What the authority is buying
by RFPFinder from the notice and attachments; the solicitation governsThe Brazos River Authority solicits sealed proposals for EWCRWS Infrastructure and Expansion—Trinity Well and Phase 1D Projects, involving water treatment plant improvements. Proposals are evaluated on published criteria; the BRA will negotiate with the highest-ranked respondent and reserves the right to reject all proposals.
Scope
- Phase 1B Trinity Well infrastructure improvements: cooling towers, chemical monitoring, stormwater, electrical, automation, access roads.
- Phase 1D short-term expansion: raw water pumping, storage, clarifiers, filters, backwash basin, finished water storage, pump station.
How to get the bid documents
- Download the 10 stored documents below; 3 more open at the source
- Check the submission requirements in the compliance checklist
- Submit by physical before 10:00 AM CT on Nov 3
Details
- Place of performance
- Texas
- Buyer type
- Public
- Notice type
- RFP
- Solicitation no.
- 26-1392
- Category
- Construction
- Delivery location
- East Williamson County Regional Water System Water Treatment Plant (EWCWTP), Waco, Texas from notice
- Contract type
- Firm-fixed-price construction from attachment p.4
- Estimated value
- $216M from notice
- Local presence
- Required
- Amendments
- None since Aug 3
- Contact
- Bryan Gray
- Phone
- (254) 761-3123
Not stated in the notice: period of performance. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Pre-bid location
- not stated
Change log
verified Sat, Oct 10 · 1:17 PM CTNo amendments since posting on Mon, Aug 3; verified Sat, Oct 10 · 1:17 PM CT.
Report a problem
Notice as published
RFP 26-1392 EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project
The BRA is soliciting sealed proposals for the EWCRWS Infrastructure and Expansion
The “1B1D PROJECT” represents two critical expansion improvements to the Brazos River Authority’s (BRA) East Williamson County’s Regional Water System Water Treatment Plant (EWCWTP); Phase 1B and Phase 1D. The Phase 1B Trinity Well Infrastructure Improvements will use cooling towers to treat up to 4 MGD of groundwater from the existing Trinity Well #1 for blending with treated surface water from Granger Lake. Trinity Well #1 is located on the campus of the EWCWTP.
Additionally, Phase 1B work located at the EWCWTP includes significant chemical monitoring and distribution systems, stormwater system, upgrades to electrical and automation, and access road improvements that provide future buildout resilience. Phase 1B has schedule priority . The Phase 1D Short-term Expansion continues improvements at the EWCWTP to treat up to 13 MGD of additional surface water from Granger Lake by expanding raw water pumping capacity, upgrading storage reservoir inlets, outlets, and pumping capacity, upgrades to existing chemical systems, upgrades to electrical and automation systems, new rapid mix system, two new clarifiers, modify piping at four existing filters, four new additional filter systems, new backwash basin demolition of existing components and structures being replaced or removed, an additional 4.25 MG of finished water storage capacity for storage of blended treated groundwater (from Phase 1B) with treated surface water (from Phase 1D), and access road improvements.
Phase 1D also includes a new medium service pump station for transmission of the finished water to the BRA’s existing and potential new customers, while providing future buildout resilience for longer term expansion.
Responses submitted at: https://www.bidnetdirect.com/texas/brazosriverauthority Responses submitted by email to: [email on the source notice] More information: https://www.bidnetdirect.com/texas/brazosriverauthority Posting requirement: 21+ Days for Solicitation Notice
NIGP codes: 15500 Buildings And Structures: Fabricated And Prefabricated; 90900 Building Construction Services, New (Incl. Maintenance And Repair Services); 91148 C.I.P., Preconstruction Services; 91177 Facilities and Other Improvements; 91200 Construction Services, General (Incl. Maintenance And Repair Services); 91238 Construction Services, Hazardous Waste (Incl.
Site Management); 91300 Construction Services, Heavy (Incl. Maintenance And Repair Services); 91359 Construction And Upgrades, Wastewater Treatment Plant; 91360 Construction, Water System/Plants, Main And Service Line; 91391 Maintenance And Repair, Wastewater Treatment Plant; 91400 Construction Services, Trade (New Construction); 95108 Facilities and Other Improvements, Fences; 95109 Facilities and Other Improvements; 95115 Infrastructure and Infrastructure Improvements
Listing collected from Texas Comptroller - Electronic State Business Daily (ESBD) + Centralized Master Bidders List (CMBL). Always confirm requirements in the original solicitation before you bid.