Sign inGet alerts

Closed Wed, Oct 7. Responses were due Wed, Oct 7 · 8:00 AM ET. This notice is kept for reference and no longer takes responses.

Pre-Advertisement Notice for SR 154 Memorial Drive Corridor-Design Services

Unverified · check source
Responses dueWed, Oct 78:00 AM ET · Georgia timeClosed
PostedThu, Sep 10No amendments since
Solicitation no.PE-66062-NONST-2027-000000471Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace
Set-asideNoneOpen to all firms

What the city is buying

from the notice as published

The City of Atlanta, on behalf of the Department of Transportation (DOT), will soon initiate a Multi-Step Sealed Bid process consisting of an initial prequalification phase followed by an Request for Proposal (RFP) to engage qualified contractors. The project scope includes expanding sidewalks along SR 154/Memorial Drive between Connally Street and Grant Street to reconnect missing, broken, or…

How to get the bid documents

Documents · 3 items, 3 filesDownload all (zip) · Pro
  • PDF
    Appendix B.pdf161 KB · 6 pages
  • PDF
    Appendix A.pdf332 KB · 14 pages
  • PDF
    SCOPE_9 22 26.pdf171 KB · 1 page
Open the original listing on the agency portal

Details

Place of performance
Georgia
Buyer type
City
Notice type
Non-State Agency
Solicitation no.
PE-66062-NONST-2027-000000471
Category
Architecture & Engineering · beta
Amendments
None since Sep 10
Email
BDavis@atlantaga.gov

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Thu, Sep 10Posted
Not statedQuestions due
Wed, Oct 7 · 8:00 AM ETResponses due · closed
Closed
Wed, Oct 7

Change log

verified Wed, Oct 7 · 4:35 AM ET
  1. Posted · Non-State AgencyThu, Sep 10 · 3:31 PM ET
  2. ClosedWed, Oct 7 · 8:16 AM ET
Report a problem

Notice as published

Pre-Advertisement Notice for SR 154 Memorial Drive Corridor-Design Services

The City of Atlanta, on behalf of the Department of Transportation (DOT), will soon initiate a Multi-Step Sealed Bid process consisting of an initial prequalification phase followed by an Request for Proposal (RFP) to engage qualified contractors. The project scope includes expanding sidewalks along SR 154/Memorial Drive between Connally Street and Grant Street to reconnect missing, broken, or damaged sidewalk segments and upgrade facilities to ADA standards where required. Existing curbs will remain where feasible, and a planting strip will be installed between the new sidewalks and the existing curb at radius returns.

This procurement aims to enhance pedestrian accessibility along a rapidly evolving corridor by improving sidewalk connectivity, upgrading ADA compliance, and reducing pedestrian crashes through the installation of planting strips. The City expects selected contractor(s) to deliver timely, coordinated, and high-quality services while minimizing disruption within the work area. Vendors with the capacity to provide dependable technical expertise, maintain adequate staffing, and support both planned and operationally sensitive work are encouraged to participate.

A Pre Solicitation Conference will be announced and held to offer additional information about the upcoming solicitation, clarify the anticipated scope, and address vendor questions

Listing collected from Georgia DOAS - Georgia Procurement Registry (GPR) / Team Georgia Marketplace. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site