Sign inGet alerts
Request for quotesConstructionFederal buyer

Request for Quotations (RFQ) - Trenching, Underground Conduit Installation and Associated Civil Works

Verified 15 h agoLocal presence required
Responses dueTue, Nov 34:00 AM ET24 days left
PostedThu, Oct 8No amendments since
Solicitation no.19SF20-27-Q-0001SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The U.S. Consulate General Cape Town seeks a contractor for trenching, underground conduit installation, handhole installation, fence post extensions, and associated civil works at its compound. The Government will award a firm-fixed-price purchase order to the lowest-priced technically acceptable quotation.

Scope

  • Trenching, underground conduit and handhole installation with site preparation and backfilling
  • Extension of 13 perimeter fence posts for security camera installation
Lowest price, technically acceptableLocal presence requiredMandatory pre-bid Oct 27Insurance requiredTDP access mandatory before bidQ&A closes Oct 30Days to respond: 24

How to get the bid documents

  1. Download the 8 documents below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit as the notice directs before 4:00 AM ET on Nov 3
Documents · 8 items, 8 filesDownload all (zip) · Pro
  • PDF
    287cddb1be114710af62920fa9da9923.pdf1.1 MB · 13 pages
  • JPG
    964ad15d22104ffaa0013515d2ac82c3.jpg7.0 MB
  • JPG
    a40a62ec32e64f888b3caf96d75f4d22.jpg6.1 MB
  • XLSX
    d5210fbae78445bfb99b9f57649cbadb.xlsx12 KB
  • XLSX
    Cape_Town_Trenching_Pricing_Schedule_DBA.xlsx12 KB
  • JPG
    WLK_5826.JPG6.1 MB
  • JPG
    WLK_5705.JPG7.0 MB
  • PDF
    Cape Town-PME-26004 LCP 100 Percent Submission Approved.pdf1.1 MB · 13 pages
Open the original listing on SAM.gov

Details

Place of performance
Cape Town, ZA
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
19SF20-27-Q-0001
Category
Construction
NAICS
NAICS 237130 (Power and Communication Line and Related Structures Construction)
Size standard
$45M revenue SBA table, NAICS 237130
PSC
PSC Y1NZ (CONSTRUCTION OF OTHER UTILITIES): 8 open RFPs
Delivery location
U.S. Consulate General Cape Town, Cape Town, South Africa from notice
Contract type
Firm-fixed-price from notice
Evaluation
Lowest price technically acceptable from notice
Local presence
Required
Amendments
None since Oct 8
Contact
Natheer Ford
Office
AMERICAN CONSULATE CAPE TOWN
Email
fordn@state.gov
Phone
0217027300

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline.

Key dates

Thu, Oct 8Posted
Fri, Oct 30 · 10:00 AM ETQuestions due · 20 days
Tue, Oct 27 · 10:00 AM ETPre-bid meeting Mandatory
Tue, Nov 3 · 4:00 AM ETResponses due · 24 days left
Pre-bid location
U.S. Consulate General Cape Town

Change log

verified Sat, Oct 10 · 12:30 AM ET

No amendments since posting on Thu, Oct 8; verified Sat, Oct 10 · 12:30 AM ET.

Report a problem

Notice as published

Request for Quotations (RFQ) - Trenching, Underground Conduit Installation and Associated Civil Works

  1. General Summary of Services Required The U.S. Consulate General Cape Town invites qualified contractors to submit quotations for trenching, underground conduit installation, handhole installation, extension of thirteen
  2. existing perimeter fence posts for security camera installation, and associated civil works at the U.S.

Consulate compound in Cape Town. The contractor shall provide all labor, supervision, contractor-furnished materials, equipment, tools, transportation, safety measures, and incidentals necessary to complete the work in accordance with the attached Scope of Work and Design Layout Package, Cape TownPME26004, 100% Design, dated July 21, 2026, and the additional requirements identified in this solicitation. Work includes, but is not limited to: Site preparation, excavation, and trenching along designated routes.

Installation of underground conduits, handholes, and associated infrastructure. Protection of existing underground utilities and surrounding infrastructure. Backfilling, compaction, and reinstatement of disturbed surfaces.

Site safety, waste removal, and final cleanup. Extension of existing perimeter fence posts at thirteen

  1. designated locations to accommodate the installation of new security cameras.

