Sign inGet alerts

Water, Street & Drainage Improvements - W Phillipsburg Phase 2

Responses dueTue, Nov 1711:00 AM ET · Georgia time32 days left
PostedFri, Oct 16No amendments since
Solicitation no.PE-77648-NONST-2027-000000031Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace
Set-asideNoneOpen to all firms

What the county is buying

by RFPFinder from the notice and attachments; the solicitation governs

Tift County Board of Commissioners seeks construction of water, street and drainage improvements for West Phillipsburg Phase 2, including roadway, storm drainage and water main replacement. Work must be completed within 180 days to substantial completion; award method and evaluation criteria are not stated.

Scope

  • 3,600 linear feet of 20-foot-wide urban roadway with curb, gutter and asphalt
  • 1,230 linear feet of 2-inch PVC water main replacement and storm drainage infrastructure
Days to respond: 32

How to get the bid documents

  1. Download the 1 document below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit as the notice directs before 11:00 AM ET on Nov 17
Documents · 1 item, 1 file
  • PDF
    Phillipsburg P2 _ Advertisement for Bids .pdf142 KB · 3 pages
Open the original listing on the agency portal

Details

Place of performance
Georgia
Buyer type
County
Notice type
Non-State Agency
Solicitation no.
PE-77648-NONST-2027-000000031
Category
Construction · beta
Delivery location
West Phillipsburg, Georgia from notice
Period of performance
180 consecutive calendar days to substantial completion; 194 consecutive calendar days to contract c from notice
Local presence
Not required
Amendments
None since Oct 16
Email
miriam.jordan@tiftcounty.org

Not stated in the notice: estimated value, contract type. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Oct 16Posted
Not statedQuestions due
Tue, Nov 17 · 11:00 AM ETResponses due · 32 days left

Change log

verified Fri, Oct 16 · 2:17 PM ET

No amendments since posting on Fri, Oct 16; verified Fri, Oct 16 · 2:17 PM ET.

Report a problem

Notice as published

Water, Street & Drainage Improvements - W Phillipsburg Phase 2

The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Water, Street & Drainage Improvements to serve the West Phillipsburg Community Phase 2 as shown on the construction drawings. In general, construction consists of +/- 3,600 linear feet of twenty-foot-wide urban roadway including curb and gutter, storm drainage pipe and boxes, base and asphalt, +/- 1,230 linear feet of 2-inch PVC water main replacement with the transfer of existing water services, fire hydrants, etc., and all associated measures for the complete project. Time allotted for completion of work is 180 consecutive calendar days to substantial completion.

Work shall be complete and ready for contract close-out with 194 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one

  1. Contract.

Similar open RFPs in Georgia

same contracting office

Listing collected from Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site