Sign inGet alerts
Request for proposalsConstructionFederal buyerSB

USCG Cutter Eagle New Dredging for Berthing at New London City Pier

Verified 18 h agoAmended Sep 11Local presence required
Responses dueThu, Oct 152:00 PM ET · Connecticut time6 days left
PostedMon, Jul 274 amendments, last Oct 9
Solicitation no.70Z0G126BSLISSW02SAM.gov
Set-asideSBOnly firms holding this status can compete
Estimated value$5.0Mfrom $1.0M · from notice

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The U.S. Coast Guard seeks a contractor to dredge approximately 3,663 cubic yards at New London City Pier in Connecticut to accommodate tugboat operations. This is a firm-fixed-price sealed bid procurement evaluated on price alone, with a 300-calendar-day performance period.

Scope

  • Dredge 3,663 cubic yards to -17 feet MLLW at New London City Pier, Connecticut.
  • Remove approximately 50 piles and dispose of dredge material at approved upland site.
Sealed bid — price onlySmall business set-asideLocal presence requiredBonding required 20% bidTDP access mandatory before bidSubmission: portalDays to respond: 6

How to get the bid documents

  1. Download the 22 documents below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit by portal before 2:00 PM ET on Oct 15
Documents · 21 items, 22 filesDownload all (zip) · Pro
  • PDF
    P23946211_SPEC_15JUL26.pdf20.2 MB · 222 pages
  • PDF
    P23946211_DWG.pdf6.2 MB · 8 pages
  • PDF
    SF24 - Bid Bond form.pdf703 KB · 4 pages
  • PDF
    WD_CT20260006 18May26.pdf64 KB · 5 pages
  • PDF
    IFB 70Z0G126BSLISSW02 - EAGLE NEW DREDGING.pdf1.0 MB · 76 pages
  • PDF
    3f551cf5cc3542969d91905ae8d5019e.pdf20.2 MB · 222 pages
  • PDF
    4e25c533573f43ad9e348f52a4a8f463.pdf703 KB · 4 pages
  • PDF
    4ea184d409e54c1bab293a8aba082691.pdf64 KB · 5 pages
  • PDF
    61e3232a8dfa4764ad04bc0eea5fa247.pdf55 KB · 1 page
  • PDF
    70b94cdcff6f44f0affc9f7143349f6c.pdf1.9 MB · 20 pages
  • PDF
    92d14edc658d410096a06b6c9c89dab6.pdf6.2 MB · 8 pages
  • PDF
    9c2149e7e241484eb54d92744845a2d7.pdf302 KB · 3 pages
  • PDF
    b13a915b688947b78551d49b40ddcb8c.pdf239 KB · 2 pages
  • PDF
    bccda322ff344cefbdd662bc3390092b.pdf22.0 MB · 123 pages
  • PDF
    bf6ec437db354cd48f5cd0ff6e009d03.pdf3.5 MB · 17 pages
  • PDF
    eb121fb6161046e0b7126004ec6caf6d.pdf1.0 MB · 76 pages
  • PDF
    License 202509798-WQC US Coast Guard Civil New London.pdf3.5 MB · 17 pages
  • PDF
    Green Earth preliminary acceptace letter 12_18_25.pdf55 KB · 1 page
  • PDF
    Disposal Facility Acceptance Letters_Cutter Eagle.pdf302 KB · 3 pages
  • PDF
    Chemical analysis report 2.pdf1.9 MB · 20 pages
  • 1 earlier version
    • PDF
      Chemical analysis report 1.pdf22.0 MB
  • PDF
    SF30 Amendment 00001.pdf239 KB · 2 pages
Open the original listing on SAM.gov

Details

Place of performance
New London, Connecticut
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
70Z0G126BSLISSW02
Category
Construction
NAICS
NAICS 23799
PSC
PSC Z1KF (MAINTENANCE OF DREDGING FACILITIES): 9 open RFPs
Quantity
3,663 cubic yards from attachment p.4
Delivery location
New London City Pier, New London, Connecticut 06320 from attachment p.5
Period of performance
300 calendar days from Notice to Proceed from notice
Contract type
Firm-fixed-price from notice
Evaluation
Sealed bid, price only (FAR 14) from notice
Estimated value
$5.0M from notice
Local presence
Required
Amendments
4, last Oct 9
Contact
Simon W. Leung, Contracting Officer
Office
US COAST GUARD · CEU PROVIDENCE(000G1)
Email
simon.w.leung@uscg.mil
Phone
5716102795

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Mon, Jul 27Posted
Not statedQuestions due
Thu, Oct 15 · 2:00 PM ETResponses due · 6 days left Under 14 days
Amendment 1
Wed, Oct 7 · The original procurement notice has been updated with additional details regarding the dredging requirements, environmental restrictions, and contract terms.
Amendment 2
Wed, Oct 7
Amendment 3
Fri, Oct 9 · description text changed
Amendment 4
Fri, Oct 9 · The original procurement notice has been updated with additional details regarding the dredging requirements, including the removal of piles and the environmental restrictions.

