Sign inGet alerts
Request for proposalsConstruction · betaFederal buyerSB

AZ BL COLO 7528(1) Burro Creek Road

TRANSPORTATION, DEPARTMENT OF, Arizona · FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Verified 2 h agoAmended Oct 15
Responses dueTue, Nov 172:00 PM MST · Arizona time25 days left
PostedTue, Sep 151 amendment, last Oct 15
Solicitation no.6982AF27B000002SAM.gov
Set-asideSBOnly firms holding this status can compete
Estimated value$5.0Mfrom $2.0M · from notice

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Federal Highway Administration seeks sealed bids for roadway resurfacing, restoration, and rehabilitation of Burro Creek Road in Arizona, a 1.3-mile project with drainage and embankment work. Award will be made to the lowest responsive responsible bidder under a firm-fixed-price contract.

Scope

  • 1.3-mile roadway resurfacing with full-depth reclamation and asphalt concrete pavement
  • Drainage improvements, culvert installation, embankment stabilization, and safety items
Sealed bid — price onlySmall business set-asideBid opening Jan 31, 2027Insurance requiredQ&A closes Nov 10Submission: physicalDays to respond: 25

How to get the bid documents

  1. Download the 10 stored documents below; 4 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit as the notice directs before 2:00 PM MST on Nov 17
Documents · 13 items, 14 filesDownload all (zip) · Pro
  • PDF
    1d8671a5714f4ce8820f152d2fef3f3e.pdf5.7 MB · 902 pages
  • PDF
    4bd4865447084538a8761752e7755fc1.pdf267 KB · 3 pages
  • PDF
    508e848c83104959a4d12cb145bc7d47.pdf20.0 MB · 62 pages
  • PDF
    5134b10429d649c2a21dddc767a1c2e5.pdf2.0 MB · 123 pages
  • DOC
    downloadToo large, open at source
  • 1 earlier version
    • DOC
      downloadToo large, open at source
  • ZIP
    e2da95ceab794ac585c74c98aa7423f1.zip70 KB
  • PDF
    AZ BL COLO 7528(1) IFB.pdf2.0 MB · 123 pages
  • PDF
    AZ BL COLO 7528(1) Burro Creek Road_Plans.pdf143.6 MBToo large, open at source (143.6 MB)
  • PDF
    FP-24 Standard Specifications for Construction FHWA Federal Hwy Projects.pdf5.7 MB · 902 pages
  • PDF
    AZ BL COLO 7528(1) Burro Creek Road JOFOC_Redacted.pdf267 KB · 3 pages
  • PDF
    AZ BL COLO 7528(1) Burro Creek Road_FINAL HYD Report.pdf35.8 MBToo large, open at source (35.8 MB)
  • PDF
    AZ BL COLO 7528(1) Burro Creek Road_FINAL GEO Report and FINAL PVMNT Report.pdf20.0 MB · 62 pages
  • ZIP
    11.12.4 Design Physical Data and Reports.zip70 KB
Open the original listing on SAM.gov

Details

Place of performance
Kingman, Arizona
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
6982AF27B000002
Category
Construction · beta
NAICS
NAICS 237310 (Highway, Street, and Bridge Construction): 326 open RFPs
Size standard
$45M revenue SBA table, NAICS 237310
PSC
PSC Y1LB (CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS): 31 open RFPs
Delivery location
Burro Creek Road, Mohave County, Arizona from notice
Period of performance
January 2027 through October 2027, with optional work from notice
Evaluation
Sealed bid, price only (FAR 14) from notice
Estimated value
$5.0M from notice
Local presence
Not required
Amendments
1, last Oct 15
Contact
Eric Grosskreuz
Office
FEDERAL HIGHWAY ADMINISTRATION · 6982AF CENTRAL FEDERAL LANDS DIVISI
Email
cflcontracts@dot.gov

Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline.

Key dates

Tue, Sep 15Posted
Tue, Nov 10 · 2:00 PM MSTQuestions due · 18 days
Tue, Nov 17 · 2:00 PM MSTResponses due · 25 days left
Sun, Jan 31, 2027 · 12:00 PM MSTBid opening
Amendment 04
Thu, Oct 15 ·

Change log

verified Fri, Oct 23 · 9:30 PM MST
  1. Posted · SolicitationTue, Sep 15 · 6:59 AM MST
  2. Amendment · Amendment 04Thu, Oct 15 · 12:15 PM MST
Report a problem

Notice as published

AZ BL COLO 7528(1) Burro Creek Road

PROJECT DESCRIPTION: Burro Creek Road is located in Mohave County, 71 miles southwest of Kingman, Arizona. The project is located in rolling terrain, with elevations along this section ranging from approximately 1,885 to 2,255 feet. The project begins at the bridge over Burro Creek and ends at the cattle guard near the intersection with US Hwy

  1. The project's length is approximately 1.3 miles.

SCOPE OF THE WORK: The proposed of this resurfacing, restoration, and rehabilitation (3R) project is to improve access to the camping and day use areas at the Burro Creek Campground, reduce maintenance costs and erosion, improve sediment control, drainage and safety. The scope of work for this project includes the following major construction activities and items: Pavement Rehabilitation: 1.3 miles of roadway resurfacing incorporating Full Depth Reclamation (FDR) and Asphalt Concrete Pavement, along with applicable fog seals and tack coats.

Drainage Improvements: Installation of cross culverts and reconstruction of an existing headwall. Additional drainage work includes ditch grading and reconditioning, berms, bank stabilization, and the addition of flared end sections and riprap aprons throughout the project.

Earthwork & Stabilization: Embankment benching, slope stabilization, slope scaling, and specific bridge approach repairs at the eastern abutment to resolve undercutting concerns Safety & Traffic Control Items: Installation of new regulatory and warning signs, pavement markings and the placement of boulders to control public access at specific locations throughout the project. The project is structured with a base Schedule A encompassing the primary roadway rehabilitation, and an Option X which includes work associated with repairing bridge sedimentation, addressing undercutting at the bridge approaches, and boulder placement.

PRINCIPAL WORK ITEMS: Roadway Aggregate: 1,600 TONS Ditch Reconditioning: 2,000 LNFT Full Depth Reclamation: 1.3 MILE Asphalt Concrete Pavement: 3,600 TON 18-Inch Pipe Culvert: 100 LNFT 24-Inch Pipe Culvert: 175 LNFT Boulder: 100 EACH ANTICIPATED SCHEDULE: Advertisement October 2026 Award-January - 2027 Construction January 2027 through October 2027 ESTIMATED COST RANGE: Between $2,000,000 and $5,000,000

What this office paid before

USAspending.gov, last 36 months

25 awards matched · tier 1: this contracting office (6982AF) + PSC Y1LB. Most recent:

  • Sep 10, 2026HERBACK GENERAL ENGINEERING LLCCA CE SAC 570(1) NEW HOGAN PARKWAY IMPROVEMENTS REHABILITATION OF THE NEW HOGAN PARKWAY (0.8 MILES) AT THE NEW HOGAN LAKE DAY USE AREA6982AF26F00101N · DELIVERY ORDER · Federal Highway Administration · ends Jan 14, 2027$1.6M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Fri, Oct 23, 2026 · 10:01 PM MST.

This contracting office

8 other open notices from this office · buys mostly Construction, Architecture & Engineering

Related notices

Similar open RFPs

same PSC Y1LB

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov