Sign inGet alerts

Construction Manager at Risk (CMAR) Construction of Equipment Concentration Site, Fort Carson, Colorado

DEPT OF DEFENSE, Kentucky · DEPT OF THE ARMY · W072 ENDIST LOUISVILLE
Verified 5 h agoUpdated Oct 13 · Amendment
Responses dueWed, Oct 283:00 PM ET · Kentucky time13 days left
PostedTue, Oct 131 amendment, last Oct 13
Solicitation no.W912QR279A001SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice; the solicitation governs

The U.S. Army Corps of Engineers seeks a Construction Manager at Risk for the Equipment Concentration Site at Fort Carson, Colorado. The project will be executed as an Other Transaction Agreement with the contractor providing input during design and construction phases.

Scope

  • Construction Manager at Risk for Equipment Concentration Site
  • Design phase input and construction execution at Fort Carson
Days to respond: 13

How to get the bid documents

  1. Open the notice on SAM.gov
  2. Download the 2 attachments listed below from the source
  3. Submit before 3:00 PM ET on Oct 28
Documents · 2 items, 2 files
  • PDF
    https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdfexternal link
  • DOC
    https://toolbox-piee.eb.mil/external link
Open the original listing on SAM.gov

Details

Place of performance
LOUISVILLE, Kentucky
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
W912QR279A001
Category
Construction · beta
NAICS
NAICS 236220 (Commercial and Institutional Building Construction)
Size standard
$45M revenue SBA table, NAICS 236220
PSC
PSC Y1AZ (CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS): 9 open RFPs
Delivery location
Fort Carson, Colorado from notice
Contract type
Other Transaction Agreement (OTA) from notice
Local presence
Not required
Amendments
1, last Oct 13
Contact
Jacob Pridemore
Office
DEPT OF THE ARMY · W072 ENDIST LOUISVILLE
Email
jacob.s.pridemore@usace.army.mil
Phone
5023156228

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Tue, Oct 13Posted
Not statedQuestions due
Wed, Oct 28 · 3:00 PM ETResponses due · 13 days left Under 14 days
Amendment 01
Tue, Oct 13 ·

Change log

verified Thu, Oct 15 · 12:31 AM ET
  1. Posted · SolicitationTue, Oct 13 · 12:30 PM ET
  2. Amendment · Amendment 01Tue, Oct 13 · 4:30 PM ET
Report a problem

Notice as published

Construction Manager at Risk (CMAR) Construction of Equipment Concentration Site, Fort Carson, Colorado

The U.S. Army Corps of Engineers, Louisville District is issuing this Request for Qualifications for the Construction of Equipment Concentration Site (ECS) at Fort Carson, Colorado. This project will be executed as a Construction Manager at Risk (CMAR) Other Transaction Agreement (OTA) under the statutory authority of 10 U.S.C.

2808a, Facility Construction or Repair. This approach will involve the general contractor during the design phase to provide feedback and input to the designer of record and the government on constructability, operability, cost, and value engineering on the design being developed.

Similar Dept of the Army awards · PSC Y1AZ

USAspending.gov, last 36 months

25 awards matched · tier 2: Dept of the Army + PSC Y1AZ; nothing from this office. Most recent:

  • Jul 7E.L. AMES, INC.E.L. AMES INC. MATOC MINIMUMW50S8H26FA018 · DELIVERY ORDER · Department of the Army · ends Jul 4, 2031$2K
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Sat, Oct 10, 2026 · 12:51 AM ET.

This contracting office

39 other open notices from this office · buys mostly Real Estate & Facilities, Construction, Other

Similar open RFPs

same PSC Y1AZ

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov