Sign inGet alerts

Closed Mon, Oct 5. Responses were due Mon, Aug 31 · 2:00 PM CT. This notice is kept for reference and no longer takes responses.

Request for proposalsFederal buyer

Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel

DEPT OF DEFENSE, Alabama · DEPT OF THE ARMY · W074 ENDIST MOBILE
Unverified · check source
Responses dueMon, Aug 312:00 PM CT · Alabama timeClosed
PostedFri, Aug 14No amendments since
Solicitation no.W91278-26-B-A003SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

from the notice as published

The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type…

How to get the bid documents

Attachment list not pulled yet; check the source notice.

Open the original listing on SAM.gov

Details

Place of performance
MOBILE, Alabama
Buyer type
Federal
Notice type
Presolicitation
Solicitation no.
W91278-26-B-A003
NAICS
NAICS 237990 (Other Heavy and Civil Engineering Construction): 129 open RFPs
Size standard
$45M revenue SBA table, NAICS 237990
PSC
PSC Y1KF (CONSTRUCTION OF DREDGING FACILITIES): 83 open RFPs
Amendments
None since Aug 14
Contact
Jennifer Suit
Office
DEPT OF THE ARMY · W074 ENDIST MOBILE
Email
Jennifer.H.Suit@usace.army.mil
Phone
2514416466

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Aug 14Posted
Not statedQuestions due
Mon, Aug 31 · 2:00 PM CTResponses due · closed
Closed
Mon, Oct 5

Change log

verified Tue, Oct 6 · 11:30 PM CT
  1. Posted · PresolicitationFri, Aug 14 · 6:19 AM CT
  2. ClosedMon, Oct 5 · 5:35 AM CT

Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.

Report a problem

Notice as published

Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel

The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand.

Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.

What this office paid before

USAspending.gov, last 36 months

25 awards matched · tier 1: this contracting office (W91278) + PSC Y1KF. Most recent:

  • Jun 28, 2026INLAND DREDGING COMPANY, L.L.C.MAINTENANCE DREDGING OF TENNESSEE TOMBIGBEE WATERWAY (TTWW), MISSISSIPPIW9127826FA144 · DELIVERY ORDER · Department of the Army · ends Apr 29, 2027$5.5M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Fri, Oct 9, 2026 · 11:51 PM CT.

This contracting office

27 other open notices from this office · buys mostly Construction, Real Estate & Facilities, Other

Related notices

Similar open RFPs

same PSC Y1KF

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov