Sign inGet alerts

Closed Mon, Oct 5. Responses were due Wed, Sep 30 · 1:00 PM MST. This notice is kept for reference and no longer takes responses.

Invitation for bidsFederal buyerSB

AZ BL COLO 7528(1) Burro Creek Road

TRANSPORTATION, DEPARTMENT OF, Arizona · FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Unverified · check source
Responses dueWed, Sep 301:00 PM MST · Arizona timeClosed
PostedTue, Sep 15No amendments since
Solicitation no.6982AF27B000002SAM.gov
Set-asideSBOnly firms holding this status can compete

What the agency is buying

from the notice as published

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Burro Creek Road PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255…

Small business set-aside

How to get the bid documents

Attachment list not pulled yet; check the source notice.

Open the original listing on SAM.gov

Details

Place of performance
Kingman, Arizona
Buyer type
Federal
Notice type
Presolicitation
Solicitation no.
6982AF27B000002
NAICS
NAICS 237310 (Highway, Street, and Bridge Construction): 304 open RFPs
Size standard
$45M revenue SBA table, NAICS 237310
PSC
PSC Y1LB (CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS): 32 open RFPs
Amendments
None since Sep 15
Contact
Eric Grosskreuz
Office
FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Email
cflcontracts@dot.gov

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Tue, Sep 15Posted
Not statedQuestions due
Wed, Sep 30 · 1:00 PM MSTResponses due · closed
Closed
Mon, Oct 5

Change log

verified Tue, Oct 6 · 9:30 PM MST
  1. Posted · PresolicitationTue, Sep 15 · 2:59 AM MST
  2. ClosedMon, Oct 5 · 3:35 AM MST

Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.

Report a problem

Notice as published

AZ BL COLO 7528(1) Burro Creek Road

THIS IS NOT AN INVITATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILABLE Small Business Set-Aside PROJECT NUMBER: AZ FLAP PIM FR510(1) PROJECT NAME: Burro Creek Road PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy

  1. The project's length is approximately 1.3 miles.

SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.

Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.

Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.

PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement October 2026 Award-January - 2027 Construction January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

What this office paid before

USAspending.gov, last 36 months

25 awards matched · tier 1: this contracting office (6982AF) + PSC Y1LB. Most recent:

  • Sep 10, 2026HERBACK GENERAL ENGINEERING LLCCA CE SAC 570(1) NEW HOGAN PARKWAY IMPROVEMENTS REHABILITATION OF THE NEW HOGAN PARKWAY (0.8 MILES) AT THE NEW HOGAN LAKE DAY USE AREA6982AF26F00101N · DELIVERY ORDER · Federal Highway Administration · ends Jan 14, 2027$1.6M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Sat, Oct 10, 2026 · 8:35 PM MST.

This contracting office

8 other open notices from this office · buys mostly Construction, Architecture & Engineering

Similar open RFPs

same PSC Y1LB

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov