Sign inGet alerts
Request for proposalsConstructionCounty buyer

Shoreline Transfer Station Dust Control Project

King County, Washington
Responses dueTue, Oct 201:30 PM PT · Washington time11 days left
PostedThu, Oct 8No amendments since
Solicitation no.KC001711,1Washington DES - WEBS (Washington's Electronic Business Solution)
Set-asideNoneOpen to all firms

What the county is buying

by RFPFinder from the notice; the solicitation governs

King County is purchasing a dust control system for the Shoreline Transfer Station. Offers will be evaluated as Firm-fixed-price contracts.

Scope

  • Installation of a steel partition wall on mezzanine over tipping floor
  • Construct and install misting system modifications
Submission: portalDays to respond: 11

How to get the bid documents

  1. Open the notice on Washington DES - WEBS (Washington's Electronic Business Solution)
  2. Read the notice; the source lists no attachments
  3. Submit by portal before 1:30 PM PT on Oct 20

The source notice lists no attachments.

Open the original listing on the agency portal

Details

Place of performance
Washington
Buyer type
County
Notice type
Construction Solicitation
Solicitation no.
KC001711,1
Category
Construction
Delivery location
Shoreline Transfer Station from notice
Contract type
Firm-fixed-price from notice
Local presence
Not required
Amendments
None since Oct 8
Contact
Leeann Snyder
Email
lsnyder@kingcounty.gov

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Thu, Oct 8Posted
Not statedQuestions due
Tue, Oct 20 · 1:30 PM PTResponses due · 11 days left Under 14 days

Change log

verified Fri, Oct 9 · 11:15 AM PT

No amendments since posting on Thu, Oct 8; verified Fri, Oct 9 · 11:15 AM PT.

Report a problem

Notice as published

Shoreline Transfer Station Dust Control Project

The purpose of the contract is to install a new dust control system at the Shoreline Transfer Station. The work includes but is not limited to installation of a steel partition wall on mezzanine over tipping floor, construct and install misting system modifications including new pump, air compressor, sensors, control, programming, testing and commissioning, installation of supply fan and tie into existing controls, demolition of duct hood and cap ducting, test and balance HVAC system in office area, repair damaged section of air barrier, and all other work in the contract documents.

Amendment: Addendum 1 has been issued. Suppliers must acknowledge all addenda before submitting a response. If a supplier has already submitted a response, they MUST log into the E-Procurement Supplier Portal, acknowledge the addendum, and resubmit.

Responses due: 10/20/2026 1:30 PM PDT

Solicitation files (download from the supplier portal): KC001711-addendum-1.pdf; KC001711-itb-docs.zip

Listing collected from Washington DES - WEBS (Washington's Electronic Business Solution). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site