What the city is buying
by RFPFinder from the notice and attachments; the solicitation governsThe City of Long Beach seeks bids to install five dual-port DC fast chargers and a battery energy storage system at 2600 Temple Ave, including electrical equipment, switchgear, conduit, wiring, and site improvements. This is a sealed-bid construction contract awarded to the lowest responsive responsible bidder.
Scope
- Install 5 dual-port DCFC chargers and battery energy storage system with electrical equipment and switchgear
- Perform site demolition, civil work, conduit routing, wiring, and hardscape improvements
How to get the bid documents
- Download the 3 documents below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit by physical before 11:00 AM PT on Nov 20
Details
- Place of performance
- California
- Buyer type
- City
- Notice type
- Construction Bid
- Solicitation no.
- PW-26-800
- Category
- Construction · beta
- Delivery location
- 2600 Temple Ave, Long Beach, CA 90806 from notice
- Period of performance
- 12/21/2026 to 10/25/2027 from notice
- Contract type
- Firm-fixed-price from notice
- Local presence
- Not required
- Amendments
- None since Oct 14
- Contact
- Justin Beck
- Office
- PUBLIC WORKS
- Phone
- (562) 570-6200
Not stated in the notice: estimated value. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Pre-bid location
- Microsoft Teams (mandatory pre-bid conference) and job-site walk-through at 1:00 p.m.
Change log
verified Thu, Oct 15 · 11:18 PM PTNo amendments since posting on Wed, Oct 14; verified Thu, Oct 15 · 11:18 PM PT.
Report a problem
Notice as published
R-7282 Fleet Services EV Charging Depot
The work to be done consists primarily of installation of 5 dual-port Direct Current Fast Chargers (DCFC) for Electric Vehicle (EV) charging as well as a Battery Energy Storage System (BESS) connected to the charging equipment. Work will include installation of electrical equipment, new switchgear, conduit, wiring, and all hardscape and site improvements necessary to facilitate component installation. Bids are required for the entire Work.
Pre-bid conference: The mandatory Pre-Bid Conference will be conducted via Microsoft Teams on Oct. 27, 2026, at 10:00 a.m. The mandatory Job-Site Walk-Through is at 1:00 p.m.
See Division A for Teams link and for more information.
Contract period: 12/21/2026 to 10/25/2027