Sign inGet alerts

Closed Thu, Oct 8. Responses were due Thu, Oct 8 · 2:00 PM PT. This notice is kept for reference and no longer takes responses.

Invitation to BidCity buyer

Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project - Phase 2

City of Long Beach, California · Engineering Bureau
Responses dueThu, Oct 82:00 PM PT · California timeClosed
PostedFri, Sep 4No amendments since
Solicitation no.UD-26-358California DGS - Cal eProcure / California State Contracts Register (CSCR)
Set-asideNoneOpen to all firms

What the city is buying

from the notice as published

The work includes removal, disposal and replacement of existing butterfly valves, electric actuators, associated steel piping, Victaulic couplings and appurtenances; rehabilitation of steel spools; recoating existing surface wash water piping; replacing electrical conduits, struts and junction boxes; connection of new actuators to existing SCADA; repair of cracks in filter basins by injecting…

How to get the bid documents

Documents · 6 items, 6 files
  • DOC
    Project Specificationslogin required at source
  • DOC
    Project Planslogin required at source
  • DOC
    Addendum #1login required at source
  • DOC
    Pre-Bid Meeting Sign-inlogin required at source
  • PDF
    EO-3742 WD-05-25 Addendum 2.pdflogin required at source
  • DOC
    Addendum #3login required at source
Open the original listing on the agency portal

Details

Place of performance
California
Buyer type
City
Notice type
Invitation to Bid
Solicitation no.
UD-26-358
Amendments
None since Sep 4
Contact
Wade Depew
Office
Engineering Bureau
Email
Fernando.Eggleston@lbwater.org
Phone
(562) 570-2329

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Sep 4Posted
Sep 22Pre-bid held
Thu, Oct 8 · 2:00 PM PTResponses due · closed
Closed
Thu, Oct 8

Change log

verified Thu, Oct 8 · 11:17 AM PT
  1. Posted · Invitation to BidFri, Sep 4 · 2:14 PM PT
  2. ClosedThu, Oct 8 · 5:17 PM PT
Report a problem

Notice as published

Groundwater Treatment Plant Filter Gallery Valve Rehabilitation Project - Phase 2

The work includes removal, disposal and replacement of existing butterfly valves, electric actuators, associated steel piping, Victaulic couplings and appurtenances; rehabilitation of steel spools; recoating existing surface wash water piping; replacing electrical conduits, struts and junction boxes; connection of new actuators to existing SCADA; repair of cracks in filter basins by injecting polyurethane and associated tasks

Pre-bid conference: Bidders are required to attend a pre-bid meeting on September 22, 2026 at 11 am. To request meeting info and RSVP, email [email on the source notice] and title email- "GWTP FG VALVE REHABILITATION PROJECT PHASE 2 (EO-3742): RSVP to Pre-Bid Meeting"

Contract period: 01/01/2027 to 12/31/2027

Similar open RFPs

same contracting office

Listing collected from California DGS - Cal eProcure / California State Contracts Register (CSCR). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site