Sign inGet alerts
Invitation for bidsConstructionCity buyer

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

City of Tucson, Arizona · Transportation & Mobility
Responses dueTue, Oct 202:00 PM MST · Arizona time11 days left
PostedWed, Aug 19No amendments since
Solicitation no.270146Arizona State Procurement Office - Arizona Procurement Portal (APP, Ivalua)
Set-asideNoneOpen to all firms

What the city is buying

by RFPFinder from the notice; the solicitation governs

The City of Tucson is purchasing roadway improvements for Silverbell Road, El Camino Del Cerro, and Sweetwater Drive. This is an Invitation for Bid (IFB) and offers will likely be evaluated on price.

Scope

  • Roadway improvements including four lanes, medians, curbs, sidewalks, multi-use path, traffic signals, street lighting.
  • Landscaping, irrigation, utility work, and drainage facilities.
Sealed bid — price onlyDays to respond: 11

How to get the bid documents

  1. Open the notice on Arizona State Procurement Office - Arizona Procurement Portal (APP, Ivalua)
  2. Read the notice; the source lists no attachments
  3. Submit before 2:00 PM MST on Oct 20

To submit, you need a free account at Arizona State Procurement Office - Arizona Procurement Portal (APP, Ivalua).

The source notice lists no attachments.

Open the original listing on the agency portal

Details

Place of performance
Arizona
Buyer type
City
Notice type
IFB
Solicitation no.
270146
Category
Construction
Evaluation
Sealed bid, price only from notice
Local presence
Not required
Amendments
None since Aug 19
Contact
Leticia Riesgo · Senior Contract Officer
Office
Transportation & Mobility
Email
leticia.riesgo@tucsonaz.gov
Phone
(520) 837-4138

Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Wed, Aug 19Posted
Not statedQuestions due
Tue, Oct 20 · 2:00 PM MSTResponses due · 11 days left Under 14 days

Change log

verified Fri, Oct 9 · 5:16 PM MST

No amendments since posting on Wed, Aug 19; verified Fri, Oct 9 · 5:16 PM MST.

Report a problem

Notice as published

Silverbell Road Roadway Improvements - El Camino del Cerro to Goret Road

The project consists of a total of 3.27 miles of road improvements including 2.63 miles of Silverbell Rd., from 0.25 miles north of El Camino Del Cerro to 0.2 miles north of Goret Rd., 0.50 mile of El Camino Del Cerro, and 0.14 mile of Sweetwater Dr. The construction consists of four lanes of roadway with medians, curbs, sidewalks, multi-use path, traffic signals, street lighting, landscaping and irrigation, utility work and drainage facilities.

NIGP codes: 91275 Quality Control Testing Services for Construction; 91276 Striping Streets, Parking Facilities, Lane Divisions, etc. (Paint); 91371 Maintenance and Repair, Highway and Road (To include the removal of asphalt, concrete, bitumens, etc); 91396 Paving/Resurfacing, Street (Major and Residential); 96861 Pavement Marking Services (Including Removal of Markings); 96874 Street Sweeping Services; 96884 Traffic Control Services (To Include Placement and Removal of Control Devices)

Addenda issued: 3

Listing collected from Arizona State Procurement Office - Arizona Procurement Portal (APP, Ivalua). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site