Get alerts
Closes tomorrowResponses due Thu, Oct 8 at 2:00 PM MT · about 15 hours left
Combined synopsisConstructionFederal buyerSB

CO NP BLCA 10(1) South Rim Drive

TRANSPORTATION, DEPARTMENT OF, Colorado · FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Verified under an hour agoAmended Sep 17Local presence required
Responses dueThu, Oct 82:00 PM MT · Colorado timeabout 15 hours left
PostedThu, Aug 65 amendments, last Oct 2
Solicitation no.6982AF26Q000022SAM.gov
Set-asideSBOnly firms holding this status can compete
Estimated value$2.0Mfrom $700K · from notice

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The National Park Service is purchasing guardrail removal, site preparation, and installation services. This is a Request for Quote (RFQ) and will be awarded on a best value basis.

Scope

  • Remove roadside hazards and install modern, crash-tested safety barriers.
  • Guardrail removal, site preparation, and installation at twelve locations along South Rim Drive.
Best valueSmall business set-asideBid opening Jan 31, 2027Local presence requiredInsurance requiredTDP access mandatory before bidQ&A closedSubmission: emailDays to respond: 1
CompetitionLikely competitive

2 signals behind this label (incumbent, repeat winner, short window, brand-name or sole-source language, prior sources sought). Pro shows them with sources.

From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.

How to get the bid documents

  1. Download the 7 stored documents below; 2 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit by email before 2:00 PM MT on Oct 8
Documents · 9 items, 9 filesDownload all (zip)
  • PDF
    Amendment A002.pdf853 KB · 2 pages
  • PDF
    QnA 10.01.2026 South Rim .pdf104 KB · 2 pages
  • PDF
    Amendment A001.pdf1.0 MB · 3 pages
  • PDF
    QnA 09.29.2026 South Rim .pdf212 KB · 2 pages
  • PDF
    QnA 09.24.2026 South Rim (3).pdf98 KB · 1 page
  • PDF
    Interested Vendors List - 9 23 2026.pdf79 KB · 1 page
  • PDF
    CO NP BLCA 10(1) South Rim Drive Plans.pdf128.5 MBToo large, open at source (128.5 MB)
  • PDF
    6982AF26Q000022.pdf2.5 MB · 96 pages
  • DOC
    FP-24external link
Open the original listing on SAM.gov

Details

Place of performance
Montrose, Colorado
Buyer type
Federal
Notice type
Combined Synopsis/Solicitation
Solicitation no.
6982AF26Q000022
Category
Construction
NAICS
NAICS 237310 (Highway, Street, and Bridge Construction): 292 open RFPs
Size standard
$45M revenue SBA table, NAICS 237310
PSC
PSC Y1LB (CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS): 32 open RFPs
Delivery location
South Rim Drive, Montrose County, Colorado from attachment p.2
Period of performance
April 2027 - May 2027 from notice
Evaluation
Best value tradeoff (FAR 15) from attachment p.10
Estimated value
$2.0M from notice
Local presence
Required
Amendments
5, last Oct 2
Contact
Denise Martinez
Office
FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Email
CFLAcquisitions@dot.gov

Not stated in the notice: contract type. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline has passed.

Key dates

Thu, Aug 6Posted
Sep 29Q&A closed
Thu, Oct 8 · 2:00 PM MTResponses due · about 15 hours left Under 14 days
Sun, Jan 31, 2027 · 12:00 PM MTBid opening
Amendment 1
Wed, Sep 23
Amendment 2
Fri, Sep 25
Amendment 3
Tue, Sep 29
Amendment 4
Thu, Oct 1
Amendment 5
Fri, Oct 2

Change log

verified Wed, Oct 7 · 10:30 PM MT
  1. Posted · Combined Synopsis/SolicitationThu, Aug 6 · 10:29 AM MT
  2. Amendment · New version of the notice posted at the sourceWed, Sep 23 · 9:34 AM MT
  3. Amendment · New version of the notice posted at the sourceFri, Sep 25 · 6:19 AM MT
  4. Amendment · New version of the notice posted at the sourceTue, Sep 29 · 7:47 AM MT
  5. Amendment · New version of the notice posted at the sourceThu, Oct 1 · 8:04 AM MT
  6. Amendment · New version of the notice posted at the sourceFri, Oct 2 · 11:38 AM MT
Report a problem

Notice as published

CO NP BLCA 10(1) South Rim Drive

This is a Request for Quote. Plans and specifications are available.

PROJECT NUMBER: CO NP BLCA 10(1) PROJECT NAME: South Rim Drive Improvement PROJECT DESCRIPTION: The National Park Service (NPS) has an immediate safety requirement to restore roadside protection along South Rim Drive following damage sustained during last year's wildfire event. The purpose of this project is to remove remaining roadside hazards and install modern, crash-tested safety barriers to restore the corridor to safe operating conditions prior to peak visitor seasons.

SCOPE OF THE WORK: The contractor shall provide all labor, materials, equipment, and supervision necessary to execute guardrail removal, site preparation, and installation across twelve

  1. distinct locations along South Rim Drive.

Principal work elements include, but are not limited to, the following: Selective Boulder Removal & Dispersal: Carefully remove, relocate, or safely set aside existing large boulder barriers at specified curves out of the active road prism/clear zone in accordance with park cultural and aesthetic boundaries.

Site Grading & Base Preparation: Execute minor grading, shoulder stabilization, and post-hole excavation at the 12 designated locations to prepare the roadside for barrier placement.

Specialized Guardrail Procurement & Installation: Supply and install steel guardrail systems featuring a weathered-look finish and structural treatments (e.g., Natina stain coatings).

Traffic Control & Sequencing: Provide comprehensive traffic control, including active one-lane closures and flagging operations, to accommodate construction activities while maintaining safety for park staff and public visitors. Prospective bidders are advised that the specialized weathered-look guardrail steel and required aesthetic coatings carry extended procurement windows (up to an 8-week lead time plus required material curing periods). Contract duration and ordering timelines are structured to accommodate this supply chain restriction.

To maximize productivity and account for high-altitude weather volatility, construction operations are anticipated to launch in early Spring (April), utilizing a combination of full road closure windows (pre-opening) and transitioning to active one-lane traffic control configurations following the seasonal opening of the roadway.

ANTICIPATED SCHEDULE: Advertisement: Mid-September 15, 2026 Award: Mid-October 2026 Notice to Proceed (NTP): Mid-October 2026 (Allows the contractor to immediately order the guardrail to absorb the 8-week lead time/curing window over the winter) Construction: Early April 2027 Late May 2027 ESTIMATED COST RANGE: The estimated bid range for Schedule A is between $700,000 and $2,000,000.

What this office paid before

USAspending.gov, last 36 months

8 awards matched · tier 1: this contracting office (6982AF) + PSC Y1LB. Most recent:

  • Sep 10HERBACK GENERAL ENGINEERING LLCCA CE SAC 570(1) NEW HOGAN PARKWAY IMPROVEMENTS REHABILITATION OF THE NEW HOGAN PARKWAY (0.8 MILES) AT THE NEW HOGAN LAKE DAY USE AREA6982AF26F00101N · DELIVERY ORDER · Federal Highway Administration · ends Jan 14, 2027$1.6M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Tue, Oct 6, 2026 · 4:04 AM MT.

This contracting office

9 other open notices from this office · buys mostly Construction, Architecture & Engineering

Duplicate postings

The same office posted this notice more than once within 14 days. Only this page is listed; the others are kept for reference.

Related notices

Similar open RFPs

same PSC Y1LB

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov