Sign inGet alerts

Lime Slurry Supply at Water Resource Recovery Facilities (WRRFs) and Pump Stations RFP 607

State of South Carolina, South Carolina · Renewable Water Resources
Responses dueFri, Dec 42:00 PM ET · South Carolina time47 days left
PostedThu, Oct 15No amendments since
Solicitation no.607SC Division of Procurement Services - SCBO / SCEIS Vendor Registration
Set-asideNoneOpen to all firms

What the state is buying

by RFPFinder from the notice; the solicitation governs

Renewable Water Resources (ReWa), a South Carolina special purpose district, seeks supply and delivery of lime slurry (minimum 30% in bulk loads and totes) for wastewater treatment at its facilities and pump stations. Responses are evaluated via RFP with a mandatory pre-proposal meeting; award method not stated.

Scope

  • Supply and deliver lime slurry for wastewater treatment
  • Minimum 30% in bulk loads and totes to multiple ReWa locations
Mandatory pre-bid Nov 17Submission: portalDays to respond: 47

How to get the bid documents

  1. Open the notice on SC Division of Procurement Services - SCBO / SCEIS Vendor Registration
  2. Read the notice; the source lists no attachments
  3. Submit by portal before 2:00 PM ET on Dec 4

To submit, you need a free account at SC Division of Procurement Services - SCBO / SCEIS Vendor Registration.

The source notice lists no attachments.

Open the original listing on the agency portal

Details

Place of performance
South Carolina
Buyer type
State
Notice type
RFP
Solicitation no.
607
Category
Supplies & Equipment · beta
Local presence
Not required
Amendments
None since Oct 15
Contact
Renewable Water Resources via Planetbids
Office
Renewable Water Resources
Email
ronshicam@re-wa.org
Phone
864-299-4000

Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Thu, Oct 15Posted
Tue, Nov 17 · 10:00 AM ETPre-bid meeting Mandatory
Fri, Dec 4 · 2:00 PM ETResponses due · 47 days left
Pre-bid location
660 Mauldin Road, Greenville, South Carolina 29607 (Gate B)

Change log

verified Sun, Oct 18 · 8:16 AM ET

No amendments since posting on Thu, Oct 15; verified Sun, Oct 18 · 8:16 AM ET.

Report a problem

Notice as published

Lime Slurry Supply at Water Resource Recovery Facilities (WRRFs) and Pump Stations RFP 607

Renewable Water Resources (“ReWa” or “Owner”), a special purpose district and political subdivision of the State of South Carolina, with its principal place of business at 561 Mauldin Road, Greenville, South Carolina 29607 is soliciting sources of supply and delivery for Lime Slurry with a minimum of 30% in the form of bulk loads and totes from Vendors for the treatment of wastewater at ReWa Water Resource Recovery Facilities (WRRFs) and Pump Station locations.

Responses due: December 4, 2026 - 2:00pm

Pre-bid information: Pre-Proposal Meeting is mandatory and is located at 660 Mauldin Road, Greenville, South Carolina 29607 (Gate B) on 11/17/2026 at 10:00 am EDT.

Full details / download: https://vendors.planetbids.com/portal/42823/portal-home

SCBO category: Services

Listing collected from SC Division of Procurement Services - SCBO / SCEIS Vendor Registration. Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site