Sign inGet alerts

HI FLAP CR562(1) Kilauea Point

TRANSPORTATION, DEPARTMENT OF, Hawaii · FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Responses dueNot stated
PostedWed, Oct 14No amendments since
Solicitation no.6982AF27B000008SAM.gov
Set-asideNoneOpen to all firms
Estimated value$20Mfrom $10M · from notice

What the agency is buying

by RFPFinder from the notice; the solicitation governs

The U.S. Fish and Wildlife Service and Federal Highway Administration seek construction to improve pedestrian and bicycle access at Kilauea Point National Wildlife Refuge on Kauai, including roadway resurfacing, sidewalk installation, and safety improvements over 1.7 miles. This is a presolicitation notice; plans and specifications are not yet available, and award will follow sealed competitive bidding.

Scope

  • Roadway resurfacing, sidewalk and safety improvements at Kilauea Point, Kauai
  • 18,500 sq yd pavement removal, 5,670 sq yd sidewalk, guardrails, roundabouts, 1.7 miles
Bid opening Jan 27, 2028

How to get the bid documents

  1. Open the notice on SAM.gov
  2. Read the notice; the source lists no attachments
  3. Submit before the deadline

The source notice lists no attachments.

Open the original listing on SAM.gov

Details

Place of performance
Kilauea, Hawaii
Buyer type
Federal
Notice type
Presolicitation
Solicitation no.
6982AF27B000008
Category
Construction · beta
NAICS
NAICS 237310 (Highway, Street, and Bridge Construction)
Size standard
$45M revenue SBA table, NAICS 237310
PSC
PSC Y1LB (CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS)
Estimated value
$20M from notice
Local presence
Not required
Amendments
None since Oct 14
Contact
Stephanie Navarro
Office
FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Email
cflacquisitions@dot.gov

Not stated in the notice: contract type, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Wed, Oct 14Posted
Not statedQuestions due
Not statedResponses due
Thu, Jan 27, 2028 · 9:00 AM HSTBid opening

Change log

verified Sat, Oct 17 · 6:30 PM HST

No amendments since posting on Wed, Oct 14; verified Sat, Oct 17 · 6:30 PM HST.

Report a problem

Notice as published

HI FLAP CR562(1) Kilauea Point

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPEFICIATIONS ARE NOT AVAILBLE PROJECT NAME: HI FLAP CR562(1) Kilauea Point PROJECT DESCRIPTION: Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service. To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook.

The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook. Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists.

Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles.

PRINCIPAL WORK ITEMS: 18,500 square yards of Removal of Pavement, Asphalt 3,370 cubic yards of Roadway Excavation 2,900 ton of Roadway Aggregate, Method 2 4,200 ton of Asphalt Concrete pavement, Type 1 630 square yard of minor concrete Pavement, Reinforced 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted) 5,670 square yards of Sidewalk, Concrete 34 Accessibility Ramps, Concrete ANTICIPATED SCHEDULE: Advertise: End of October or Early November 2026 Bid Opening: December 2026 Award: January 2027 Construction: January 2027 January 2028 ESTIMATED COST RANGE: The anticipated cost range is between 10,000,000 and $20,000,000.

What this office paid before

USAspending.gov, last 36 months

25 awards matched · tier 1: this contracting office (6982AF) + PSC Y1LB. Most recent:

  • Sep 10, 2026HERBACK GENERAL ENGINEERING LLCCA CE SAC 570(1) NEW HOGAN PARKWAY IMPROVEMENTS REHABILITATION OF THE NEW HOGAN PARKWAY (0.8 MILES) AT THE NEW HOGAN LAKE DAY USE AREA6982AF26F00101N · DELIVERY ORDER · Federal Highway Administration · ends Jan 14, 2027$1.6M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Sat, Oct 17, 2026 · 5:31 PM HST.

This contracting office

6 other open notices from this office · buys mostly Construction

Similar open RFPs

same PSC Y1LB

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov