What the agency is buying
by RFPFinder from the notice and attachments; the solicitation governsThe U.S. Coast Guard Ketchikan, Alaska is procuring removal of existing carpet and installation of new carpet on the third floor of the administrative building. The contract will be awarded to the lowest-priced, technically acceptable, qualified contractor using sealed-bid evaluation.
Scope
- Remove existing carpet and install new carpet on third floor administrative building
- Work includes all hallways and specified areas per attached map and SOW
From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.
How to get the bid documents
- Download the 20 documents below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit as the notice directs before 11:00 AM AKT on Oct 30
Details
- Place of performance
- Ketchikan, Alaska
- Buyer type
- Federal
- Notice type
- Combined Synopsis/Solicitation
- Solicitation no.
- UNITEDSTATESCOASTGUARDKETCHNEWCARPET
- Categories
- Construction, Supplies & Equipment
- Size standard
- $19M revenue SBA table, NAICS 238330
- Quantity
- 1 project from notice
- Delivery location
- USCG Base Ketchikan, Alaska, Administrative Building, Third Floor from notice
- Period of performance
- Award and start date contingent on funding; expected November 2026 from notice
- Contract type
- Firm-fixed-price from notice
- Local presence
- Not required
- Amendments
- 13, last Oct 9
- Contact
- DENO STAMOS
- Office
- US COAST GUARD · BASE KETCHIKAN(00035)
Not stated in the notice: estimated value, FOB terms. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Amendment 1
- Mon, Sep 21
- Amendment 2
- Tue, Sep 22
- Amendment 3
- Wed, Sep 23
- Amendment 4
- Fri, Sep 25
- Amendment 5
- Fri, Sep 25
- Amendment 6
- Mon, Sep 28
- Amendment 7
- Tue, Oct 6
- Amendment 8
- Tue, Oct 6
- Amendment 9
- Tue, Oct 6 · The anticipated award date has been updated to November 2026.
- Amendment 10
- Wed, Oct 7 · description text changed
- Amendment 11
- Thu, Oct 8 · description text changed
- Amendment 12
- Fri, Oct 9 · The anticipated award date has been specified as November 2026, with additional details about the scope of work and contract requirements.
- Amendment 13
- Fri, Oct 9 · description text changed
Change log
verified Fri, Oct 9 · 8:30 PM AKT- Posted · Combined Synopsis/SolicitationMon, Sep 21 · 5:15 AM AKT
- Amendment · New version of the notice posted at the sourceMon, Sep 21 · 8:23 AM AKT
- Amendment · New version of the notice posted at the sourceTue, Sep 22 · 8:04 AM AKT
- Amendment · New version of the notice posted at the sourceWed, Sep 23 · 4:35 AM AKT
- Amendment · New version of the notice posted at the sourceFri, Sep 25 · 3:50 AM AKT
- Amendment · New version of the notice posted at the sourceFri, Sep 25 · 9:54 AM AKT
- Amendment · New version of the notice posted at the sourceMon, Sep 28 · 8:57 AM AKT
- Amendment · New version of the notice posted at the sourceTue, Oct 6 · 8:40 AM AKT
- Amendment · New version of the notice posted at the sourceTue, Oct 6 · 4:00 PM AKT
- Amendment · The anticipated award date has been updated to November 2026.Tue, Oct 6 · 8:31 PM AKT
- Updated · description text changedWed, Oct 7 · 8:31 PM AKT
- Amendment · description text changedWed, Oct 7 · 8:31 PM AKT
- Updated · description text changedThu, Oct 8 · 8:31 PM AKT
- Amendment · description text changedThu, Oct 8 · 8:31 PM AKT
- Updated · description text changedFri, Oct 9 · 8:31 PM AKT
- Amendment · description text changedFri, Oct 9 · 8:31 PM AKT
- Amendment · The anticipated award date has been specified as November 2026, with additional details about the scope of work and contract requirements.Fri, Oct 9 · 8:31 PM AKT
Report a problem
Notice as published
UNITED STATES COAST GUARD KETCHIKAN ALASKA NEW CARPET INSTALLATION
ANTICIPATED AWARD DATE/START OF CARPET INSTALLATION SERVICES SHALL BE CONTINGENT ON AVAILABILTY OF A FUNDED AWARD. EXPECT AWARD & START DATE TO BE November OF 2026.
CLIN: 0001 Schedule of Supplies/Services Qty 01 Unit: PROJECT Unit Price Total Amount REMOVAL/DISPOSAL OF OLD CARPET AND INSTALLATION OF NEW CARPET INSTALLATION AS SPECIFIED IN ATTACHED SOW, SPECS AND MAP- Base Ketchikan ****ENTIRE THIRD FLOOR/DECK INCLUDING ALL HALLWAYS. SEE ATTACHED MAP. AGAIN= ENTIRE THIRD FLOOR/DECK INCLUDING ALL HALLWAYS.
1 EACH : $ Total $ Total Contract Value $ *The Contractor shall also include regular and overtime rates for any other labor categories proposed. Preparation of this quote is completely voluntary and shall be submitted to the United States Government by date specified herein . ****This shall be awarded to the LOWEST PRICED/ TECHNICALLY ACCEPTABLE/ QUALIFIED CONTRACTOR AND IS CONTINGENT ON THE UNITED STATES COAST GUARD SECURING PROPER FUNDING. 1.0 General 1.1 Background The United States Coast Guard (USCG) is procuring NEW CARPET INSTALLATION Services & REMOVAL/DISPOSAL OF CURRENT CARPET as described within this PWS for USCG Base Ketchikan, AK.
Base Ketchikan serves as the single touch point for the support of Coast Guard operations within the 17th Coast Guard District, standing shoulder-to-shoulder with our operational partners to ensure the delivery of professional, responsive, and cost-effective services to the American public. 1.2 Scope The Contractor shall provide the proper mix of personnel, management, supervision, materials, supplies, equipment, tools, transportation, and other items or services (except utilities and limited facilities as defined in section 12.0) necessary to accomplish the CARPET REMOVAL AND INSTALLATION OF BRAND NEW CARPET services required by this PWS. The efforts to be accomplished under this contract are scalable in nature to include other tasks, services, or locations within scope, as required.
The contractor is encouraged to assess the work requirements and recommend revisions that would provide beneficial savings to the contractor and the government. 1.2.1 REMOVE EXISTING CARPET AND INSTALL BRAND NEW CARPETcleaning Base Ketchikan for: Administrative building 3RD FLOOR ONLY. a.
GENERAL REQUIREMENTS: b.
Services to Be Preformed: Carpet REMOVAL AND INSTALLATION OF NEW CARPET is required at each location specified below as determined by the Contracting Officer's Representative (COR). The Contractor shall provide all necessary labor, equipment, and supplies required to perform these services. All cleaning procedures and treatment shall be accomplished in accordance with the manufacturer's directions and/or listed specifications and industry standards applicable to the Professional Cleaning & Restoration Industry.
1.2.2 Location of Work Performance: Administrative building 3rd Floor SEE ATTACHED MAP FOR: sqft 2.3 Work Hours: All carpet REMOVAL AND NEW installation services shall be performed between the hours of 0700 and 1630 AKST. Monday through Friday or by appointment scheduled in advance. The Contractor shall notify the designated Contracting Officer Representative of any deviations to the previously agreed upon appointment and schedule an alternate appointment carpet cleaning.
No keys to Government facilities are to be provided to Contractors under any circumstances. 3.
PERFORMANCE REQUIREMENTS: OLD CARPET SHALL BE REMOVED AND BRAND NEW CARPET SHALL BE INSTALLED IN according to industry standard to protect the investment as part of a maintenance program that will preserve the appearance and extend the life of the carpet. The contractor will develop a cost-effective cleaning strategy, plan, and schedule. MAPS OF AREAS WITH CARPET TO BE REMOVED AND NEW CARPET INSTALLED- SEE ATTACHMENT
Similar federal awards · PSC 7220
USAspending.gov, last 36 months25 awards matched · tier 3: PSC 7220 at any agency; nothing from this office or agency. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Fri, Oct 9, 2026 · 8:50 PM AKT.
This contracting office
No other open notices from this office · buys mostly Supplies & Equipment, Construction
Similar open RFPs
same PSC 7220Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.