Sign inGet alerts

Closed Mon, Oct 5. Responses were due Thu, Sep 24 · 8:00 AM PT. This notice is kept for reference and no longer takes responses.

Combined synopsisFederal buyerSB

USCGC Healy Fire Alarm System troubleshooting

Unverified · check sourceUpdated Oct 6 · Updated
Responses dueThu, Sep 248:00 AM PT · Washington timeClosed
PostedThu, Sep 17No amendments since
Solicitation no.70Z08526Q0028041SAM.gov
Set-asideSBOnly firms holding this status can compete

What the agency is buying

from the notice as published

Statement of Work SIEMENS Fire Alarm System Troubleshooting USCGC Healy 1. GENERAL 1.1 Background The objective of this project is to perform a comprehensive inspection and repair of the existing fire alarm control panel and detectors onboard CGC HEALY. The contractor must perform a groom of the system to resolve insistent trouble alarms. The contractor must be a Siemens technical representative…

Small business set-aside

How to get the bid documents

Attachment list not pulled yet; check the source notice.

Open the original listing on SAM.gov

Details

Place of performance
Seattle, Washington
Buyer type
Federal
Notice type
Combined Synopsis/Solicitation
Solicitation no.
70Z08526Q0028041
NAICS
NAICS 336611 (Ship Building and Repairing)
Size standard
1,300 employees SBA table, NAICS 336611
PSC
PSC J020 (MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT): 6 open RFPs
Amendments
None since Sep 17
Contact
Justin Wooldridge
Office
US COAST GUARD · SFLC PROCUREMENT BRANCH 2(00085)
Email
justin.r.wooldridge2@uscg.mil
Phone
2068205327

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Thu, Sep 17Posted
Not statedQuestions due
Thu, Sep 24 · 8:00 AM PTResponses due · closed
Closed
Mon, Oct 5

Change log

verified Tue, Oct 6 · 9:30 PM PT
  1. Posted · Combined Synopsis/SolicitationThu, Sep 17 · 8:32 AM PT
  2. ClosedMon, Oct 5 · 3:35 AM PT
  3. Updated · description text changedTue, Oct 6 · 9:31 PM PT

Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.

Report a problem

Notice as published

USCGC Healy Fire Alarm System troubleshooting

Statement of Work SIEMENS Fire Alarm System Troubleshooting USCGC Healy 1. GENERAL 1.1 Background The objective of this project is to perform a comprehensive inspection and repair of the existing fire alarm control panel and detectors onboard CGC HEALY.

The contractor must perform a groom of the system to resolve insistent trouble alarms. The contractor must be a Siemens technical representative with ability to program newly installed detector heads into system. 1.2 Period of Performance The period of performance is fourteen

  1. calendar days from date of contract award for three
  2. working days.

All work to be done onboard CGC HEALY at USCG Base Seattle Terminal 46. 1.3 Delivery Location Services to be performed at: USCG Base Seattle 1519 Alaskan Way S Seattle, WA 98123 POC: LT Stephen Bruno 1.4 References Coast Guard Drawing 420-WAGB-801-001, Rev K, Booklet of General DrawingsALARMCO, INC Operation and Maintenance Manual

  1. SCOPE OF WORK CLIN 0001:The contractor must provide all labor, materials, tools, and equipment necessary to complete the following tasks: 2.1 Clearing Alarms and Troubleshooting Review and document the panel's event log to identify the source of all current and historical faults, troubles, and alarm signals. Troubleshoot constant Input source malfunction, Not Responding, andCommunication Error alarms that populate on FireFinder XLS Fire AlarmControl Panel.Clear and reset all active alarms and trouble codes on the panel to return thesystem to a "Normal" operating state.

2.2 Program Detectors Restore full capability to all fire alarm units onboard with the exception of thosehoused in Generator Room 2 (1-80-2-E).Program unidentified detector heads into the system including those recentlyinstalled HFP-11 smoke detectors in the Magazine Compartment (1-9-2-M).Conduct functional tests on the restored detectors to verify proper activationand comunication with the Fire Alarm Control Panel. 2.3 Fire Alarm Panel Inspection Ensure Master Fire Alarm Control Panel in the Engineering Control Center andannunciators in Damage Control Central, and the Port and StarboardQuarterdecks are working with full button functionality. See Coast Guard Drawing420-WAGB-801-001 for guidance about the location of the spaces listed above.

3.DELIVERABLES3.1 Inspection Report A detailed inspection report to the US Coast Guard outlining findings of inspection, what repairs were conducted, which units need further work and the final result of system groom. Shall include documentation stating that the fire alarm panel and associated detectors have been restored to full functionality, or if full functionality has not been restored, include a list of specific repairs necessary to restore full functionality, including parts and necessary labor hours. 4.

CLIN 002: Potential Repairs based on CFR not to exceed ($2,500 dollars)4.1 Pricing for any additional travel costs, material, or field service days will be requested and handled by the KO under the terms of the contract. Any repairs beyond the base scope identified because of the troubleshooting shall be documented in a Condition Found Report (CFR) with a technical description of the recommended repairs. The CFR shall be provided to the Technical POCs and the Contracting Officer.

4.2 Any additional work will be authorized only by the KO through a written contract modification. The contractor shall not perform any repairs beyond the base scope until specifically authorized in writing by the KO. If the Government elects to proceed with additional repairs, the KO will issue a written contract modification that identifies the authorized additional work and associated firm fixed price.

The 5. Detector List Provide a table of all detectors, including at a minimum: Detector NameNetwork AddressLoopCompartment location ofAn example table format is provided below.

Reference current ALARMCO, INC Operation and Maintenance Manual created during the previous Fire & Smoke Detection Replacement Project under Contract No. HSCG40-12-S-30014. Detector Name Network Address Loop Compartment Gen Rm 1 FWD 002:115 2 1-80-1-E ... ... ... ...

What this office paid before

USAspending.gov, last 36 months

25 awards matched · tier 1: this contracting office (70Z085) + PSC J020. Most recent:

  • Sep 23GUARDIAN SYSTEMS LLCOPEN, INSPECT, REAPIR CYLINDER ASSY.70Z08526P49025B00 · PURCHASE ORDER · SMALL BUSINESS SET ASIDE - TOTAL · U.S. Coast Guard · ends Mar 29, 2027$54K
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Sat, Oct 10, 2026 · 8:35 PM PT.

This contracting office

9 other open notices from this office · buys mostly Supplies & Equipment, Equipment Maintenance & Repair, Transportation

Similar open RFPs

same PSC J020

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov