What the state is buying
by RFPFinder from the notice and attachments; the solicitation governsArizona Department of Transportation seeks bids for rockfall mitigation construction on SR 95 south of Parker, including excavation, rock netting, scaling, concrete barriers, spillways, and erosion control. This is an invitation for bids with award to the lowest responsive responsible bidder; prequalification is required.
Scope
- Rockfall mitigation measures in four locations on SR 95 between MP 158.8 and 161.5
- Excavation, rock netting, scaling, concrete barrier, concrete spillways, erosion control
How to get the bid documents
- Download the 5 documents below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit through Arizona State Procurement Office - Arizona Procurement Portal (APP, Ivalua) (free account) before 11:00 AM MST on Oct 16
To submit, you need a free account at Arizona State Procurement Office - Arizona Procurement Portal (APP, Ivalua).
Details
- Place of performance
- Arizona
- Buyer type
- State
- Notice type
- IFB
- Solicitation no.
- F070601C
- Category
- Construction
- Delivery location
- SR 95 between MP 158.8 and 161.5, south of Parker, La Paz County, Arizona from notice
- Period of performance
- 100 working days from attachment p.2
- Evaluation
- Sealed bid, price only from notice
- Estimated value
- $3.0M from attachment p.2
- Local presence
- Not required
- Amendments
- None
- Contact
- Rene Teran
- Office
- NorthWest District
Not stated in the notice: contract type. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Fri, Oct 9 · 7:46 PM MSTNo amendments since posting; verified Fri, Oct 9 · 7:46 PM MST.
Report a problem
Notice as published
System Enhancement (Safety Improvements): QUARTZSITE - PARKER - TOPOCK HIGHWAY (SR 95)_ (South of Parker)
The proposed project is located on SR 95 between MP 158.8 and 161.5 south of Parker in La Paz County. The work consists of constructing rockfall mitigation measures in four locations. The work includes excavation, rock netting, scaling, concrete barrier, concrete spillways, erosion control, and other related work.
Project: 095 LA 158 F070601C 095-C-(229)T QUARTZSITE - PARKER - TOPOCK HIGHWAY (SR 95)_ (South of Parker). Item # 103844.
Pre-qualification required: YES.
Bid opening: 10/16/2026 11:00:00 AM (Arizona time). Plan holders must register with ADOT Contracts and Specifications to receive addenda.
This contracting office
3 other open notices from this office · buys mostly Construction
Similar open RFPs in Arizona
same contracting officeListing collected from Arizona State Procurement Office - Arizona Procurement Portal (APP, Ivalua). Always confirm requirements in the original solicitation before you bid.