Government-Furnished and Contractor-Furnished Materials The U.S. Government will provide the conduits and handholes required for the trenching works. The contractor shall provide all remaining materials, including sand, soil, gravel, backfill materials, and other consumables necessary to complete the installation.

The contractor shall also provide all labor, supervision, tools, equipment, transportation, and incidentals necessary to install the Government-furnished conduits and handholes. Perimeter Fence Post Extensions 13 Locations In addition to the trenching works, the contractor shall extend the existing perimeter fence posts at thirteen

  1. designated locations to accommodate new security cameras.

The contractor shall provide all materials, labor, equipment, tools, and incidentals necessary to complete this work. The attached reference photographs illustrate examples of the required fence post extensions. Contractors shall review these photographs and assess the work during the site visit.

Any clarification regarding the required extensions must be requested before the clarification closing date. Both the trenching works and the thirteen

  1. fence post extensions must be included in the contractor's total firm-fixed-price quotation.

The attached Scope of Work and Design Layout Package governs the technical requirements for the work described therein, supplemented by the additional requirements expressly identified in this solicitation. Contractors are responsible for reviewing the complete package and including all necessary costs in their quotations. 2.

Contract Details and Evaluation The Government intends to award a firm-fixed-price purchase order to the responsible offeror submitting the lowest-priced technically acceptable (LPTA) quotation. Technical acceptability will be evaluated on a Technically Acceptable / Not Technically Acceptable basis against the following minimum requirements: Technical Approach: Demonstrated understanding of the Scope of Work and Design Layout Package and a practical methodology for completing the requirement.

Relevant Experience: Evidence of at least two comparable completed trenching, underground utility, or civil construction projects, supported by contactable references.

CIDB Registration: Active registration with the Construction Industry Development Board (cidb), with a minimum grading designation of 3 in the applicable class of construction works.

Professional Engineering Qualifications: Employment of a Civil Engineer or Professional Engineering Technologist registered with the Engineering Council of South Africa (ECSA).

Site Manager/Engineer Experience: Demonstrated recent experience supervising setting out, trenching, shoring, dewatering, steel fixing, formwork, concrete placement, and piping/conduit installation.

Personnel and Resources: Availability of appropriately qualified personnel, equipment, and resources to complete the work.

Project Schedule: Demonstrated ability to complete the work within the required timeframe.

Health and Safety: Adequate preliminary safety methodology addressing the applicable construction and excavation hazards.

Scope Compliance: Confirmation that the quotation covers the complete Scope of Work and Design Layout Package without material exclusions or deviations. Only technically acceptable quotations will be considered for award based on price. The Government may award based on initial quotations without discussions.

  1. Interested Vendors / Mandatory Site Visit Interested contractors must possess the necessary construction experience, professional qualifications, registrations, equipment, and resources to complete the requirement. A mandatory site visit will be conducted as follows: Date: Tuesday, October 27, 2026 Time: 10:00 AM SAST Location: U.S.

Consulate General Cape Town Attendance Confirmation Deadline: Friday, October 23, 2026 Prospective offerors must confirm attendance before the deadline and provide the full name, ID number, contact number, vehicle make, model, and colour of each representative attending. Contractors who fail to provide the required information by the deadline may be denied access to the compound. Attendance at the mandatory site visit is required for quotation eligibility.

All technical questions must be submitted in writing by Friday, October 30, 2026 at 10:00 AM SAST . Official clarifications and amendments will be issued through SAM.gov, as applicable. 4.

Proposal Submission Requirements Offerors must submit the following as part of their quotation: Company Profile: Brief company background and description of relevant construction capabilities.

Relevant Experience: Details of at least two comparable completed projects, including project descriptions and contactable references.

Technical Approach / Work Plan: Brief methodology demonstrating an understanding of the Scope of Work and Design Layout Package and the proposed approach to completing the work.

Contractor Registration, Professional Qualifications and Experience: CIDB Registration: Proof of active cidb registration with a minimum grading designation of 3 in the applicable class of construction works.

ECSA Registration: Evidence that the contractor employs a Civil Engineer or Professional Engineering Technologist registered with ECSA, including proof of current registration.

Site Manager/Engineer: CV and supporting experience demonstrating recent supervision of setting out, trenching, shoring, dewatering, steel fixing, formwork, concrete placement, and piping/conduit installation.

Project Schedule: Proposed commencement date, work duration, and completion period.

Health and Safety: Preliminary site-specific safety methodology addressing the principal construction and excavation risks. The successful contractor shall submit a comprehensive site-specific safety plan before commencement.

Completed Pricing Schedule: Detailed firm-fixed-price quotation using the attached pricing schedule, covering all labor, contractor-furnished materials, equipment, trenching, installation of Government-furnished conduits and handholes, backfilling, reinstatement, and associated costs. The quotation must also include a separately priced line item for extending the existing perimeter fence posts at thirteen

  1. locations, inclusive of all required contractor-furnished materials, labor, equipment, and installation costs.

Both the trenching works and fence post extensions shall be included in the total firm-fixed-price quotation.

NDAA Compliance: Completed Express NDAA Certificate for Vendor Compliance.

Defense Base Act (DBA) Insurance: The successful contractor shall be required to obtain and maintain Defense Base Act (DBA) insurance in accordance with the applicable U.S. Government contract requirements. Offerors must include the cost of DBA insurance in their quotation and separately identify the insurance premium under CLIN 0009 of the attached pricing schedule.

This cost must be included in the total firm-fixed price. Proof of the required DBA insurance coverage must be provided before commencement of work. For information on obtaining DBA insurance, including a list of U.S.

Department of Labor-authorized insurance carriers, please visit: https://www.dol.gov/agencies/owcp/dlhwc/lscarrier Pricing Requirements: The attached pricing schedule must be completed and submitted with the quotation. Quantities and unit rates must be provided for applicable work elements, with all costs included in the total firm-fixed price. Contractors must verify quantities against the Scope of Work and Design Layout Package and raise any discrepancies before the quotation closing date.

Prices must be quoted in South African Rand (ZAR), with VAT separately identified. Any exclusions, assumptions, or deviations must be clearly identified. Material deviations may result in a quotation being determined technically unacceptable.

The total price must cover the complete requirement, including all incidental work necessary for satisfactory completion. 5. Project Completion and Scope Control The contractor shall complete the work within 4-6 Weeks following the authorized commencement date.

All construction activities, safety requirements, site protection, reinstatement, and completion obligations shall be performed in accordance with the attached Scope of Work and Design Layout Package and the resulting purchase order. Any unforeseen site conditions or proposed changes affecting the scope, price, or completion period must be promptly reported to the Government. No changes or additional work may proceed without prior written authorization from the Contracting Officer.

  1. Quotation Submission Instructions Please note the following BEFORE submitting your offer: Solicitation Number: 19SF2027Q0001 Closing Date: Tuesday, November 3, 2026 at 10:00 SAST Submission Email: [email on the source notice] Questions Deadline: Friday, October 30, 2026 at 10:00 AM SAST All quotations and supporting documents must be submitted electronically and in English. The solicitation number must appear in the email subject line.

The completed pricing schedule must accompany the quotation. Quotations must remain valid for at least 30 calendar days after the closing date. Offerors must complete the attached Express NDAA Certificate for Vendor Compliance.

As a Diplomatic Mission representing the U.S. Government, the U.S. Consulate cannot sign vendor contracts, credit applications, or separate vendor terms and conditions.

Any vendor terms or conditions inconsistent with the Government's solicitation or resulting purchase order shall not apply unless expressly accepted by the Contracting Officer. 7. Payment Terms The Government intends to award a firm-fixed-price purchase order covering the complete requirement.

No adjustments will be made for material price increases or exchange-rate fluctuations after award, except as authorized under the resulting purchase order. Payment will be made via Electronic Funds Transfer (EFT) following satisfactory completion, Government acceptance, and receipt of a proper invoice, in accordance with the purchase order terms. Advance payments and deposits are not permitted.

Note: Procurement will acknowledge receipt of quotations within four

  1. business days.

If confirmation is not received, offerors should contact Procurement before the quotation deadline to verify receipt.

Similar federal awards · PSC Y1NZ

USAspending.gov, last 36 months

25 awards matched · tier 3: PSC Y1NZ at any agency; nothing from this office or agency. Most recent:

  • Sep 24CLASSIC SITE SOLUTIONS INCMINUTE MAN NHP - DOMESTIC WATER IMPROVEMENTS140P4326C0034 · DEFINITIVE CONTRACT · SMALL BUSINESS SET ASIDE - TOTAL · National Park Service · ends Aug 27, 2027$378K
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards for this key have not been synced yet.

This contracting office

No other open notices from this office · buys mostly Construction

Similar open RFPs

same PSC Y1NZ

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov