Sign inGet alerts

IFB No. 27-13: Hale Street Drainage Project

City of Newburyport, Massachusetts
Responses dueWed, Oct 2811:00 AM ET · Massachusetts time13 days left
PostedWed, Oct 14No amendments since
Solicitation no.BD-27-1158-NBPT3-NBPT3-134457Massachusetts OSD - COMMBUYS (Periscope)
Set-asideNoneOpen to all firms

What the city is buying

by RFPFinder from the notice; the solicitation governs

The City of Newburyport seeks bids for the Hale Street Drainage Project, including site preparation, erosion controls, earthwork, and installation of drainage infrastructure. This is an Invitation for Bids with award to the lowest responsive responsible bidder.

Scope

  • Removal of existing guardrail, site preparation, erosion controls, and earthwork
  • Installation of precast concrete DMH, ADS drainpipe, fill, riprap, loaming and seeding
Sealed bid — price onlySubmission: physicalDays to respond: 13

How to get the bid documents

  1. Open the notice on Massachusetts OSD - COMMBUYS (Periscope)
  2. Read the notice; the source lists no attachments
  3. Submit by physical before 11:00 AM ET on Oct 28

To submit, you need a free account at Massachusetts OSD - COMMBUYS (Periscope).

The source notice lists no attachments.

Open the original listing on the agency portal

Details

Place of performance
Massachusetts
Buyer type
City
Notice type
Non-Statewide Solicitation
Solicitation no.
BD-27-1158-NBPT3-NBPT3-134457
Category
Construction · beta
Evaluation
Sealed bid, price only from notice
Local presence
Not required
Amendments
None since Oct 14
Contact
- download bid documents at www.cityofnewburyport.com/bids
Email
twatkins@newburyportma.gov
Phone
(978) 465-4412

Not stated in the notice: estimated value, contract type, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Wed, Oct 14Posted
Not statedQuestions due
Wed, Oct 28 · 11:00 AM ETResponses due · 13 days left Under 14 days

Change log

verified Thu, Oct 15 · 2:21 AM ET

No amendments since posting on Wed, Oct 14; verified Thu, Oct 15 · 2:21 AM ET.

Report a problem

Notice as published

IFB No. 27-13: Hale Street Drainage Project

Scope of Work for the Hale Street Drainage Project includes but is not limited to: removal of the existing guardrail, site preparation, installation of erosion controls, earthwork, installation of precast concrete DMH, 30â?? ADS drainpipe, fill, and riprap as shown on plans, loaming and seeding all disturbed areas, and any potential add alternates as listed.

Pre-bid conference: No Applicable

Listing collected from Massachusetts OSD - COMMBUYS (Periscope). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site