What the agency is buying
by RFPFinder from the notice; the solicitation governsThe National Park Service is buying roadside protection along South Rim Drive. Offers will be evaluated as sealed bids.
Scope
- Remove remaining roadside hazards and install modern, crash-tested safety barriers.
- Provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation.
How to get the bid documents
The source notice lists no attachments.
Open the original listing on SAM.govDetails
- Place of performance
- Montrose, Colorado
- Buyer type
- Federal
- Notice type
- Solicitation
- Solicitation no.
- 6982AF26Q000022
- Category
- Construction
- Size standard
- $45M revenue SBA table, NAICS 237310
- Quantity
- 12 locations from notice
- Delivery location
- South Rim Drive from notice
- Period of performance
- Early April 2027 - Late May 2027 from notice
- Contract type
- Firm-fixed-price from notice
- Evaluation
- Sealed bid, price only (FAR 14) from notice
- Local presence
- Not required
- Amendments
- None since Sep 17
- Contact
- Denise Martinez
- Office
- FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Not stated in the notice: estimated value. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Tue, Oct 6 · 10:30 PM MT- Posted · SolicitationThu, Sep 17 · 7:30 AM MT
Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.
Report a problem
Notice as published
CO NP BLCA 10(1) South Rim Drive
This project is currently advertised and competed as a total small business set-aside. Plans and specifications are available.
PROJECT NUMBER: CO NP BLCA 10(1) PROJECT NAME: South Rim Drive Improvement PROJECT DESCRIPTION: The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons.
SCOPE OF THE WORK: The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve
- distinct locations along South Rim Drive.
Principal work elements include, but are not limited to, the following: Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries.
Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement.
Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings).
Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors. Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction.
To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway.
ANTICIPATED SCHEDULE: Advertisement: Mid-September 15, 2026 Award: Mid-October 2026 Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter) Construction: Early April 2027 Late May 2027 ESTIMATED COST RANGE: The estimated bid range for Schedule A is between $700,000 and $2,000,000.
What this office paid before
USAspending.gov, last 36 months25 awards matched · tier 1: this contracting office (6982AF) + PSC Y1LB. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Thu, Oct 8, 2026 · 5:14 PM MT.
This contracting office
9 other open notices from this office · buys mostly Construction, Architecture & Engineering
Related notices
Similar open RFPs
same PSC Y1LBListing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.