Sign inGet alerts
Request for Letters of InterestConsulting · betaCity buyer

SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest

City of Rogers, Arkansas · Community Development
Responses dueTue, Nov 34:00 PM CT · Arkansas time20 days left
PostedSun, Oct 11No amendments since
Solicitation no.2026-LOI-004Arkansas Office of State Procurement - ARBuy
Set-asideNoneOpen to all firms

What the city is buying

by RFPFinder from the notice; the solicitation governs

The City of Rogers requests letters of interest for consulting services for the US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies. Offers will be evaluated on four equally weighted criteria.

Scope

  • US-71B Corridor Study: 6.7-mile corridor from W. Walnut Street to S. 8th Street
  • Railyard Loop Trail Undercrossing Feasibility Studies: grade-separated trail undercrossings at US-71B/W. Price Lane and US-71B/S. 28th Street
Q&A closes Oct 29Submission: physicalDays to respond: 20

How to get the bid documents

  1. Open the notice on Arkansas Office of State Procurement - ARBuy
  2. Read the notice; the source lists no attachments
  3. Submit by physical before 4:00 PM CT on Nov 3

To submit, you need a free account at Arkansas Office of State Procurement - ARBuy.

The source notice lists no attachments.

Open the original listing on the agency portal

Details

Place of performance
Arkansas
Buyer type
City
Notice type
Request for Letters of Interest
Solicitation no.
2026-LOI-004
Category
Consulting · beta
Delivery location
301 W. Chestnut St., Rogers, AR 72756 from notice
Contract type
Request for Letters of Interest from notice
Local presence
Not required
Amendments
None since Oct 11
Contact
Colt Craig · Purchasing Manager
Office
Community Development
Email
ccraig@rogersar.gov
Phone
(479) 512-1640

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline.

Key dates

Sun, Oct 11Posted
Thu, Oct 29 · 5:00 PM CTQuestions due · 15 days
Tue, Nov 3 · 4:00 PM CTResponses due · 20 days left

Change log

verified Wed, Oct 14 · 1:15 PM CT

No amendments since posting on Sun, Oct 11; verified Wed, Oct 14 · 1:15 PM CT.

Report a problem

Notice as published

SS4A US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies Request for Letters of Interest

Released: October 11, 2026 12:00 AM CDT Questions due (Question Submission Deadline): October 29, 2026 5:00 PM CDT Responses due (Response Submission Deadline): November 3, 2026 4:00 PM CST

The City of Rogers, Arkansas requests letters of interest from qualified consulting firms for professional planning, engineering, and related services for the US-71B Corridor Study and Railyard Loop Trail Undercrossing Feasibility Studies. Selection will follow 23 CFR Part 172, Procurement, Management, and Administration of Engineering and Design Related Services.

This project is funded through the U.S. Department of Transportation (USDOT) Safe Streets and Roads for All (SS4A) grant program, administered by the Federal Highway Administration (FHWA), Assistance Listing No. 20.939, Federal Award No.

693JJ32640757 . This procurement is subject to 2 CFR Part 200, 23 CFR Part 172, and the City’s SS4A Grant Agreement. All work is subject to FHWA review and approval.

US-71B Corridor Study. The study covers the 6.7-mile US-71B corridor from W. Walnut Street to S.

8th Street. It will assess safety, mobility, and access management and develop concept designs to reduce fatal and serious injury crashes, consistent with the City’s Unified Development Code and Future Land Use Placetypes. The ARDOT improvement segment (Dixieland Road to S.

8th Street) is excluded, but its design will be incorporated for corridor-wide consistency. The study must account for the pending ARDOT-to-City ownership transfer of the W. Walnut Street segment and be coordinated with the Northwest Arkansas Regional Planning Commission’s regional US-71B corridor study supporting future Bus Rapid Transit (BRT), including station and stop locations and corridor geometry.

Railyard Loop Trail Undercrossing Feasibility Studies. Feasibility studies will evaluate grade-separated trail undercrossings at US-71B/W. Price Lane and US-71B/S.

28th Street, including conceptual engineering design, site constraints (utilities, drainage, right-of-way, and roadway geometry), safety analysis, and planning-level cost estimates. Findings will be integrated into the corridor study final report.

Submit the following to Colt Craig, Purchasing Manager, City of Rogers Finance Department, 301 W. Chestnut St., Rogers, AR 72756, no later than 4:00 p.m. Central Time on November 3, 2026 :

A cover letter with primary contact information and a brief statement of staffing capacity and scheduling approach relative to the period of performance.

Architect-Engineer Qualifications Standard Form (SF) 330, Parts I and II (48 CFR §53.236-2(b)): https://www.gsa.gov/reference/forms/architectengineer-qualifications

The firm’s current equal employment opportunity policy (Ark. Code Ann. §19-11-104).

DFA Illegal Immigrant Contractor Disclosure Form dated within the past 12 months (Ark. Code Ann. §19-11-105): https://www.ark.org/dfa/immigrant/index.php/user/welcome

Anticipated DBE subconsultant participation, if any.

Submittals will be scored on four equally weighted criteria (10 points each; 40 points total):

  1. professional staff, including education, experience, number of personnel available, licensure and registration, and subconsultant partnerships;
  2. general and professional reputation, including responsiveness to civil rights and equal employment opportunity requirements;
  3. experience on similar projects, including multimodal corridor safety studies, High Injury Network analysis, active transportation and trail planning, grade-separated crossing feasibility analysis, and concept design coordinated with regional frameworks including Bus Rapid Transit; and
  4. past performance, including references from similar projects (evaluations from other clients will be considered for firms that have not worked for the City).

The selection committee will shortlist firms, which will be furnished a scope of work and asked to submit detailed proposals.

Listing collected from Arkansas Office of State Procurement - ARBuy. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site