Change log

verified Fri, Oct 9 · 12:30 AM ET
  1. Posted · SolicitationMon, Jul 27 · 11:17 AM ET
  2. Amendment · The original procurement notice has been updated with additional details regarding the dredging requirements, environmental restrictions, and contract terms.Wed, Oct 7 · 12:32 AM ET
  3. Amendment · New version of the notice posted at the sourceWed, Oct 7 · 8:00 PM ET
  4. Amendment · description text changedFri, Oct 9 · 12:30 AM ET
  5. Amendment · The original procurement notice has been updated with additional details regarding the dredging requirements, including the removal of piles and the environmental restrictions.Fri, Oct 9 · 12:31 AM ET
Report a problem

Notice as published

USCG Cutter Eagle New Dredging for Berthing at New London City Pier

Eagle Pier New Dredging (FY26) at New London's City Pier, CT (NEW LONDON COUNTY), PSN #24014900. Contractor shall provide all personnel, equipment, materials, and all other items and services required to perform dredging of a new area immediately south of CGC EAGLE's berth at New London's City Pier. The intent is to deepen the area to allow tugboats to assist the cutter for mooring/unmooring at all tide levels.

Requirements of the design specify dredging to a depth of -17.0 at Mean Lower Low Water (MLLW) +2.0 over dredging allowance. This equates to approximately 3,700 cubic yards (CY) of dredge spoils to remove to an upland disposal site. Offshore disposal is not permitted due to environmental sample analysis of the dredge area.

There is an environmental time of year restriction in Connecticut that only permits dredging activities between October 1st and March 1st.

SPECIAL NOTES: The contractor shall conduct dredging operations so that navigation through the channel is possible at all times. The scope of work also includes removals of approximately 50 piles that remain below the waterline. Any piles that cannot be fully removed are to be cut at -21.0 MLLW.

Dredge quantity of 3,700 CY. This estimate is based on an average of the past annual dredging and surveys. The Contractor shall provide a cost for dredging per cubic yard.

That per cubic yard cost will be used for any necessary contract cost adjustment resulting from dredging more or less than the estimated 3,700 cubic yards, within the limits of dredge. Contractor will be compensated for actual quantity of dredge material removed and disposed, within the limits of dredge, as shown on the plan sheets. Dredge disposal site location is to be determined by conditions of treated/non-treated piles for Base bid item and Option Bid item.

The estimated value of the procurement is between $1,000,000 and $5,000,000. A 20% bid guarantee is required. Performance and Payment bonds will be required.

The performance period is estimated to be 300 calendar days from issuance of Notice to Proceed. This acquisition is issued pursuant to FAR Part 14 Sealed Bidding and is 100% Set-Aside for Small Business concerns. All relevant solicitation documents, including specifications and drawings may be accessed for download beginning on the date of issue of the IFB at the following site: https://www.sam.gov

Vendors MUST be registered in the System for Award Management database through https://www.sam.gov in order to receive a federal government contract. THE GOVERNMENT RESERVES THE RIGHT TO CANCEL THIS SOLICITATION EITHER BEFORE OR AFTER THE CLOSING DATE. NO REIMBURSEMENT WILL BE MADE FOR ANY COSTS ASSOCIATED WITH PROVIDING INFORMATION IN RESPONSE TO THIS PRESOLICITATION NOTICE OR ANY FOLLOW-UP INFORMATION REQUEST.

What this office paid before

USAspending.gov, last 36 months

5 awards matched · tier 1: this contracting office (70Z0G1) + PSC Z1KF. Most recent:

  • Jan 4, 2026GALVIN BROS., INC.DREDGE CHANNEL AT USCG STATION EATONS NECK (FY26) NORTHPORT, NY70Z0G126CSLIS0001 · DEFINITIVE CONTRACT · SMALL BUSINESS SET ASIDE - TOTAL · U.S. Coast Guard · ends May 4, 2026$588K
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Tue, Oct 6, 2026 · 7:00 AM ET.

This contracting office

1 other open notice from this office · buys mostly Construction

Related notices

Similar open RFPs

same PSC Z1KF

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov