Sign inGet alerts
Request for proposalsConstruction · betaCity buyer

Pedestrian Crossing Safety Improvements (FHWA)

City of Seattle, Washington · Public Works
Verified 3 h agoLocal presence required
Responses dueWed, Nov 42:00 PM PT · Washington time21 days left
PostedWed, Oct 14No amendments since
Solicitation no.PW#2025-041Washington DES - WEBS (Washington's Electronic Business Solution)
Set-asideNoneOpen to all firms
Estimated value$3.4Mfrom $3.3M · from notice

What the city is buying

by RFPFinder from the notice; the solicitation governs

The City of Seattle seeks bids for pedestrian crossing safety improvements at eight intersections, including sidewalk, pavement, signals, and drainage work. Sealed bids are due November 4, 2026, awarded to the lowest responsive responsible bidder.

Scope

  • Sidewalk and pavement removal, restoration, curbs, ramps, drainage
  • Pedestrian islands, RRFB signals, traffic signals, signing, landscaping
Local presence requiredQ&A closes Oct 29Submission: physicalDays to respond: 21

How to get the bid documents

  1. Open the notice on Washington DES - WEBS (Washington's Electronic Business Solution)
  2. Read the notice; the source lists no attachments
  3. Submit by physical before 2:00 PM PT on Nov 4

The source notice lists no attachments.

Open the original listing on the agency portal

Details

Place of performance
Washington
Buyer type
City
Notice type
Solicitation
Solicitation no.
PW#2025-041
Category
Construction · beta
Delivery location
15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, Renton Ave S and Holden St, 55th Ave S and Renton Ave S, Rainier Ave from notice
Estimated value
$3.4M from notice
Local presence
Required
Amendments
None since Oct 14
Contact
Nick Shrope · Civil Engineer
Office
Public Works
Email
nicholas.shrope@seattle.gov
Phone
(206) 233-3925

Not stated in the notice: contract type, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation, and note the question deadline.

Key dates

Wed, Oct 14Posted
Thu, Oct 29 · 5:00 PM PTQuestions due · 15 days
Wed, Nov 4 · 2:00 PM PTResponses due · 21 days left

Change log

verified Wed, Oct 14 · 11:18 AM PT

No amendments since posting on Wed, Oct 14; verified Wed, Oct 14 · 11:18 AM PT.

Report a problem

Notice as published

Pedestrian Crossing Safety Improvements (FHWA)

Released: October 14, 2026 12:00 AM PDT Questions due (Question Submission Deadline): October 29, 2026 5:00 PM PDT Responses due (Bid Open Date): November 4, 2026 2:00 PM PST

Project Description: This project includes the following major elements of work: Sidewalk and pavement removal and restoration. Other elements include: pedestrian islands, curbs, curb ramps, drainage structures and pipes, clearing and grubbing, landscaping, RRFB signals, traffic signals, signing and channelization. For the purpose of the Bidder/Subcontractor List, this project includes Electrical and Rebar Installation.

Engineer's Estimate: $3,250,000 to $3,350,000

Project Location: 15th Ave S and Lander St, 33rd Ave S and Myrtle Pl, Renton Ave S and Holden St, 55th Ave S and Renton Ave S, Rainier Ave S and S Byron St, Rainier Ave S and S Findlay St, Rainier Ave S and S Mead St, & Beacon Ave S and S Webster St

Listing collected from Washington DES - WEBS (Washington's Electronic Business Solution). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site