Sign inGet alerts

Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

DEPT OF DEFENSE, New Jersey · DEPT OF THE ARMY · W2SD ENDIST NEW YORK
Verified 22 h agoAmended Sep 17Local presence required
Responses dueMon, Oct 192:00 PM ET · New Jersey time10 days left
PostedThu, Mar 265 amendments, last Oct 9
Solicitation no.W912DS-26-R-A032SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Department of Defense is seeking a contractor for the two-phase design and construction of the Port Monmouth Phase II, Contract 1 Mitigation Project. This is a two-phase best value tradeoff solicitation.

Scope

  • Design and construct shore protection and flood risk management components.
  • Wetland mitigation work including clearing, invasive species control, excavation, and planting.
Local presence requiredInsurance requiredDays to respond: 10
CompetitionLikely competitive

1 signal behind this label (incumbent, repeat winner, short window, brand-name or sole-source language, prior sources sought). Pro shows them with sources.

From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.

How to get the bid documents

  1. Download the 15 stored documents below; 3 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit as the notice directs before 2:00 PM ET on Oct 19
Documents · 16 items, 18 filesDownload all (zip) · Pro
Start here
  • Solicitation · RTA 30 Package - Design Build RFP.pdfView
  • Latest amendment · Phase Two of a Two Phase Design-Build Selection Procedure-Amendment 0001.pdfView
  • PDF
    Solicitation Amendment W912DS26RA0320001 SF 30.pdf645 KB · 5 pages
  • PDF
    Phase One of a Two Phase Design-Build Selection Procedure_Amendment 0001.pdf968 KB · 22 pages
  • PDF
    Phase Two of a Two Phase Design-Build Selection Procedure-Amendment 0001.pdf203 KB · 20 pages
  • PDF
    Solicitation - W912DS26RA032.pdf6.3 MB · 71 pages
  • PDF
    RTA 30 Package - Design Build RFP.pdf1.3 MB · 63 pages
  • PDF
    RTA 30 Package - Design Drawings.pdf10.6 MB · 25 pages
  • PDF
    RTA 30 Package - Technical Specifications.pdf3.8 MB · 377 pages
  • PDF
    RTA 30 Package - Design Documentation Report.pdf11.4 MB · 147 pages
  • PDF
    RTA_30_As-Built_Contract_2_Part-2.pdf20.3 MB · 131 pages
  • 1 earlier version
    • PDF
      RTA_30_As-Built_Contract_2_Part-1.pdf21.2 MB · 72 pages
  • PDF
    RTA_30_As-Built_Contract_3.pdf23.8 MB · 68 pages
  • PDF
    RTA_30_As-Built_Contract_4A.pdf14.2 MB · 46 pages
  • PDF
    RTA_30_As-built_Contract_5_Part 2.pdf36.4 MBToo large, open at source (36.4 MB)
  • 1 earlier version
    • PDF
      RTA_30_As-built_Contract_5_Part 1.pdf36.7 MBToo large, open at source (36.7 MB)
  • PDF
    RTA_30_Permits_Review Comments.pdf3.2 MB · 127 pages
  • PDF
    Phase One of a Two Phase Design-Build Selection Procedure.pdf511 KB · 22 pages
  • PDF
    Phase Two of a Two Phase Design-Build Selection Procedure.pdf354 KB · 20 pages
  • PDF
    RTA 30 Package - Permits and Review Comments.pdf3.7 MBat source
Open the original listing on SAM.gov

Details

Place of performance
Port Monmouth, New Jersey
Buyer type
Federal
Notice type
Solicitation
Solicitation no.
W912DS-26-R-A032
Categories
Architecture & Engineering · beta, Construction
NAICS
NAICS 237990 (Other Heavy and Civil Engineering Construction)
Size standard
$45M revenue SBA table, NAICS 237990
PSC
PSC Y1PZ (CONSTRUCTION OF OTHER NON-BUILDING FACILITIES): 16 open RFPs
Delivery location
Middletown Township, Monmouth County, New Jersey from attachment p.4
Contract type
Firm-fixed-price from attachment p.10
Local presence
Required
Amendments
5, last Oct 9
Contact
Adrian Stafford-Browne
Office
DEPT OF THE ARMY · W2SD ENDIST NEW YORK
Email
adrian.j.stafford-browne@usace.army.mil

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Thu, Mar 26Posted
Not statedQuestions due
Mon, Oct 19 · 2:00 PM ETResponses due · 10 days left Under 14 days
Amendment 1
Fri, Sep 18
Amendment 2
Fri, Sep 18
Amendment 3
Fri, Oct 2
Amendment 4
Thu, Oct 8 · description text changed
Amendment 5
Fri, Oct 9 · description text changed

Change log

verified Fri, Oct 9 · 12:30 AM ET
  1. Posted · SolicitationThu, Mar 26 · 10:07 AM ET
  2. Amendment · New version of the notice posted at the sourceFri, Sep 18 · 6:02 AM ET
  3. Amendment · New version of the notice posted at the sourceFri, Sep 18 · 7:04 AM ET
  4. Amendment · New version of the notice posted at the sourceFri, Oct 2 · 10:24 AM ET
  5. Q&A posted · A question and answer (QA) session has been posted for the Port Monmouth project.Wed, Oct 7 · 12:31 AM ET
  6. Amendment · description text changedThu, Oct 8 · 12:31 AM ET
  7. Updated · description text changedThu, Oct 8 · 12:31 AM ET
  8. Amendment · description text changedFri, Oct 9 · 12:31 AM ET
  9. Updated · description text changedFri, Oct 9 · 12:31 AM ET
Report a problem

Notice as published

Two Phase Design and Construction of the Port Monmouth Phase II, Contract 1 Mitigation Project

As of 17 September 2026: Phase I of a Two Phase BVTO posted. The Port Monmouth project consists of shore protection components (Phase

  1. as well as flood risk management components (Phase II).

The project provides for reduction of storm damages to low-lying residential and commercial structures from coastal erosion, tidal flooding, and inland flooding along Pews and Compton Creeks caused by high surface events in Raritan Bay. Phase II flood risk management components consist of a tide gate, levees, floodwalls, two pump stations, three road closure structures, road raising and regarding, and wetland mitigation. The State of New Jersey, acting through the New Jersey Department of Environmental Protection (NJDEP), is the non-Federal sponsor for the project.

Similar Dept of the Army awards · PSC Y1PZ

USAspending.gov, last 36 months

25 awards matched · tier 2: Dept of the Army + PSC Y1PZ; nothing from this office. Most recent:

  • Jul 8B & K CONSTRUCTION CO L.L.CWEST SHORE LAKE PONTCHARTRAIN, LOUISIANA, HURRICANE AND STORM DAMAGE RISK REDUCTION PROJECT, WSLP-103A LEVEE, FLOODWALL AND GATE, STA. 819+8W912P826CA031 · DEFINITIVE CONTRACT · Department of the Army · ends Oct 31, 2027$12M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Fri, Oct 9, 2026 · 8:58 AM ET.

This contracting office

2 other open notices from this office · buys mostly Construction, Architecture & Engineering

Similar open RFPs

same PSC Y1PZ

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov