Firm-fixed-price from attachment p.4
Evaluation
Sealed bid, price only (FAR 14) from attachment
Local presence
Required
Amendments
6, last Oct 7
Contact
Marico Sellers
Office
BUREAU OF ENGRAVING AND PRINTING · OFFICE OF THE CHIEF PROCUREMENT OFFICER
Email
marico.sellers@treasury.gov

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Line items

from attachment p.4
CLINItemQtyUnitOption qty
0001Phase-in and Training - Service1MONTH-
0002Phase-in and Training - Service1MONTH-
0003Phase-in and Training - Service1MONTH-
0004Phase-in and Training - Service1MONTH-
0005Phase-in and Training - Service1MONTH-
0006Phase-in and Training - Service1MONTH-
0007Phase-in and Training - Service1MONTH-
0008Phase-in and Training - Service1MONTH-
0009Phase-in and Training - Service1MONTH-
0010Phase-in and Training - Service1MONTH-
0011Service Labor: Program Manager11MONTH-
0012Service Labor: Plant Manager11MONTH-
0013Service Labor: Assistant Plant11MONTH-
0014Service Labor: Maintenance11MONTH-
0015Service Labor: Supervisor Operator11MONTH-
0016Service Labor: Operator11MONTH-
0017Service Labor: Laborer11MONTH-
0018Service Labor: Laboratory11MONTH-
0019Service Labor: Office Automation11MONTH-
0020Service Labor: Maintenance11MONTH-

Key dates

Wed, Jul 15Posted
Not statedQuestions due
Oct 27 Tue, Sep 15 · 4:00 PM ETResponses due · closed
Amendment 1
Thu, Aug 6
Amendment 2
Fri, Aug 7
Amendment 3
Fri, Aug 21
Amendment 4
Mon, Oct 5
Amendment 5
Mon, Oct 5
Amendment 6
Wed, Oct 7 · description text changed
Closed
Sat, Oct 10

Change log

verified Sat, Oct 10 · 12:30 AM ET
  1. Posted · SolicitationWed, Jul 15 · 9:43 AM ET
  2. Amendment · New version of the notice posted at the sourceThu, Aug 6 · 10:04 AM ET
  3. Amendment · New version of the notice posted at the sourceFri, Aug 7 · 10:07 AM ET
  4. Amendment · New version of the notice posted at the sourceFri, Aug 21 · 5:00 AM ET
  5. Amendment · New version of the notice posted at the sourceMon, Oct 5 · 4:38 AM ET
  6. Deadline moved · Tue, Sep 15, 2026 · 4:00 PM ET → Thu, Nov 5, 2026 · 12:00 PM ETMon, Oct 5 · 4:38 AM ET
  7. Amendment · New version of the notice posted at the sourceMon, Oct 5 · 8:00 PM ET
  8. Amendment · description text changedWed, Oct 7 · 12:30 AM ET
  9. Deadline moved · Tue, Oct 27, 2026 · 12:00 PM ET → Tue, Sep 15, 2026 · 4:00 PM ETWed, Oct 7 · 12:33 AM ET
  10. Deadline moved · Tue, Sep 15, 2026 · 4:00 PM ET → Tue, Oct 27, 2026 · 12:00 PM ETThu, Oct 8 · 12:31 AM ET
  11. Deadline moved · Tue, Oct 27, 2026 · 12:00 PM ET → Tue, Sep 15, 2026 · 4:00 PM ETThu, Oct 8 · 12:32 AM ET
  12. Deadline moved · Tue, Sep 15, 2026 · 4:00 PM ET → Tue, Oct 27, 2026 · 12:00 PM ETFri, Oct 9 · 12:31 AM ET
  13. Deadline moved · Tue, Oct 27, 2026 · 12:00 PM ET → Tue, Sep 15, 2026 · 4:00 PM ETFri, Oct 9 · 12:32 AM ET
  14. ClosedSat, Oct 10 · 12:30 AM ET
  15. Deadline moved · Tue, Sep 15, 2026 · 4:00 PM ET → Tue, Oct 27, 2026 · 12:00 PM ETSat, Oct 10 · 12:31 AM ET
  16. Deadline moved · Tue, Oct 27, 2026 · 12:00 PM ET → Tue, Sep 15, 2026 · 4:00 PM ETSat, Oct 10 · 12:32 AM ET
Report a problem

Notice as published

WASTEWATER PRETREATMENT PLANT OPERATION AND MAINTENANCE SERVICES

The Bureau of Engraving & Printing's (BEP) Facility located in Washington, DC contains an Industrial Wastewater Pretreatment Plant (WWPP). BEP's objective is to procure contractor services to manage, operate, maintain supplies and perform maintenance and provide technical support for the Wastewater and Storm Water Programs. The WWPP requires services to support the BEP on a 24/7 basis.

The WWPP currently consists of four

  1. systems:
  2. Wiping Solution Wastewater Pretreatment Plant (WSWPP),
  3. Plating Wastewater Pretreatment Plant (PWPP),
  4. Grease Trap Wastewater Pretreatment Plant (GTWPP), and
  5. Wiping Solution Recycling Plant (WSRP).

The WWPP includes an on-site lab and a materials storage area.

What this office paid before

USAspending.gov, last 36 months

1 award matched · tier 1: this contracting office (2031ZA) + PSC S216. Most recent:

  • Jul 30, 2025PRIDE INDUSTRIESOPERATIONS AND MAINTENANCE (O&M) SERVICES FOR THE WESTERN CURRENCY FACILITY (WCF).2031ZA25C00330 · DEFINITIVE CONTRACT · Bureau of Engraving and Printing · ends Jul 30, 2027$35M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Tue, Oct 6, 2026 · 4:41 AM ET.

This contracting office

5 other open notices from this office · buys mostly Supplies & Equipment, Other, Landscaping

Similar open RFPs

same PSC S216

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov