Sign inGet alerts

RFQ - Storage Building Restoration and Field Access Improvements

Verified 6 h agoLocal presence required
Responses dueMon, Nov 210:00 AM ET · North Carolina time18 days left
PostedWed, Oct 14No amendments since
Solicitation no.146-101426ACMSNC Division of Purchase & Contract - Electronic Vendor Portal (eVP)
Set-asideNoneOpen to all firms

What the county is buying

by RFPFinder from the notice and attachments; the solicitation governs

Ashe County Schools seeks a North Carolina-licensed general contractor to design, engineer, and construct a pre-engineered metal storage building and field-access improvements at Ashe County Middle School. The project is a turnkey construction contract with sealed-bid evaluation.

Scope

  • Design, engineer, and construct 936-square-foot pre-engineered metal storage building
  • Field-access improvements and site work at Ashe County Middle School
Local presence requiredDays to respond: 18

How to get the bid documents

  1. Download the 2 documents below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit through NC Division of Purchase & Contract - Electronic Vendor Portal (eVP) (free account) before 10:00 AM ET on Nov 2

To submit, you need a free account at NC Division of Purchase & Contract - Electronic Vendor Portal (eVP).

Documents · 2 items, 2 filesDownload all (zip) · Pro
  • PDF
    SOW - ACMS Building & Field Access Imp.pdf381 KB · 7 pages
  • PDF
    RFQ Storage Building Restoration 10-13-26 (1).pdf53 KB · 1 page
Open the original listing on the agency portal

Details

Place of performance
North Carolina
Buyer type
School district
Notice type
RFP
Solicitation no.
146-101426ACMS
Category
Construction · beta
Delivery location
Ashe County Middle School from notice
Local presence
Required
Amendments
None since Oct 14
Contact
Amanda Coldiron

Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Wed, Oct 14Posted
Not statedQuestions due
Mon, Nov 2 · 10:00 AM ETResponses due · 18 days left

Change log

verified Thu, Oct 15 · 2:16 PM ET

No amendments since posting on Wed, Oct 14; verified Thu, Oct 15 · 2:16 PM ET.

Report a problem

Notice as published

RFQ - Storage Building Restoration and Field Access Improvements

Ashe County Schools seeks a qualified North Carolina-licensed General Contractor to provide all labor, supervision, materials, equipment, engineering, permits, testing, inspections, coordination, and incidentals needed to complete one combined project at Ashe County Middle School. The Work consists of construction of a new pre-engineered metal Storage Building and associated field-access improvements. The completed project shall be turnkey, safe, weather-tight, code-compliant, accessible where applicable, and fully operational.

The building concept is approximately 52 feet by 18 feet (936 square feet). All dimensions, grades, utility locations, access conditions, and tie-in points are approximate and shall be field-verified before construction.

Special instructions: RFQ - design, engineer, and construction

Similar open RFPs

same contracting office

Listing collected from NC Division of Purchase & Contract - Electronic Vendor Portal (eVP). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site