Get alerts
Invitation to BidConstructionCity buyer

Cherry Avenue Sewer Improvement Project (SC-0512)

City of Long Beach, California · Engineering Bureau
Responses dueWed, Oct 142:00 PM PT · California time6 days left
PostedFri, Sep 18No amendments since
Solicitation no.UD-26-361California DGS - Cal eProcure / California State Contracts Register (CSCR)
Set-asideNoneOpen to all firms

What the city is buying

by RFPFinder from the notice and attachments; the solicitation governs

The City of Long Beach is soliciting bids for the Cherry Avenue Sewer Improvement Project, which involves the installation of around 3,100 linear feet of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line. The contract period is from January 1, 2027 to July 14, 2027. Offers will be evaluated based on the lowest price.

Scope

  • Installation of around 3,100 linear feet of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line
  • Removal and replacement or abandonment of existing sewer lines and manholes
Insurance requiredSubmission: physicalDays to respond: 6

How to get the bid documents

  1. Download the 2 stored documents below; 1 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit by physical before 2:00 PM PT on Oct 14
Documents · 3 items, 3 filesDownload all (zip)
  • DOC
    Project SpecificationsToo large, open at source
  • PDF
    Project Plans8.3 MB · 11 pages
  • PDF
    Traffic Control Plan6.8 MB · 22 pages
Open the original listing on the agency portal

Details

Place of performance
California
Buyer type
City
Notice type
Invitation to Bid
Solicitation no.
UD-26-361
Category
Construction
Quantity
3,100 linear feet of vitrified clay pipe (VCP) or high from notice
Delivery location
Long Beach, California from notice
FOB
Destination from notice
Period of performance
01/01/2027 to 07/14/2027 from notice
Contract type
Firm-fixed-price from notice
Approved sources
DRP Engineering, Inc. from notice
Local presence
Not required
Amendments
None since Sep 18
Contact
Matthew Cruz
Office
Engineering Bureau
Email
Fernando.Eggleston@lbwater.org
Phone
(562) 570-2332

Not stated in the notice: estimated value. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Sep 18Posted
Sep 29Pre-bid held
Wed, Oct 14 · 2:00 PM PTResponses due · 6 days left Under 14 days
Pre-bid location
Virtual

Change log

verified Thu, Oct 8 · 5:16 AM PT

No amendments since posting on Fri, Sep 18; verified Thu, Oct 8 · 5:16 AM PT.

Report a problem

Notice as published

Cherry Avenue Sewer Improvement Project (SC-0512)

The Work consists of the installation of around 3,100 linear feet of vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line along with 12 new 48-inch sewer maintenance holes and 1 new 60-inch drop sewer maintenance hole. The Work also includes removal and replacement or abandonment of existing sewer lines and manholes. Also included are dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling and compacting.

Pre-bid conference: Bidders are encouraged to attend an optional virtual pre-bid meeting at 10 a.m., Tuesday Sept. 29, 2026 and must request an invitation to the meeting by emailing [email on the source notice] with the email subject line: "RSVP-Cherry Ave Sewer Project"

Contract period: 01/01/2027 to 07/14/2027

Similar open RFPs

same contracting office

Listing collected from California DGS - Cal eProcure / California State Contracts Register (CSCR). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site