Sign inGet alerts
Request for informationTransportation · betaPublic buyer

Natural Gas Transportation -500MW Power Plant, Astoria, New York

Power Authority of New York, New York · Fuels Department
Responses dueThu, Dec 3111:59 PM ET · New York time83 days left
PostedWed, Mar 27, 2024No amendments since
Solicitation no.2108354New York State Contract Reporter
Set-asideNoneOpen to all firms

What the authority is buying

Summary in progress

We have not summarized this notice yet. Read the notice at the source.

Days to respond: 83

How to get the bid documents

  1. Create a free account on New York State Contract Reporter
  2. Open solicitation 2108354
  3. Download the bid documents and submit before 11:59 PM ET on Dec 31

Bid documents are on the agency portal login required at source

Open the original listing on the agency portal

Details

Place of performance
From Production Area to existing interstate pipeline interconnection with the Ne, New York
Buyer type
Public
Notice type
Requests for information (RFI) and Requests for Comment (RFC
Solicitation no.
2108354
Category
Transportation · beta
Amendments
None since Mar 27, 2024

Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.

Key dates

Wed, Mar 27, 2024Posted
Not statedQuestions due
Thu, Dec 31, 2026 · 11:59 PM ETResponses due · 83 days left

Change log

verified Sat, Oct 10 · 2:16 AM ET

No amendments since posting on Wed, Mar 27, 2024; verified Sat, Oct 10 · 2:16 AM ET.

Report a problem

Notice as published

Natural Gas Transportation -500MW Power Plant, Astoria, New York

Details are on the agency portal.

Similar open RFPs in New York

same contracting office

Listing collected from New York State Contract Reporter. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site