Sign inGet alerts
Request for proposalsConstructionFederal buyer

PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

ENERGY, DEPARTMENT OF, Illinois · ENERGY, DEPARTMENT OF · FERMILAB - DOE CONTRACTOR
Verified 4 h agoLocal presence required
Responses dueThu, Nov 192:00 PM CT · Illinois time40 days left
PostedWed, Oct 7No amendments since
Solicitation no.378854_MRSAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Department of Energy seeks a contractor to fabricate and install a Low Conductivity Water piping system in the F-37 Pump Room at Fermilab. Proposals will be evaluated using an unknown method; a pre-proposal meeting and site visit are required on October 27, 2026.

Scope

  • Fabricate and install Low Conductivity Water (LCW) piping system in F-37 Pump Room
  • Work at Fermilab federal facility; compliance with DOE ES&H requirements mandatory
Local presence requiredMandatory pre-bid Oct 27Q&A closes Nov 5Days to respond: 40

How to get the bid documents

  1. Download the 50 documents below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit as the notice directs before 2:00 PM CT on Nov 19
Documents · 50 items, 50 filesDownload all (zip) · Pro
  • PDF
    103813e6f5c34fc6a114d22fa94086ad.pdf113 KB · 2 pages
  • PDF
    117b06449ea645d5838f7569d4af2c6c.pdf406 KB · 14 pages
  • PDF
    122154115e6440469c6ad7395f80a495.pdf174 KB · 2 pages
  • PDF
    29a132ced8f04aebaf1c8d9b0fd327e7.pdf337 KB · 19 pages
  • PDF
    396a8fa406d94effa7fc365cb25be97f.pdf323 KB · 12 pages
  • PDF
    3bde6f82b04943de875571e38ba34ae4.pdf189 KB · 2 pages
  • PDF
    4ed23a230a9b4b21a851962d800d517e.pdf209 KB · 5 pages
  • PDF
    5002e5d9390341f980368e75ba023f02.pdf343 KB · 17 pages
  • PDF
    509150948ed44588b37b373dcd67b0ee.pdf320 KB · 25 pages
  • PDF
    5c5d529579354e79b39aa4b7cb89af7d.pdf428 KB · 6 pages
  • PDF
    60eac18bead949f2af7b88f22a09827b.pdf1.5 MB · 23 pages
  • PDF
    9c8e08a0da8d4b798c5a929def031d89.pdf471 KB · 6 pages
  • PDF
    9d2daf7c99514f2d9cab1a620841633c.pdf194 KB · 5 pages
  • PDF
    a2906064e9f94846b317c422192f5e61.pdf754 KB · 5 pages
  • PDF
    acbb3345eacd4b83b9eb97b8ddcd34d3.pdf889 KB · 22 pages
  • PDF
    af6b479617d84f37bd5048c0c6f3fa60.pdf166 KB · 6 pages
  • PDF
    c3e42ffff3de473b92a5c140b0c630b9.pdf919 KB · 45 pages
  • PDF
    c756bfba9a1143fe85cbbdc833ace1a0.pdf512 KB · 11 pages
  • PDF
    d4df66e30b8043d2a2d2b60f8df76c2b.pdf234 KB · 3 pages
  • PDF
    dbcc72fc14fa45749069d0a8de13d43a.pdf102 KB · 4 pages
  • PDF
    dfdf28c52d4e4101a63b10ff0b7666ec.pdf115 KB · 3 pages
  • ZIP
    e7892dd7c7114d729be154e46d82da33.zip17.1 MB
  • PDF
    e96e46ca7fcd4e5d933b598e8bb61e33.pdf115 KB · 4 pages
  • PDF
    ed602bdb98d547f3af4a733a2d7b4975.pdf392 KB · 7 pages
  • PDF
    ef5ab9c65fa4455095c82be9c19d1bcc.pdf146 KB · 5 pages
  • PDF
    378854_MR.pdf323 KB · 12 pages
  • ZIP
    EXHIBIT_25_Drawings.zip17.1 MB
  • PDF
    EXHIBIT_24_Sample Subcontract.pdf209 KB · 5 pages
  • PDF
    EXHIBIT_23_Performance Bond.pdf102 KB · 4 pages
  • PDF
    EXHIBIT_22_Payment Bond.pdf115 KB · 3 pages
  • PDF
    EXHIBIT_21_Bid_Bond.pdf115 KB · 4 pages
  • PDF
    EXHIBIT_20_SF1413-23a.pdf189 KB · 2 pages
  • PDF
    EXHIBIT_19_General_Decision_Number_IL20260008_05_18_2026.pdf889 KB · 22 pages
  • PDF
    EXHIBIT_18_Injury_Illness_Questionaire.pdf113 KB · 2 pages
  • PDF
    EXHIBIT_17_FL-55.pdf392 KB · 7 pages
  • PDF
    EXHIBIT_16__2025_Construction_Insurance_Requirements.pdf234 KB · 3 pages
  • PDF
    EXHIBIT_15_SARC.pdf471 KB · 6 pages
  • PDF
    EXHIBIT_14_Proposal Certifications.pdf406 KB · 14 pages
  • PDF
    EXHIBIT_13_CESHC.pdf428 KB · 6 pages
  • PDF
    EXHIBIT_12_014100 Quality Requirements.pdf166 KB · 6 pages
  • PDF
    EXHIBIT_11_013300 Submittals.pdf146 KB · 5 pages
  • PDF
    EXHIBIT_10_013100 ESH Requirements.pdf919 KB · 45 pages
  • PDF
    EXHIBIT_9_010010 General Requirements.pdf337 KB · 19 pages
  • PDF
    EXHIBIT_8_FESHM 5034 Pressure Testing.pdf512 KB · 11 pages
  • PDF
    EXHIBIT_7_ADDENDUM TO FESHM.pdf174 KB · 2 pages
  • PDF
    EXHIBIT_6_5031_1 Piping Systems March 2025.pdf1.5 MB · 23 pages
  • PDF
    EXHIBIT_5_F37_LCW_Electrical_Statement_of_Work_and_prints_rev_A.pdf754 KB · 5 pages
  • PDF
    EXHIBIT_4_ED0042585_PIP-II_F37_Bldg_Low_Conductivity_Water_Specification.pdf343 KB · 17 pages
  • PDF
    EXHIBIT_3_ED0042584_PIP-II_Low_Conductivity_Water_LCW_System_Instrumentation_Specification.pdf194 KB · 5 pages
  • PDF
    EXHIBIT_2_FFDG_General_Terms_and_Conditions.pdf320 KB · 25 pages
Open the original listing on SAM.gov

Details

Place of performance
Batavia, Illinois
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
378854_MR
Category
Construction
NAICS
NAICS 23822
PSC
PSC K056 (MODIFICATION OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS)
Delivery location
Fermilab, Batavia, Illinois from notice
Local presence
Required
Amendments
None since Oct 7
Contact
Michele Reynolds
Office
FERMILAB - DOE CONTRACTOR
Email
micheler@fnal.gov
Phone
6308402448

Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline.

Key dates

Wed, Oct 7Posted
Thu, Nov 5 · 5:00 PM CTQuestions due · 27 days
Thu, Nov 5 · 10:00 AM CTPre-bid meeting
Thu, Nov 19 · 2:00 PM CTResponses due · 40 days left
Pre-bid location
Fermilab, Batavia, Illinois

Change log

verified Fri, Oct 9 · 11:30 PM CT

No amendments since posting on Wed, Oct 7; verified Fri, Oct 9 · 11:30 PM CT.

Report a problem

Notice as published

PIP-II F-37 BUILDING LWC PUMP ROOM PIPING SYSTEM INSTALLATION

This scope of work includes fabricating and installing a Low Conductivity Water (LCW) Piping System in the F-37 Pump Room. PLEASE NOTE the important information related to this RFP: Pre-Proposal Meeting and Site Visit: Ocotber 27, 10:00a CDT Last Day for Questions: November 5, 2026, 4:00p CDT PROPOSALS DUE: November 19, 2026, 2:00p CDT To attend the Pre-Proposal Meeting and Site Visit, PPE is required. As Fermilab is a federal facility, to access the Fermilab site, offerors MUST complete an Access Request form AT LEAST SEVEN

  1. DAYS IN ADVANCE OF THE MEETING.

AS THIS IS A SECURED DOE SITE, FNAL IS UNABLE TO PROCESS ACCESS REQUESTS THAT ARE NOT RECEIVED 7 DAYS PRIOR TO THE PRE-SOLICITATION CONFERENCE. Additionally, to obtain on-site access approval, attendees must be a U.S. Citizen and have a REAL ID.

Please note that when entering Fermilab: All vehicles are subject to search No weapons, firearms, or ammunition (regardless of concealed carry permit) are allowed on-site. No explosives or any other apparatus or material hazardous to the public or property are allowed on site. No possession or illegal use of controlled substances or intoxicants, or being under their influence, is allowable.

No personal alcohol or marijuana No Smoking or vaping within buildings and within 15-25 feet of entrances Illinois Rules of the Road are to be followed while driving on Fermilab's premises.

Award history

USAspending.gov, last 36 months

Award history for PSC K056 is not loaded yet.

Awards for this key have not been synced yet.

This contracting office

7 other open notices from this office · buys mostly Supplies & Equipment, Construction

Similar open RFPs

same NAICS 23822

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov