What the state is buying
from the notice as publishedSeptember 29, 2026 NOTICE TO APPLICANTS ADDENDUM NO. ONE (1) Madison Blue Spring - Retaining Wall DEP BID NO. BDC05-26/27 TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION. NOTICE It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is…
How to get the bid documents
Details
- Place of performance
- Tallahassee, Florida
- Buyer type
- State
- Notice type
- Invitation to Bid
- Solicitation no.
- BDC05-26-27
- Category
- Construction · beta
- Amendments
- 1, last Sep 29
- Contact
- Logan Lee-Marple
- Phone
- (850) 245-2519
Not stated in the notice: estimated value, contract type, period of performance, evaluation criteria, local-presence rule. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Amendment 1
- Tue, Sep 29
- Closed
- Tue, Oct 6
Change log
verified Tue, Oct 6 · 2:16 PM ET- Posted · Invitation to BidWed, Sep 16 · 3:40 PM ET
- Amendment · New version of the notice posted at the sourceTue, Sep 29 · 4:29 PM ET
- ClosedTue, Oct 6 · 8:15 PM ET
Report a problem
Notice as published
Addendum 1 - BDC05-26-27 Madison Blue Spring - Retaining Wall
September 29, 2026
NOTICE TO APPLICANTS
ADDENDUM NO. ONE (1)
Madison Blue Spring - Retaining Wall
DEP BID NO. BDC05-26/27
TO BIDDERS AND PLAN HOLDERS ON THE ABOVE REFERENCED PROJECT: PLEASE NOTE CONTENTS HEREIN AND INCLUDE, SIGNED, WITH YOUR BID SUBMISSION.
NOTICE
It will be required that this addendum be signed in acknowledgment of receipt and that it be included with your Bid when same is submitted to Logan Lee-Marple, Contracts Specialist, Bureau of Design and Construction, 3800 Commonwealth Blvd., MS #520, Tallahassee, Florida, 32399-3000. Failure to do so may be grounds for rejection of the Bid.
_______________________________________
Signature of Contractor and Date
The following statements supersede & supplement the corresponding items in the specifications & drawings:
Question: Specifically, could you please confirm whether the retaining wall is specified or being considered as a precast concrete system? If precast concrete is included in the project requirements, or if it may be accepted as an alternate, our company would be very interested in reviewing the project and potentially submitting a bid as a precast concrete manufacturer/supplier?
Answer: The rock gabion wall was designed as a replacement intended to match the existing wall as closely as possible in order to preserve the overall aesthetics of the site. Therefore, Hydra does not believe that a concrete wall would be an acceptable alternative design. If FDEP would prefer that the precast concrete wall be evaluated as an acceptable alternative, additional engineering analysis would be required to assess the adequacy of the change in material.
In all other respects, the contract documents of which this is an Addendum, and attachments relative thereto, shall remain in full force and effect.
Listing collected from MyFloridaMarketPlace (MFMP) Vendor Bid System. Always confirm requirements in the original solicitation before you bid.