REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS

AGRICULTURE, DEPARTMENT OF, North Dakota · FOREST SERVICE · USDA-FS, CSA INTERMOUNTAIN 8
Unverified · check sourceUpdated Oct 6 · Updated
Responses dueWed, Sep 234:00 PM CT · North Dakota timeClosed
PostedWed, Sep 9No amendments since
Solicitation no.1240LT-26-Q-0182SAM.gov
Set-asideSBOnly firms holding this status can compete

What the agency is buying

from the notice as published

The Contractor shall provide all professional services necessary for the accomplishment of each project and such required services shall be in accordance with requirements as described herein. The Contractor shall provide services for the following tasks marked by an X: [X] Provide a quote and a technical proposal to complete the project as per project requirements. Provide separate estimates…

Small business set-aside

How to get the bid documents

Attachment list not pulled yet; check the source notice.

Open the original listing on SAM.gov

Details

Place of performance
Ogden, North Dakota
Buyer type
Federal
Notice type
Combined Synopsis/Solicitation
Solicitation no.
1240LT-26-Q-0182
NAICS
NAICS 238120 (Structural Steel and Precast Concrete Contractors)
Size standard
$19M revenue SBA table, NAICS 238120
PSC
PSC Y1JZ (CONSTRUCTION OF MISCELLANEOUS BUILDINGS): 11 open RFPs
Amendments
None since Sep 9
Contact
Derrick A Dodson
Office
FOREST SERVICE · USDA-FS, CSA INTERMOUNTAIN 8
Email
derrick.dodson@usda.gov

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Wed, Sep 9Posted
Not statedQuestions due
Wed, Sep 23 · 4:00 PM CTResponses due · closed
Closed
Mon, Oct 5

Change log

verified Tue, Oct 6 · 11:30 PM CT
  1. Posted · Combined Synopsis/SolicitationWed, Sep 9 · 8:49 AM CT
  2. ClosedMon, Oct 5 · 5:35 AM CT
  3. Updated · description text changedTue, Oct 6 · 11:32 PM CT

Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.

Report a problem

Notice as published

REMOVE AND REPLACE CONCRETE DRAINAGE PAD FOR BUILDING #11 WITH OPTOINS

The Contractor shall provide all professional services necessary for the accomplishment of each project and such required services shall be in accordance with requirements as described herein. The Contractor shall provide services for the following tasks marked by an X: [X] Provide a quote and a technical proposal to complete the project as per project requirements. Provide separate estimates for Base and both options. [X] The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete and pour new concrete drainage that is approximately 6ft x 48ft x 6 inches in depth for building #11.

The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete. Minimum rebar must be used as to proper code for slabs and any materials necessary. The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work.

The Contactor shall pour the drainage to run off towards the north elevation. Contractor to cut in grooves that are to the satisfaction of the COR onsite. [X] Option 1: Bldg#28 south side: Demo old Concrete pad approximately 25ft. wide by 30ft. in length by 6 inches in depth with all associated landscaping, fill, re-bar and materials and install new concrete pad. Cut groves into the concrete on slopes like currently exists.

Reinstall drainpipe and work around pea rock roof [X] Option 2: Bldg#12 east side: The contractor shall furnish all the skilled labor, materials, equipment, tools, transportation, and supervision necessary to remove/demo old concrete sections and pour new concrete ramp that is approximately 28ft. x 90ft x 6 inches in depth. The contractor shall furnish, prepare, and install all required landscaping/site work required to prepare the area for concrete. Minimum rebar must be used as to proper code for slabs and any materials necessary.

The Contractor shall be responsible for transporting any fill to the jobsite and all compacting and prep work. The Contactor shall pour the upper ramp elevation area and cut in heavy grooves as presently exist that are to the satisfaction of the COR onsite. Existing railings shall be removed and a new one installed and cemented in with the concrete.

What this office paid before

USAspending.gov, last 36 months

1 award matched · tier 1: this contracting office (1240LT) + PSC Y1JZ. Most recent:

  • Sep 28CMIP LLCCONCRETE WORK AROUND BUILDINGS #11 AND #281240LT26P0045 · PURCHASE ORDER · Forest Service · ends Jul 4, 2027$57K
Pro

Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.

Sign in or upgrade

Awards for this key have not been synced yet.

This contracting office

2 other open notices from this office · buys mostly Construction

Similar open RFPs

same PSC Y1JZ

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov