What the agency is buying
by RFPFinder from the notice and attachments; the solicitation governsThe Department of Agriculture seeks a contractor to replace 4 miles of asbestos cement water pipe with HDPE pipeline, valves and connections in Utah's Ashley National Forest, starting spring 2027 for 90 calendar days. Sealed bids are due November 21, 2026 at 10:00 PM UTC; this is a small-business set-aside.
Scope
- Replace 4 miles asbestos cement pipe with 4-inch HDPE water main and valves.
- Install 4,450 linear feet of pipeline, cover 1,150 linear feet, install air-vacuum valves and connections.
How to get the bid documents
- Download the 10 documents below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit as the notice directs before 3:00 PM MT on Nov 21
Details
- Place of performance
- VERNAL, Utah
- Buyer type
- Federal
- Notice type
- Combined Synopsis/Solicitation
- Solicitation no.
- 1240LT-27-Q-0022
- Category
- Construction · beta
- Size standard
- $45M revenue SBA table, NAICS 237110
- Delivery location
- Flaming Gorge Ranger District, Ashley National Forest, Daggett County, Utah from notice
- Period of performance
- Spring 2027, 90 calendar days from notice
- Local presence
- Not required
- Amendments
- 1, last Oct 22
- Contact
- Derrick A Dodson
- Office
- FOREST SERVICE · ASHLEY NATIONAL FOREST
Not stated in the notice: estimated value. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Amendment 1
- Thu, Oct 22
Change log
verified Fri, Oct 23 · 12:01 PM MT- Posted · Combined Synopsis/SolicitationWed, Oct 21 · 6:00 PM MT
- Amendment · New version of the notice posted at the sourceThu, Oct 22 · 6:00 PM MT
Report a problem
Notice as published
Ross Springs Waterline Replacement
This project includes the replacement of 4 asbestos cement pipe (abandoned in place) with 4 HDPE water main and associated valves and connections to laterals. The work includes; Installation of 4450 linear feet of 4 HDPE pipeline, most of which will be shallow bury or laid on cleared ground and covered with imported fill from a government source. Cover an additional 1150 linear feet of existing pipeline with imported fill from a government source.
Installation of 2 combination air-vacuum valves with utility boxes. Installing associated valves, daylight drains, and pumpout drains; and connecting to existing lateral mains and services.
Similar Forest Service awards · PSC Z2NE
USAspending.gov, last 36 months5 awards matched · tier 2: Forest Service + PSC Z2NE; nothing from this office. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards for this key have not been synced yet.
This contracting office
No other open notices from this office · buys mostly Construction
Similar open RFPs
same PSC Z2NEListing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.