Sign inGet alerts

Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ????????? Select Sites

DEPT OF DEFENSE, Georgia · DEPT OF THE ARMY · W074 ENDIST SAVANNAH
Responses dueFri, Nov 2011:00 AM ET · Georgia time28 days left
PostedSun, Oct 18No amendments since
Solicitation no.W912HN-27-S-5000SAM.gov
Set-asideNoneOpen to all firms
Estimated value$10Mfrom $5.0M · from notice

What the agency is buying

by RFPFinder from the notice; the solicitation governs

The Savannah District Corps of Engineers seeks information on contractor capabilities for maintenance dredging on the Atlantic Intracoastal Waterway in Georgia and South Carolina, estimated at $5–10 million over five months. This is a sources-sought notice for market research only; no solicitation or contract award is obligated.

Scope

  • Maintenance dredging of Hell Gate, Florida Passage, and Fields Cut sections
  • Approximately 265,000 cubic yards total material removal and placement
Not a solicitation — no awardSubmission: portalDays to respond: 28

How to get the bid documents

  1. Open the notice on SAM.gov
  2. Download the 2 attachments listed below from the source
  3. Submit before 11:00 AM ET on Nov 20
Documents · 2 items, 2 files
  • PDF
    https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdfexternal link
  • DOC
    https://toolbox-piee.eb.mil/external link
Open the original listing on SAM.gov

Details

Place of performance
SAVANNAH, Georgia
Buyer type
Federal
Notice type
Sources Sought
Solicitation no.
W912HN-27-S-5000
Category
Construction · beta
NAICS
NAICS 237990 (Other Heavy and Civil Engineering Construction): 127 open RFPs
Size standard
$45M revenue SBA table, NAICS 237990
PSC
PSC Z1KF (MAINTENANCE OF DREDGING FACILITIES): 10 open RFPs
Quantity
265,000 cubic yards total from notice
Delivery location
Hell Gate (Chatham County, Georgia), Florida Passage (Chatham County, Georgia), and Fields Cut (Jasper County, South Car from notice
Period of performance
Five months (165 days) from Notice to Proceed from notice
Evaluation
n/a, market research from notice
Estimated value
$10M from notice
Local presence
Not required
Amendments
None since Oct 18
Contact
Rohan Bryan
Office
DEPT OF THE ARMY · W074 ENDIST SAVANNAH
Email
rohan.a.bryan@usace.army.mil
Phone
(912) 652-5030

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Sun, Oct 18Posted
Not statedQuestions due
Fri, Nov 20 · 11:00 AM ETResponses due · 28 days left

Change log

verified Fri, Oct 23 · 12:30 AM ET

No amendments since posting on Sun, Oct 18; verified Fri, Oct 23 · 12:30 AM ET.

Report a problem

Notice as published

Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ????????? Select Sites

THIS IS A SOURCES SOUGHT ONLY. The Savannah District Corps of Engineers is requesting information regarding the market capabilities of potential contractors that can perform maintenance and unclassified dredging on the Atlantic Intracoastal Waterway (AIWW) sections of waterway Hell Gate and Florida Passage in Chatham County Georgia and Fields Cut in Jasper County South Carolina. This request does not obligate the Government in any way to post a Request for Proposal or award a contract.

Information received will be considered for the purpose of market research and determining how to best move forward with the procurement. Applicable NAICS code is 237990 with a size standard of $45.0M. The potential magnitude for this requirement is estimated to be between $5,000,000 and $10,000,000.

The FY26 Atlantic Intracoastal Waterway (AIWW) maintenance dredging contract provides construction services, including furnishing personnel, transportation, mobilization and demobilization, equipment and materials required in connection with maintenance dredging and incidental related work. This contract is traditionally performed with a hydraulic cutterhead dredge, but other methods will be considered. The duration is expected to be five months (165 days) from Notice to Proceed.

The Savannah Districts area of responsibility (AOR) of the federally maintained channel in the Atlantic Intracoastal Waterway begins in Port Royal Sound, South Carolina and ends in Cumberland Sound, Georgia. The shallow draft federally maintained channel is twelve

  1. feet deep MLLW with widths from ninety
  2. feet in land cuts and one hundred fifty (150) feet in natural waterways.

Savannah Districts FY26 AIWW maintenance dredging work is located within the state of Georgia (Chatham County) and in the state of South Carolina (Jasper County). The Hell Gate section of waterway is to be dredged to authorized width of 150 feet and depth of 12 feet. The work also includes options to dredge the Florida Passage and the Fields Cut sections of the waterway to authorized width of 150 feet and depth of 12 feet.

Approximately two hundred thousand (200,000) cubic yards of maintenance material is anticipated to be removed from the Hell Gate section of the federally maintained channel in the waterway. Approximately fifteen thousand (15,000) cubic yards of maintenance material is anticipated to be removed from the Florida Passage section of the federally maintained channel in the waterway. Approximately fifty thousand (50,000) cubic yards of maintenance material is anticipated to be removed from the Fields Cut section of the federally maintained channel in the waterway.

Sediment dredged from Hell Gate may be pumped approximately four

  1. miles to a Beneficial Use placement site in tidal flats east of Ogeechee Bar.

Sediment dredged from Florida Passage may be pumped approximately nine

  1. miles to the Beneficial Use placement site in the tidal flats east of Ogeechee Bar.

Sediment dredged from Fields Cut will be pumped to the adjacent confined upland containment area DMCA 14B. The attached Request for Information should be filled out and loaded via PIEE before the sources sought close on 20 November 2026, 11:00 a.m. (EST).

Any questions should be emailed to the Contract Specialist, Rohan Bryan at [email on the source notice] or Contracting Officer, Preston Jones at [email on the source notice].

What this office paid before

USAspending.gov, last 36 months

8 awards matched · tier 1: this contracting office (W912HN) + PSC Z1KF. Most recent:

  • Jul 14, 2026MARINEX CONSTRUCTION INCTHE SCOPE OF WORK INCLUDES THE EXPANSION OF THE CEDAR HAMMOCK RANGE BEND WIDENER LOCATED BETWEEN STATIONS 20+300 AND 23+300. APPROXIMATELY 3W912HN26CA025 · DEFINITIVE CONTRACT · Department of the Army · ends Nov 9, 2027$19M
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards updated Sat, Oct 17, 2026 · 12:53 AM ET.

This contracting office

5 other open notices from this office · buys mostly Construction, Other, Consulting

Similar open RFPs

same PSC Z1KF

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov