Compliance checklist
Modernization of the Gillespie Field (SEE) Air Traffic Control Tower (ATCT) · 697DCK-27-R-SEE01. 143 requirement sentences found in the notice and 2 attachments: every "shall", "must" and "required", quoted as written and sorted into submission requirements (1) and performance / contract clauses (142). Nothing is generated.
The full checklist is a Pro feature
143 requirement sentences on this RFP. Pro shows every one, grouped by section, with a CSV export, for $39/mo. Below is a preview.
Sign in or upgradeSubmission requirements · 1
SEE ATCT TFIP Draft Specifications (03.28.2025).pdf · 1.20 ASBESTOS AND LEAD FREE CERTIFIC · 1
Performance / contract clauses · 142
SEE ATCT TFIP Draft Specifications (03.28.2025).pdf · A. Drawings showing general outlines · 2
SEE ATCT TFIP Draft Specifications (03.28.2025).pdf · C. The FAA will provide the Contract · 2
Extracted from the notice text and attachments as published. The solicitation governs; read Sections L and M in full before you submit.