What the agency is buying
from the notice as publishedOverview of the project: The U.S. Embassy has a project requirement to repair a section of the 103 Roi Baudouin residence Compound front perimeter wall that collapsed due to a big tree roof and a heavy rain. In addition to the collapsed portion, several addition feet will need to be rebuilt due to be unstable after the collapse. The wall is estimated to be 22m long, with the exact length needed…
How to get the bid documents
Attachment list not pulled yet; check the source notice.
Open the original listing on SAM.govDetails
- Place of performance
- Kinshasa, CD
- Buyer type
- Federal
- Notice type
- Solicitation
- Solicitation no.
- 19CG50-26-R-0010
- Size standard
- $19M revenue SBA table, NAICS 238190
- Amendments
- None since Jul 20
- Contact
- Vernetta Wheeler
- Office
- U.S.EMBASSY KINSHASA
- Phone
- 243815560151
Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule, quantity, FOB terms. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Closed
- Mon, Oct 5
Change log
verified Wed, Oct 7 · 12:30 AM ET- Posted · SolicitationMon, Jul 20 · 9:17 AM ET
- ClosedMon, Oct 5 · 6:35 AM ET
Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.
Report a problem
Notice as published
19CG5026R0010 - Front Perimeter Wall Repair
Overview of the project: The U.S. Embassy has a project requirement to repair a section of the 103 Roi Baudouin residence Compound front perimeter wall that collapsed due to a big tree roof and a heavy rain. In addition to the collapsed portion, several addition feet will need to be rebuilt due to be unstable after the collapse.
The wall is estimated to be 22m long, with the exact length needed to be repaired to be revealed during the walkthrough stage of the project solicitation. The contractor will also make sure to replace the damaged electrical wire as well as lights, to replace the concertina wire, backfill the entrance parking and then replace the pavers. The selected contractor will supply all labor, materials and equipment required to successfully complete this project.
All material will be inspected and approved by the Contracting Officer Representative (COR) before installation can start. The project must be completed in 60 days, and the offer must be submitted in English. SEE ATTACHED DOCUMENT FOR FULL SOLICITATION AND SCOPE OF WORK
Similar federal awards · PSC 5620
USAspending.gov, last 36 months8 awards matched · tier 3: PSC 5620 at any agency; nothing from this office or agency. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards for this key have not been synced yet.
This contracting office
1 other open notice from this office · buys mostly Audit & Accounting
Similar open RFPs
same NAICS 238190Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.