Sign inGet alerts
Request for proposalsConstructionPublic buyer

RFP 26-1392 EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project

Verified 2 h agoLocal presence required
Responses dueTue, Nov 310:00 AM CT · Texas time24 days left
PostedMon, Aug 3No amendments since
Solicitation no.26-1392Texas Comptroller - Electronic State Business Daily (ESBD) + Centralized Master Bidders List (CMBL)
Set-asideNoneOpen to all firms
Estimated value$216Mfrom $1.0M · from notice

What the authority is buying

by RFPFinder from the notice and attachments; the solicitation governs

The Brazos River Authority solicits sealed proposals for EWCRWS Infrastructure and Expansion—Trinity Well and Phase 1D Projects, involving water treatment plant improvements. Proposals are evaluated on published criteria; the BRA will negotiate with the highest-ranked respondent and reserves the right to reject all proposals.

Scope

  • Phase 1B Trinity Well infrastructure improvements: cooling towers, chemical monitoring, stormwater, electrical, automation, access roads.
  • Phase 1D short-term expansion: raw water pumping, storage, clarifiers, filters, backwash basin, finished water storage, pump station.
Local presence requiredMandatory pre-bid Aug 18TDP access mandatory before bidSubmission: physicalDays to respond: 24

How to get the bid documents

  1. Download the 10 stored documents below; 3 more open at the source
  2. Check the submission requirements in the compliance checklist
  3. Submit by physical before 10:00 AM CT on Nov 3
Documents · 11 items, 13 filesDownload all (zip) · Pro
  • PDF
    RFP No. 26-1392 EWCRWS 1B1D Projects_final.pdf3.3 MB · 73 pages
  • PDF
    2_VOL1_1B Specs-v2 Updated.pdfToo large, open at source
  • PDF
    3_VOL2_1D Specs-v2 Updated.pdfToo large, open at source
  • PDF
    Attachment 1_1B1D_DWGS-v1_reduced.pdfToo large, open at source
  • PDF
    TXDOT Files July 2026.pdf24.1 MB · 66 pages
  • PDF
    Addendum No. 1_RFP 26-1392_modify schedule.pdf400 KB · 1 page
  • PDF
    PreProposal MTG RFP 26-1392_Aug20_10AM.pdf181 KB · 2 pages
  • 1 earlier version
    • PDF
      PreProposal MTG RFP 26-1392_Aug18_10AM.pdf681 KB · 2 pages
  • PDF
    PreProposal MTG RFP 26-1392_Aug20_1PM.pdf175 KB · 2 pages
  • 1 earlier version
    • PDF
      PreProposal MTG RFP 26-1392_Aug18_1PM.pdf683 KB · 2 pages
  • PDF
    Addendum No. 6 RFP 26-1392 1B1D Projects_Add Site Visits_Q&A.pdf517 KB · 5 pages
  • PDF
    Addendum No. 7 RFP 26-1392_Replace clarifier specs.pdf797 KB · 22 pages
  • PDF
    Addendum No. 8 RFP 26-1392 1B1D Projects_AddSTP_11.04_QandA2.pdf8.6 MB · 14 pages
Open the original listing on the agency portal

Details

Place of performance
Texas
Buyer type
Public
Notice type
RFP
Solicitation no.
26-1392
Category
Construction
Delivery location
East Williamson County Regional Water System Water Treatment Plant (EWCWTP), Waco, Texas from notice
Contract type
Firm-fixed-price construction from attachment p.4
Estimated value
$216M from notice
Local presence
Required
Amendments
None since Aug 3
Contact
Bryan Gray
Email
allison.sheeler@brazos.org
Phone
(254) 761-3123

Not stated in the notice: period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Mon, Aug 3Posted
Aug 18Pre-bid held Mandatory
Tue, Nov 3 · 10:00 AM CTResponses due · 24 days left
Pre-bid location
not stated

Change log

verified Sat, Oct 10 · 1:17 PM CT

No amendments since posting on Mon, Aug 3; verified Sat, Oct 10 · 1:17 PM CT.

Report a problem

Notice as published

RFP 26-1392 EWCRWS Infrastructure and Expansion - Trinity Well and Phase 1D Project

The BRA is soliciting sealed proposals for the EWCRWS Infrastructure and Expansion

The “1B1D PROJECT” represents two critical expansion improvements to the Brazos River Authority’s (BRA) East Williamson County’s Regional Water System Water Treatment Plant (EWCWTP); Phase 1B and Phase 1D. The Phase 1B Trinity Well Infrastructure Improvements will use cooling towers to treat up to 4 MGD of groundwater from the existing Trinity Well #1 for blending with treated surface water from Granger Lake. Trinity Well #1 is located on the campus of the EWCWTP.

Additionally, Phase 1B work located at the EWCWTP includes significant chemical monitoring and distribution systems, stormwater system, upgrades to electrical and automation, and access road improvements that provide future buildout resilience. Phase 1B has schedule priority . The Phase 1D Short-term Expansion continues improvements at the EWCWTP to treat up to 13 MGD of additional surface water from Granger Lake by expanding raw water pumping capacity, upgrading storage reservoir inlets, outlets, and pumping capacity, upgrades to existing chemical systems, upgrades to electrical and automation systems, new rapid mix system, two new clarifiers, modify piping at four existing filters, four new additional filter systems, new backwash basin demolition of existing components and structures being replaced or removed, an additional 4.25 MG of finished water storage capacity for storage of blended treated groundwater (from Phase 1B) with treated surface water (from Phase 1D), and access road improvements.

Phase 1D also includes a new medium service pump station for transmission of the finished water to the BRA’s existing and potential new customers, while providing future buildout resilience for longer term expansion.

Responses submitted at: https://www.bidnetdirect.com/texas/brazosriverauthority Responses submitted by email to: [email on the source notice] More information: https://www.bidnetdirect.com/texas/brazosriverauthority Posting requirement: 21+ Days for Solicitation Notice

NIGP codes: 15500 Buildings And Structures: Fabricated And Prefabricated; 90900 Building Construction Services, New (Incl. Maintenance And Repair Services); 91148 C.I.P., Preconstruction Services; 91177 Facilities and Other Improvements; 91200 Construction Services, General (Incl. Maintenance And Repair Services); 91238 Construction Services, Hazardous Waste (Incl.

Site Management); 91300 Construction Services, Heavy (Incl. Maintenance And Repair Services); 91359 Construction And Upgrades, Wastewater Treatment Plant; 91360 Construction, Water System/Plants, Main And Service Line; 91391 Maintenance And Repair, Wastewater Treatment Plant; 91400 Construction Services, Trade (New Construction); 95108 Facilities and Other Improvements, Fences; 95109 Facilities and Other Improvements; 95115 Infrastructure and Infrastructure Improvements

Listing collected from Texas Comptroller - Electronic State Business Daily (ESBD) + Centralized Master Bidders List (CMBL). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site