What the city is buying
by RFPFinder from the notice and attachments; the solicitation governsThe City of Sandy Springs seeks bids from qualified contractors to construct approximately 340 linear feet of six-foot-wide sidewalk with landscape strip, curb, gutter, and related site work near Dunwoody Road. This is an invitation to bid with sealed bids opened via Microsoft Teams; award goes to the lowest responsive responsible bidder.
Scope
- Construct 340 linear feet of six-foot-wide sidewalk with two-foot landscape strip
- Curb and gutter installation, grading, pavement markings, signage, utility adjustments, erosion control, and traffic management
How to get the bid documents
- Download the 4 documents below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit by portal before 2:00 PM ET on Nov 13
Details
- Place of performance
- Georgia
- Buyer type
- City
- Notice type
- Non-State Agency
- Solicitation no.
- PE-66098-NONST-2027-000000152
- Category
- Construction · beta
- Quantity
- 340 linear feet from notice
- Delivery location
- Dunwoody Road and Spalding Drive, Sandy Springs, Georgia from notice
- Contract type
- Firm-fixed-price from attachment p.1
- Evaluation
- Sealed bid, price only from attachment
- Local presence
- Required
- Amendments
- None since Oct 13
Not stated in the notice: estimated value, period of performance. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline.
Key dates
- Pre-bid location
- Microsoft Teams (virtual)
Change log
verified Wed, Oct 14 · 8:16 PM ETNo amendments since posting on Tue, Oct 13; verified Wed, Oct 14 · 8:16 PM ET.
Report a problem
Notice as published
Dunwoody Road Gap Fill Sidewalk T6026-2
The City of Sandy Springs is seeking bids from qualified contractors for the Dunwoody Road Gap Fill Sidewalk Project (T6026-2). The project includes constructing approximately 340 linear feet of six-foot-wide sidewalk with a two-foot landscape strip near Dunwoody Road and Spalding Drive. Additional work includes grading, curb and gutter installation, pavement markings, signage, utility adjustments, erosion control, and traffic management.
The project aims to improve pedestrian safety and connectivity by closing the sidewalk gap between Sandy Springs and the City of Dunwoody.
Similar open RFPs
same contracting officeListing collected from Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace. Always confirm requirements in the original solicitation before you bid.