What the agency is buying
by RFPFinder from the notice and attachments; the solicitation governsThe Department of Transportation is purchasing services to replace the Holzwarth Culvert with a steel girder bridge in Rocky Mountain National Park, CO. This is a best value procurement, but the evaluation method is not explicitly stated.
Scope
- Removal of existing six-barrel culvert and construction of a new steel girder bridge.
- New bridge abutments, micropiles, temporary stream diversion, and aggregate roadway surfacing.
2 signals behind this label (incumbent, repeat winner, short window, brand-name or sole-source language, prior sources sought). Pro shows them with sources.
From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.
How to get the bid documents
- Download the 7 stored documents below; 2 more open at the source
- Check the submission requirements in the compliance checklist
- Submit by unknown before 2:00 PM MT on Oct 20
Details
- Place of performance
- Grand Lake, Colorado
- Buyer type
- Federal
- Notice type
- Solicitation
- Solicitation no.
- 6982AF27B000004
- Category
- Construction
- Size standard
- $45M revenue SBA table, NAICS 237310
- Delivery location
- Rocky Mountain National Park, Grand Lake, CO from notice
- Period of performance
- December 2026 - November 2027 from notice
- Estimated value
- $2.0M from notice
- Local presence
- Not required
- Amendments
- 1, last Oct 6
- Contact
- Denise Martinez
- Office
- FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Not stated in the notice: contract type. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Amendment 1
- Tue, Oct 6 · The original procurement notice has been updated with additional project details, including scope of work, principal work items, and anticipated schedule.
Change log
verified Tue, Oct 6 · 10:30 PM MT- Posted · SolicitationTue, Aug 25 · 2:00 PM MT
- Amendment · The original procurement notice has been updated with additional project details, including scope of work, principal work items, and anticipated schedule.Tue, Oct 6 · 10:31 PM MT
Report a problem
Notice as published
CO NP ROMO 407(1) Holzwarth Culvert
SOLICITATION ID: 6982AF27B000004 PROJECT NUMBER: CO FTNP ROMO 407(1) PROJECT NAME: Holzwarth Culvert PROJECT DESCRIPTION: This project will replace the deficient Holzwarth Culvert (Structure No. 1520-029S), a six-barrel corrugated metal arch pipe culvert on the Holzwarth Access Road with a steel girder bridge. Located in Rocky Mountain National Park, approximately nine miles north of Grand Lake, CO, along US HWY 34 at an elevation of 8,900 feet, the culvert conveys flow from the Colorado River and provides access to the Holzwarth Historic Site.
The purpose of this project is to prevent future roadway damage and flooding while maintaining access to employee housing, the historic site, and National Park Service and Forest Service recreation opportunities.
SCOPE OF THE WORK: The project will consist of removal of the existing six barrel culvert and construction of a new steel girder bridge with a cast in place concrete deck. New bridge abutments and micropiles. Temporary stream diversion and riprap.
New aggregate roadway surfacing. Relocation of an existing electrical line. Relocation of existing historic head gates into a new concrete slab.
The site is accessible on foot a quarter mile past the locked gate at the south end of the Holzwarth Historic Site Parking Lot and along the Holzwarth Culvert Access Road. The Holzwarth Culvert Access Road is approximately 13 wide with tight turns. Temporary widening will be necessary to prevent truck off tracking on to sensitive environmental resources.
A temporary truck turnaround will also be necessary as no construction access is allowed more than 100 west of the bridge.
PRINCIPAL WORK ITEMS: 20304-2000 Removal of Bridge: 1 EACH 30202-2000 Roadway Aggregate, Method 2: 120 TON 55504-0000 Prefabricated Steel Bridge (10 wide x 48 long modular steel vehicular bridge): 1 LPSM 56701-0000 Micropile (8.68 dia.): 180 LNFT 62801-0000 Temporary Stream Diversion: 1 LPSM ANTICIPATED SCHEDULE: Advertisement September 2026 Award December 2026 NTP December 2026 Contract Completion November 2027 ESTIMATED COST RANGE: Total estimated cost between $700,000 and $2,000,000.
What this office paid before
USAspending.gov, last 36 months8 awards matched · tier 1: this contracting office (6982AF) + PSC Y1LB. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Tue, Oct 6, 2026 · 4:04 AM MT.
This contracting office
9 other open notices from this office · buys mostly Construction, Architecture & Engineering
Similar open RFPs
same PSC Y1LBListing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.