Sign inGet alerts

Compliance checklist

Pre-Advertisement Notice for Grove Park Recreation Center Design Build · PE-66062-NONST-2027-000000492. 160 requirement sentences found in the notice and 6 attachments: every "shall", "must" and "required", quoted as written and sorted into submission requirements (3) and performance / contract clauses (157). Nothing is generated.

Pro

The full checklist is a Pro feature

160 requirement sentences on this RFP. Pro shows every one, grouped by section, with a CSV export, for $39/mo. Below is a preview.

Sign in or upgrade

Submission requirements · 3

Draft Grove Park DB Design Criteria_ SOW_1005.pdf · SECTION 1 INTRODUCTION · 2

Draft Grove Park DB Design Criteria_ SOW_1005.pdf · 1.5 Drawing Formats and Requirements · 1

Performance / contract clauses · 157

Draft Grove Park DB Design Criteria_ SOW_1005.pdf · 1.1.1 Overview · 1

Draft Grove Park DB Design Criteria_ SOW_1005.pdf · SECTION 1 INTRODUCTION · 2

Extracted from the notice text and attachments as published. The solicitation governs; read Sections L and M in full before you submit.