Get alerts
Closes in 37 hoursResponses due Fri, Oct 9 at 1:00 PM ET · about 37 hours left
Broad agency announcementFederal buyer

Tybee Island Shoreline Protection Project

DEPT OF DEFENSE, Georgia · DEPT OF THE ARMY · W074 ENDIST SAVANNAH
Verified 23 h agoUpdated Oct 7 · Updated
Responses dueFri, Oct 91:00 PM ET · Georgia timeabout 37 hours left
PostedFri, Oct 2No amendments since
Solicitation no.W912HN-27-B-A001SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice; the solicitation governs

The U.S. Army Corps of Engineers, Savannah District, is conducting market research to identify contractors with the interest, capability, equipment, and resources necessary to perform the Tybee Island Shoreline Protection Project.

Scope

  • Periodic placement (renourishment) of compatible beach-quality sand along the federally authorized shoreline.
  • Placement of dredged material along up to approximately 14,900 feet of the Front Beach and South Tip Beach at Tybee Island, Georgia.
BAA — white paper first (FAR 35.016)Open to allSubmission: emailDays to respond: 2

How to get the bid documents

  1. Open the notice on SAM.gov
  2. Read the notice; the source lists no attachments
  3. Submit by email before 1:00 PM ET on Oct 9

The source notice lists no attachments.

Open the original listing on SAM.gov

Details

Place of performance
Tybee Island, Georgia
Buyer type
Federal
Notice type
Sources Sought
Solicitation no.
W912HN-27-B-A001
NAICS
NAICS 237990 (Other Heavy and Civil Engineering Construction)
Size standard
$45M revenue SBA table, NAICS 237990
PSC
PSC Z1KF (MAINTENANCE OF DREDGING FACILITIES): 7 open RFPs
Quantity
up to 1,500,000 Cubic Yards (CY) from notice
Delivery location
Tybee Island, Chatham County, Georgia from notice
Period of performance
Per award from notice
BAA open until
Oct 9, 2026 from notice
Contract type
BAA (multiple awards) from notice
Evaluation
White-paper review, then invited proposals (FAR 35.016) from notice
Local presence
Not required
Amendments
None since Oct 2
Contact
Jeffrey Francisco
Office
DEPT OF THE ARMY · W074 ENDIST SAVANNAH
Email
Jeffrey.O.Francisco@usace.army.mil

Not stated in the notice: estimated value. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Oct 2Posted
Not statedQuestions due
Fri, Oct 9 · 1:00 PM ETResponses due · about 37 hours left Under 14 days

Change log

verified Wed, Oct 7 · 12:30 AM ET
  1. Posted · Sources SoughtFri, Oct 2 · 10:09 AM ET
  2. Updated · description text changedWed, Oct 7 · 12:30 AM ET
Report a problem

Notice as published

Tybee Island Shoreline Protection Project

Tybee Island Shoreline Protection Project Organization: U.S.

Army Corps of Engineers (USACE), Savannah District Location: Tybee Island, Chatham County, Georgia Type: Civil Works Construction PSC: Z1KF Maintenance of Dredging Facilities Estimated Magnitude: $10,000,000-$25,000,000 NAICS: 237990 Other Heavy and Civil Engineering Construction Small Business Size Standard: $37.0 million 1. Purpose This Sources Sought Synopsis is being issued for market research and acquisition planning purposes only.

It does not constitute a solicitation, Invitation for Bid (IFB), Request for Proposal (RFP), or commitment by the Government to issue a solicitation or award a contract. No reimbursement will be made for costs associated with responding to this notice. The U.S.

Army Corps of Engineers, Savannah District, is conducting market research to identify contractors with the interest, capability, equipment, and resources necessary to perform the Tybee Island Shoreline Protection Project. The results of this market research will be used to assist the Government in determining the appropriate acquisition strategy, including the availability and capability of small business concerns. 2.

NAICS Code and Small Business Size Standard The anticipated NAICS code for this acquisition is 237990 Other Heavy and Civil Engineering Construction, which includes dredging and surface cleanup activities. The applicable small business size standard is $37.0 million. For the dredging exception under NAICS 237990, a firm must perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern to qualify as small for purposes of Government procurement.

  1. Project Description The Tybee Island Shoreline Protection Project consists of the periodic placement (renourishment) of compatible beach-quality sand along the federally authorized shoreline to restore storm damage reduction benefits, reduce coastal erosion, and maintain the authorized project template on a seven-year cycle. The anticipated work consists of placement of dredged material along up to approximately 14,900 feet of the Front Beach and South Tip Beach at Tybee Island, Georgia.

The project is located south of the Savannah Harbor Entrance Channel. Beach-quality material will be obtained from an approved offshore borrow area located approximately 8,000 feet to 20,000 feet from the project area. The anticipated work includes offshore dredging, hydraulic transport and placement of beach-quality sand, beach grading, environmental compliance, beach tilling, and other incidental work necessary to complete the project.

Approximate total dredging/placement quantity: up to 1,500,000 Cubic Yards (CY) Estimated borrow-area water depths: -16 ft Mean Lower Low Water (MLLW) Expected borrow material characteristics: light gray to light brownish gray, well graded (poorly sorted), fine sized sand with a shell content of approximately 8% by volume. Due to environmental restrictions associated with sea turtle nesting season, beach placement is limited to the period between 1 November 2026 and 30 April 2027. The Government currently anticipates construction occurring between approximately late December 2026 and late March/early April 2027.

Based on the offshore borrow source and anticipated means and methods, the Government currently anticipates that performance will require a cutter suction dredge and associated plant capable of safely performing the offshore dredging and beach nourishment work. The Government is specifically seeking industry information regarding available dredging equipment, equipment capability, production capacity, mobilization requirements, and availability during the anticipated construction period. 4.

Information Requested Interested firms are requested to provide the following information. A. Interest and Availability Does your firm intend to compete for this project when a solicitation is issued?

Does your firm anticipate having the personnel, dredging plant, support equipment, and other resources necessary to perform the project within the anticipated 90-calendar-day construction period, with completion by late March/early April 2027? Identify any known commitments or other circumstances that could affect your firm's ability to make the necessary resources available during the anticipated construction period. B.

Tybee-Specific Equipment Capability Based on the project characteristics identified: Does the anticipated dredge for this project hold the load line certifications of meet requirements defined in 46 CFR subchapter E? Is the proposed dredge capable of safely dredging at the anticipated borrow-area depths of approximately -16 ft MLLW? Is the proposed equipment configuration capable of dredging and placing up to approximately 1,500,000 CY of the anticipated borrow material during the available construction period?

Describe the proposed general dredging and pumping configuration for transporting material from the offshore borrow area to the beach, considering pumping distances of approximately 8,000 to 20,000 feet. Identify any equipment-specific limitations not otherwise addressed above, such as dredge size, draft, pumping distance, pipeline configuration, anchoring, or other physical/operational limitations that could materially affect performance. C.

Relevant Experience Identify up to three projects completed within the past ten years demonstrating experience comparable to the anticipated Tybee work, preferably involving offshore borrow areas, cutter suction dredging, hydraulic beach nourishment, and similar pumping distances, quantities, and operating conditions. For each project, provide: Project name and location; Customer; Contract number, if applicable; Contract value; Completion date; Dredge utilized; Approximate quantity dredged; Approximate dredging depth; Approximate pumping distance; General operating environment, such as ocean, inlet, harbor, bay, or river; Material characteristics; and, Brief description of the respondent's role and work performed. D.

Small Business Dredging Requirement If the respondent represents itself as a small business under NAICS 237990: Confirm that the firm anticipates satisfying the requirement to perform at least 40 percent of the volume dredged with its own equipment or equipment owned by another small dredging concern. E.

Bonding Capacity Provide the firm's: Single-project bonding capacity; Aggregate bonding capacity; and, Ability to obtain performance and payment bonds for a project with an estimated construction magnitude of $10 million to $25 million. F. Industry Feedback Identify any technical, equipment, schedule, acquisition, or other conditions described in this Sources Sought that could materially affect your firm's ability to compete for or successfully perform the project.

Respondents are encouraged to identify any project characteristics or equipment requirements that the Government should consider when developing the solicitation for the FY27 Tybee Island Shoreline Protection Project. G. Point of Contact Inquires and responses will only be accepted via email to Contract Specialist, MSG Francisco, Jeffrey at [email on the source notice], and Contracting Officer, Mr.

Preston Jones at [email on the source notice]. The request for Information Sheet should be completed and submitted no later than October 9, 2026, at 1:00 pm, Eastern Daylight Time. All information is to be provided on a voluntary basis at no charge to the Government.

There is no entitlement to payment of direct or indirect costs related to or arising out of responding to this request for information. All information provided becomes property of the Government. There is no guarantee, expressed or implied, that the market research for this acquisition will result in any guarantee of award or acquisition strategy.

Similar Dept of the Army awards · PSC Z1KF

USAspending.gov, last 36 months

25 awards matched · tier 2: Dept of the Army + PSC Z1KF; nothing from this office. Most recent:

  • Jun 28PRECISION CONSTRUCTION LLCGALVESTON HARBOR AND CHANNEL- SAN JACINTO PA IMPROVEMENTS, GALVESTON COUNTY, TEXAS.W912HY26CA022 · DEFINITIVE CONTRACT · Department of the Army · ends Jul 29, 2027$8.0M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Tue, Oct 6, 2026 · 5:26 AM ET.

This contracting office

4 other open notices from this office · buys mostly Other, Real Estate & Facilities

Similar open RFPs

same PSC Z1KF

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov