Get alerts

VRF Cooling System Replacement

Responses dueTue, Nov 32:00 PM PT · Oregon time27 days left
PostedFri, Oct 2No amendments since
Solicitation no.S-DASOBO-00017473Oregon DAS - OregonBuys
Set-asideNoneOpen to all firms

What the state is buying

by RFPFinder from the notice and attachments; the solicitation governs

The DAS On-Behalf Of agency is purchasing a VRF cooling system replacement. This will be a firm-fixed-price contract, and offers will be evaluated based on unknown criteria.

Scope

  • Removal of current VRF cooling system and installation of new system.
  • Includes duct work, testing, balancing, and staff training.
Days to respond: 27

How to get the bid documents

  1. Download the 3 documents below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit through Oregon DAS - OregonBuys (free account) before 2:00 PM PT on Nov 3

To submit, you need a free account at Oregon DAS - OregonBuys.

Documents · 3 items, 3 filesDownload all (zip)
  • PDF
    S-DASOBO-00017473 - ITB1.1 MB · 86 pages
  • PDF
    S-DASOBO-00017473 - Attachment B3.3 MB · 281 pages
  • PDF
    S-DASOBO-00017473 - Attachment C4.0 MB · 15 pages
Open the original listing on the agency portal

Details

Place of performance
Oregon
Buyer type
State
Notice type
Not stated
Solicitation no.
S-DASOBO-00017473
Contract type
Firm-fixed-price from notice
Local presence
Not required
Amendments
None since Oct 2
Contact
Megan Saunders
Email
megan.saunders@das.oregon.gov
Phone
(503) 378-2100

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Oct 2Posted
Not statedQuestions due
Tue, Nov 3 · 2:00 PM PTResponses due · 27 days left

Change log

verified Wed, Oct 7 · 5:17 PM PT

No amendments since posting on Fri, Oct 2; verified Wed, Oct 7 · 5:17 PM PT.

Report a problem

Notice as published

VRF Cooling System Replacement

The Work, includes, but is not limited to: removal of the current building VRF cooling system (with two towers in Building E), purchase and installation of the new cooling system including any duct work, testing and balancing of the system, and training DPSST staff on the new system. Project requires integration with the current building automation system.

Pre-bid conference: See ITB section A.5 and A.10 for more information.

Similar open RFPs

same contracting office

Listing collected from Oregon DAS - OregonBuys. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site