What the agency is buying
from the notice as publishedTHIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Full and Open Competition with a HUBZone Set-Aside PROJECT DESCRIPTION: ND NP THRO 204(1) Buck Hill Road Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in…
How to get the bid documents
Attachment list not pulled yet; check the source notice.
Open the original listing on SAM.govDetails
- Place of performance
- Medora, North Dakota
- Buyer type
- Federal
- Notice type
- Presolicitation
- Solicitation no.
- 6982AF25B000004
- Size standard
- $45M revenue SBA table, NAICS 237310
- Amendments
- 1, last Sep 21
- Contact
- Kelly Palmer
- Office
- FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Amendment 1
- Mon, Sep 21
- Closed
- Mon, Oct 5
Change log
verified Fri, Oct 9 · 11:30 PM CT- Posted · PresolicitationTue, Sep 15 · 5:25 AM CT
- Amendment · New version of the notice posted at the sourceMon, Sep 21 · 4:09 AM CT
- ClosedMon, Oct 5 · 5:35 AM CT
- Updated · description text changedTue, Oct 6 · 11:31 PM CT
Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.
Report a problem
Notice as published
ND NP THRO 204(1) Buck Hill Road
THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Full and Open Competition with a HUBZone Set-Aside PROJECT DESCRIPTION: ND NP THRO 204(1) Buck Hill Road Buck Hill Road, also known as Route 204, is located in Billings County within Theodore Roosevelt (THRO) National Park (NP) in the southeast portion of the park near the South Unit, Medora, ND. The route is located in mountainous terrain at approximate elevation of 2,500 to 2,800 feet. It begins at the intersection of Buck Hill Road and South Unit Scenic Loop Road.
The route then proceeds southeasterly for approximately of a mile and ascends approximately 300 feet vertically to the Buck Hill Overlook parking area. The route is located entirely within Theodore Roosevelt NP. There is one
- base schedule and no options.
SCOPE OF THE WORK: The project includes three major components;
- Approximately mile of roadway rehabilitation,
- Approximately 1,000 linear feet of deep subexcavation to address an existing landslide, and
- Reconstructing the existing Buck Hill Overlook parking lot.
The main roadway rehabilitation includes pulverization of the existing roadway, placement of new roadway aggregate, and new hot asphalt concrete pavement and replacing existing guardrail with new guardrail. Additionally, this work includes constructing new paved ditches and installing concrete curb and gutter along most of the length of the roadway. This includes installation of several drainage inlets and culverts as well as new striping and signage.
The deep subexcavation work includes removal of approximately existing unsuitable material to a 10 feet depth for a continuous 1,000 linear foot length of roadway and replacing with suitable material with geosynthetic reinforcement and installing subsurface drainage. A geotechnical report will be provided with the PS&E package. Reconstructing the existing Buck Hill Overlook parking lot expands and adds more parking spaces and accommodates larger trucks, recreational vehicles, and tour buses.
The work includes removing the existing pavement, placing embankment material, new aggregate base, and new hot asphalt concrete pavement. This work also includes constructing accessible parking, placing new concrete sidewalk and curb and gutter, and striping and signage. New trash receptacles and stone benches will be installed as part of the new parking area.
Project restrictions include the following: The Contractor may close Buck Hill Road for the duration of construction. A Paleontological Monitor will be present for all ground disturbing activities.
PRINCIPAL WORK ITEMS: Approximate quantities for major work items: 11,000 cubic yards of subexcavation 1,000 linear feet of geocomposite sheet drain 2,000 tons of hot asphalt concrete pavement 5,000 tons of roadway aggregate 550 linear feet of 24-inch pipe culvert (thick walled HDPE, fused) 5,100 linear feet of concrete curb and gutter (tan and onyx colored) 650 square yards of concrete sidewalk (tan colored) 1,600 linear feet of guardrail ANTICIPATED SCHEDULE: Advertisement October 2026 Award - January 2027 Construction April 2027 through November 2027 ESTIMATED COST RANGE: Between $5,000,000 and $10,000,000
What this office paid before
USAspending.gov, last 36 months25 awards matched · tier 1: this contracting office (6982AF) + PSC Y1LB. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Fri, Oct 9, 2026 · 11:49 PM CT.
This contracting office
8 other open notices from this office · buys mostly Construction, Architecture & Engineering