What the agency is buying
by RFPFinder from the notice; the solicitation governsThe U.S. Department of State seeks sources for refurbishment of a 335 m² facility in Tegucigalpa, Honduras, including demolition, space redistribution, and MEP system installation.
Scope
- Refurbish 335 m² facility: demolition, space redistribution, MEP systems
- Construction in Honduras per technical specifications and local building regulations
How to get the bid documents
- Open the notice on SAM.gov
- Read the notice; the source lists no attachments
- Submit before 12:00 PM ET on Nov 2
The source notice lists no attachments.
Open the original listing on SAM.govDetails
- Place of performance
- Tegucigalpa, District of Columbia
- Buyer type
- Federal
- Notice type
- Sources Sought
- Solicitation no.
- 19AQMM-26-N-0212
- Category
- Construction · beta
- Size standard
- $45M revenue SBA table, NAICS 236220
- Period of performance
- 120 calendar days from Notice to Proceed from notice
- Evaluation
- n/a, market research from notice
- Local presence
- Required
- Amendments
- None since Oct 21
- Contact
- Joonpil Hwang
- Office
- ACQUISITIONS - AQM MOMENTUM
- hwangj2@state.gov
Not stated in the notice: estimated value. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Thu, Oct 22 · 12:30 AM ETNo amendments since posting on Wed, Oct 21; verified Thu, Oct 22 · 12:30 AM ET.
Report a problem
Notice as published
TAMLOC Refurbishment, Tegucigalpa, Honduras
This is a sources sought notice for information only. This sources sought is for the purpose of conducting market research to provide data for planning purposes. This sources sought synopsis announcement does not constitute a formal solicitation, and is not a request for proposal, request for quote, invitation for bid, does not obligate the government to award a contract, issue a solicitation, reimburse respondents for any proposal preparation and/or submittal costs, nor does its issuance in any way restrict the Government as to its ultimate acquisition approach.
The Government will not pay for any materials provided in response to this notice and submittals will not be returned to the sender. The U.S. Department of State (DoS) is the lead institution for the conduct of American diplomacy with its mission to advance U.S. national security interests, fight terrorism, protect U.S. interests abroad, and implement foreign policy initiatives that build a freer, more prosperous, and secure world.
The Bureau of International Narcotics and Law Enforcement Affairs (INL), works to keep Americans safe at home by countering international crime, illegal drugs, and instability abroad. In Honduras, INL assists the host government by strengthening police, prosecutors, and judges. These efforts reduce the amount of crime and illegal drugs reaching U.S. shores keeping American communities safe while enhancing Honduras' capacity to deliver security and justice services to its citizens.
INL's work in Honduras supports the country's efforts to combat transnational criminal organizations and disrupt U.S.-bound illicit drugs. The Contractor shall refurbish an approximate area of 335 m, including the demolition of existing elements, redistribution of spaces, construction of new divisions, installation of electrical systems and necessary adaptations to guarantee optimal operating conditions. Remodeling should follow all technical specifications stated on approved designs.
All mechanical, electrical, and plumbing (MEP) systems shall be installed within the walls, floors, shafts, and/or above finished ceilings. Exposed surface mounted plumbing and electrical components will only be approved on a case-by-case basis. Walls shall be plastered per commercial industry standards and cured before applying surface coatings.
Contractor shall not deviate from the design approved by INL and the Client without their prior approval. The contractor must execute all works in accordance with good civil engineering practices, technical standards applicable in Honduras (including criteria used by FHIS and local building regulations), as well as international quality standards in interior works. All materials must be new, of the highest quality and suitable for the intended use.
The use of defective materials, reused without authorization or that do not comply with technical specifications will not be allowed. The contractor will be responsible for verifying on-site dimensions, existing conditions, and compatibility between systems before executing any activity. The project shall be constructed according to the plans, specifications and the list of requirements provided below.
This is not a solicitation, nor will a solicitation package be issued as a result of this announcement, and no award shall be made as a result of this announcement. In the event that a solicitation is developed, it will be assigned a formal Request for Proposal (RFP) number or Request for Quotation (RFQ) and the announcement will be published on SAM.gov. RESPONSES DUE For the purposes of this acquisition the applicable NAICS code is 236220.
Responses are requested no later than 02 November 2026 at 12:00 PM EDT. Direct expression of interest as well as required documentation should be submitted in writing, via email, to Joonpil Hwang at [email on the source notice] and David M. Scott at [email on the source notice].
All prospective offerors are responsible for monitoring this site for the release of all other information pertaining to the synopsis and solicitation. RESPONSE SUBMISSION INFORMATION All potential sources with the capability to provide the requirements referenced in this sources sought are invited to submit, in writing, sufficient information within the page limitations listed below. This information should demonstrate the respondent's ability to fulfill the technical, delivery, and support requirements and be responsive to the technical questions in this RFI as indicated below.
We will not answer technical questions or provide additional technical information at this time via this sources sought notice. Please understand that the rough order of magnitude is for the purposes of market research and your firm will in no way be committed to any estimate you provide under this notice. Responses to this RFI shall include the following:
- A cover sheet which includes: Company Name Address Point of Contact E-mail Address Phone Number UEI Number Primary Business and Market Areas Business Size and Socioeconomic Status (if applicable) 2.
Relevant Construction Project Experience (four
- page limit): The potential offerors need to demonstrate that they possess, within the last five years, construction experience similar to that described in this specified source sought category in Honduras.
Offerors must verify experience commensurate with renovation/refurbishment of buildings/facilities. Experience described above needs to include the offeror's role, primary contractor or sub-contractor. Each project experience needs to include the contract number, the US Agency or private company that awarded the contract and contract monetary value.
Potential offerors shall be licensed and certified to perform architectural, engineering, and construction services in Honduras. Copies of the licenses and certifications must be submitted in response to the sources sought and are excluded from the two
- page limit.
Submit copies of such licenses. The potential offerors need to document experience in coordinating with host nation government(s) to mitigate and solve potential issues; Experience in importation of materials, equipment, manpower, and any other necessary resources required for the completion of design-build projects; 3.
Capabilities of Successfully Completing Construction (six
- page limit): Ability to provide all required design and engineering services, manpower, and materials to construct new buildings or to renovate existing ones; Ability to provide and deliver required materials and equipment to projects located in Honduras; Capabilities to import all required material and equipment through either sea or air transportation to Honduras; Ability that, should a solicitation be issued in the future for this requirement, offerors should declare if the offeror is applying as a primary contractor, a joint venture or partnership or other as applicable to their submission.
Ability that, should sub-contractors figure into an offeror's plans, the offeror will be expected to specify what percentage of work will be tasked to assigned sub-contractors. Period of Performance The proposed period of performance of this requirement is 120 calendar days from issuance of Notice to Proceed.
What this office paid before
USAspending.gov, last 36 months25 awards matched · tier 1: this contracting office (19AQMM) + PSC Y1AA. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Tue, Oct 13, 2026 · 11:33 PM ET.
This contracting office
41 other open notices from this office · buys mostly Construction, Security, Training
Related notices
Similar open RFPs
same PSC Y1AAListing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.