Sign inGet alerts

Closed Wed, Oct 7. Responses were due Wed, Oct 7 · 2:00 PM ET. This notice is kept for reference and no longer takes responses.

Non-State AgencyConstructionCity buyer

POOLER PARKWAY AT BENTON BOULEVARD, MILL CREEK CIRCLE, AND I-95 SOUTHBOUND RAMPS POOLER.

Unverified · check source
Responses dueWed, Oct 72:00 PM ET · Georgia timeClosed
PostedFri, Aug 28No amendments since
Solicitation no.PE-66418-NONST-2026-000000023Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace
Set-asideNoneOpen to all firms

What the city is buying

by RFPFinder from the notice and attachments; the solicitation governs

The City of Pooler is seeking a contractor to construct approximately 3,725 linear feet of roadway, including modification of a signalized intersection, sidewalks, and drainage improvements.

Scope

  • Construction of approximately 3,725 linear feet of roadway
  • Modification of a signalized intersection, sidewalks, drainage improvements, and erosion control
Submission: physical
CompetitionCompetition unknownNo award history or sole-source language found for this buyer and code.

From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.

How to get the bid documents

Documents · 8 items, 8 filesDownload all (zip) · Pro
  • PDF
    Bid Sheet.pdf585 KB · 2 pages
  • PDF
    Section 108 Prosecution and Progress.pdf555 KB · 3 pages
  • PDF
    Invitation to Bid attachments.pdf1014 KB · 6 pages
  • PDF
    Invitation to Bid.pdf9.6 MB · 31 pages
  • PDF
    Addendum I _Pooler Parkway at Benton Blvd_Mi.pdf9 KB · 2 pages
  • PDF
    Addendum I Plan and profile of proposed.pdfat source
  • PDF
    Addendum I Plan.pdf245 KB · 3 pages
  • PDF
    Addendum I Responses.pdf3.9 MB · 8 pages
Open the original listing on the agency portal

Details

Place of performance
Georgia
Buyer type
City
Notice type
Non-State Agency
Solicitation no.
PE-66418-NONST-2026-000000023
Category
Construction
Local presence
Not required
Amendments
None since Aug 28
Email
tboltllc@gmail.com

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Aug 28Posted
Not statedQuestions due
Wed, Oct 7 · 2:00 PM ETResponses due · closed
Closed
Wed, Oct 7

Change log

verified Wed, Oct 7 · 8:16 AM ET
  1. Posted · Non-State AgencyFri, Aug 28 · 3:57 PM ET
  2. ClosedWed, Oct 7 · 2:17 PM ET
Report a problem

Notice as published

POOLER PARKWAY AT BENTON BOULEVARD, MILL CREEK CIRCLE, AND I-95 SOUTHBOUND RAMPS POOLER.

The work will include all equipment, materials, supplies, labor, and all other costs associated with construction of approximately 3,725 linear feet of roadway. The roadway includes the modification of a signalized intersections, sidewalks, drainage improvements, installation and maintenance of erosion, sediment and pollution control BMPs and final site stabilization. All work under this contract shall be done in accordance with the Georgia Department of Transportation (GDOT)

Similar open RFPs in Georgia

same contracting office

Listing collected from Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site