What the agency is buying
by RFPFinder from the notice and attachments; the solicitation governsFermi National Accelerator Laboratory (Fermilab) is seeking a subcontractor to design, manufacture, test, document, and deliver Booster GMPS Power Supply Girder Trimming Capacitors. The contract type is not specified, and the evaluation method is unknown.
Scope
- Design, manufacture, testing, documentation, and delivery of Booster GMPS Power Supply Girder Trimming Capacitors.
- Supplies must be in accordance with the requirements of this specification.
How to get the bid documents
- Download the 6 documents below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit as the notice directs before 2:00 PM CT on Oct 29
Details
- Place of performance
- Batavia, Illinois
- Buyer type
- Federal
- Notice type
- Solicitation
- Solicitation no.
- 385679-RK
- Category
- Supplies & Equipment · beta
- Size standard
- 600 employees SBA table, NAICS 335999
- Local presence
- Not required
- Amendments
- None since Oct 2
- Contact
- Richard Konan
- Office
- FERMILAB - DOE CONTRACTOR
- rkonan@fnal.gov
- Phone
- 6308402835
Not stated in the notice: estimated value, contract type, period of performance, quantity, FOB terms. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Sat, Oct 10 · 11:30 PM CTNo amendments since posting on Fri, Oct 2; verified Sat, Oct 10 · 11:30 PM CT.
Report a problem
Notice as published
PIP-II BOOSTER GMPS POWER SUPPLY GIRDER TRIMMING CAPACITORS
Fermi National Accelerator Laboratory (Fermilab or FNAL), managed and operated by Fermi Forward Discovery Group, LLC (FFDG) under a prime contract with the U.S. Department of Energy (DOE), is seeking to subcontract for work aligned with its mission objectives. The Proton Improvement Plan II (PIP-II) project is an essential upgrade to Fermilab's accelerator complex to enable the world's most intense high-energy beam of neutrinos for the international Deep Underground Neutrino Experiment at LBNF and a broad physics program, powering discoveries for many decades to come.
In support of this project, FNAL requires the design, manufacture, testing, documentation, and delivery of Booster GMPS Power Supply Girder Trimming Capacitors in accordance with the requirements of this specification, as identified herein.
Similar federal awards · PSC 5910
USAspending.gov, last 36 months25 awards matched · tier 3: PSC 5910 at any agency; nothing from this office or agency. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Fri, Oct 9, 2026 · 5:24 AM CT.
This contracting office
7 other open notices from this office · buys mostly Supplies & Equipment, Construction
Similar open RFPs
same NAICS 335999Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.