What the agency is buying
by RFPFinder from the notice and attachments; the solicitation governsThe United States Government Publishing Office is seeking a contractor to repair and renovate the G Street Sidewalk and the vault structure beneath it. Award will be based on the lowest price technically acceptable offer.
Scope
- Demolish and install sidewalk slab, repair and renovate vault beams, concrete slab, waterproofing membrane, and columns.
- Obtain permits, manage traffic control, ensure safety and security, and perform site preparation and demolition.
From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.
How to get the bid documents
- Download the 1 document below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit as the notice directs before the deadline
Details
- Place of performance
- Washington, District of Columbia
- Buyer type
- Federal
- Notice type
- Presolicitation
- Solicitation no.
- 040ADV-26-R-0010
- Category
- Construction
- Size standard
- $19M revenue SBA table, NAICS 238190
- Delivery location
- 732 North Capitol Street NW, Washington, D.C. 20401 from attachment p.9
- Period of performance
- 18 months from Notice to Proceed from notice
- Evaluation
- Lowest price technically acceptable from attachment
- Local presence
- Required
- Amendments
- None since Apr 29
- Contact
- Troy D. White
- Office
- Acquisition Services
- twhite@gpo.gov
Not stated in the notice: estimated value, contract type. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Fri, Oct 9 · 12:30 AM ETNo amendments since posting on Wed, Apr 29; verified Fri, Oct 9 · 12:30 AM ET.
Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.
Report a problem
Notice as published
GPO G-Street Sidewalk Repair
This is a pre-solicitation synopsis for a competitive solicitation that GPO intends to post on SAM.gov on or about May 11, 2026. The scope of work includes: The concrete sidewalk and the vault structure beneath the G Street Sidewalk are showing signs of moderate to severe deterioration of the concrete and the encased structural framing. Over time and a failure of the waterproofing membrane, salt water, and other liquids constantly migrate into the reinforced slab and cause deterioration substantial damages.
The contractor shall provide the labor, material, equipment, and supervision to demolish and install the sidewalk slab and to repair and renovate the vaults beams, concrete slab, waterproofing membrane, and columns and other related structures to eliminate the water migration into the basement. All the work shall be in accordance with the design drawings and specifications prepared and submitted along with this statement of work. The contractor is required to obtain permits, traffic control plans, safety, and security approval prior to construction starting.
The contractor shall complete the following tasks as part of the project at the GPO G Street Sidewalk Repair: Pre-Construction Tasks Obtain all required permits and approvals. Submit project schedule, safety plan, and traffic control plan. Coordinate with GPO project management and stakeholders.
Conduct pre-construction meetings and site walkthrough. Site Preparation & Demolition Install temporary barriers, signage, and traffic control measures. Set up designated staging and material storage areas.
Perform selective demolition of existing structures as required. Ensure safe removal and disposal of construction debris. Material Delivery & Logistics Coordinate material deliveries in compliance with schedule.
Inspect and verify all materials upon arrival. Store materials in designated secure areas. Construction & Installation Perform site grading and preparation, if applicable.
Install structural components, framing, and support systems. Complete mechanical, electrical, and plumbing (MEP) installations. Install architectural finishes, including flooring, ceilings, and walls.
Implement weatherproofing and insulation systems as required. Conduct equipment and systems testing to ensure functionality. Safety & Compliance Maintain compliance with OSHA and other regulatory standards.
Implement and monitor safety protocols for workers and pedestrians. Address any environmental concerns, including hazardous material handling. Quality Control & Inspections Conduct periodic quality control checks.
Submit required inspection and testing reports. Address any deficiencies noted in inspections. Project Closeout Complete all final construction activities and finishing work.
Conduct a final walkthrough with the GPO project team. Prepare and submit as-built drawings and O&M manuals. Resolve punch list items and obtain final acceptance.
Restore site and remove temporary facilities. Submit final project documentation, including warranties and certifications Period of Performace is eighteen
- months from Notice to Proceed.
A site visit will be scheduled and listed in the solicitation.
Similar federal awards · PSC Z1AZ
USAspending.gov, last 36 months25 awards matched · tier 3: PSC Z1AZ at any agency; nothing from this office or agency. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Tue, Oct 6, 2026 · 6:13 AM ET.
This contracting office
2 other open notices from this office · buys mostly IT & Software, Equipment Maintenance & Repair, Construction
Similar open RFPs
same PSC Z1AZListing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.