What the agency is buying
by RFPFinder from the notice and attachments; the solicitation governsThe Department of Defense is seeking maintenance dredging services for Fort Pierce Harbor, with excavated material to be placed on Fort Pierce Beach. This is a sealed bid procurement, with award based on the lowest responsive and responsible bidder.
Scope
- Maintenance dredging of Fort Pierce Harbor.
- Placement of excavated material onto Fort Pierce Beach.
2 signals behind this label (incumbent, repeat winner, short window, brand-name or sole-source language, prior sources sought). Pro shows them with sources.
From USAspending awards and the notice text, recomputed nightly (Oct 7). A signal, not a verdict.
How to get the bid documents
- Download the 5 stored documents below; 1 more open at the source
- Check the submission requirements in the compliance checklist
- Submit by portal before 1:00 PM ET on Oct 22
Details
- Place of performance
- JACKSONVILLE, Florida
- Buyer type
- Federal
- Notice type
- Solicitation
- Solicitation no.
- W912EP-26-B-A015
- Categories
- Architecture & Engineering · beta, Construction
- Size standard
- $45M revenue SBA table, NAICS 237990
- Delivery location
- Fort Pierce Harbor, St. Lucie County, Florida from notice
- Period of performance
- 60-day commencement + 157-day completion from attachment p.3
- Estimated value
- $10M from notice
- Local presence
- Not required
- Amendments
- 5, last Oct 6
- Contact
- Meredith Gonzalez
- Office
- DEPT OF THE ARMY · W074 ENDIST JACKSNVLLE
Not stated in the notice: contract type. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
- Amendment 1
- Fri, Sep 18
- Amendment 2
- Mon, Sep 21
- Amendment 3
- Wed, Sep 23
- Amendment 4
- Wed, Sep 30
- Amendment 5
- Tue, Oct 6
Change log
verified Thu, Oct 8 · 12:30 AM ET- Posted · SolicitationThu, Aug 27 · 4:47 PM ET
- Amendment · New version of the notice posted at the sourceFri, Sep 18 · 6:28 AM ET
- Amendment · New version of the notice posted at the sourceMon, Sep 21 · 8:02 AM ET
- Deadline moved · Thu, Oct 22, 2026 · 1:00 PM ET → Tue, Oct 13, 2026 · 1:00 PM ETMon, Sep 21 · 8:02 AM ET
- Amendment · New version of the notice posted at the sourceWed, Sep 23 · 11:20 AM ET
- Amendment · New version of the notice posted at the sourceWed, Sep 30 · 8:40 AM ET
- Amendment · New version of the notice posted at the sourceTue, Oct 6 · 8:00 PM ET
- Deadline moved · Tue, Oct 13, 2026 · 1:00 PM ET → Thu, Oct 22, 2026 · 1:00 PM ETWed, Oct 7 · 12:32 AM ET
- Updated · description text changedThu, Oct 8 · 12:31 AM ET
- Deadline moved · Fri, Oct 16, 2026 · 1:00 PM ET → Thu, Oct 22, 2026 · 1:00 PM ETThu, Oct 8 · 12:31 AM ET
Report a problem
Notice as published
FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDA
PROJECT DESCRIPTION: Project work includes maintenance dredging of Fort Pierce Harbor with excavated material being placed onto Fort Pierce Beach. Due to the extensive hardbottom areas located offshore of the fill area, offshore pipeline access to the beach site is prohibited. Offloading the beach fill will be done inside the South Jetty of Fort Pierce Inlet, as shown on the drawings.
A staging area and beach access to the beach placement area are located at the end of Seaway Drive and near the south jetty pumpout location. Work also includes but is not limited to environmental and water quality monitoring, sea turtle trawl sweeping (hopper dredges only), screening, beach tilling, beach fill quality control, construction support, and vibration control and monitoring. Work will be divided into a base and two options.
BIDS DUE: 22 October 2026 at 1:00 PM EDT.
NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION.
SMALL BUSINESS SIZE STANDARD: $37 million.
TARGET PRICE RANGE: Between $5,000,000.00 and $10,000,000.00.
PERIOD OF PERFORMANCE: The Contractor shall be required to (a) commence work under this contract within SIXTY
- calendar days after the date the Contractor receives the Notice to Proceed (NTP), (b) prosecute the work diligently, and (c) complete the entire work ready for use, and be off the beach, not later than 30 May 2027, with 30 June 2027 for the entire contract work.
The time stated for completion shall include final cleanup of the premises. The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 7 January 2027. The completion date will be extended by the number of calendar days after the above date that the Contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the Contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
What this office paid before
USAspending.gov, last 36 months7 awards matched · tier 1: this contracting office (W912EP) + PSC Z2KF. Most recent:
Pro shows every award with the recipient, amount, period and a link to the award record, plus a CSV export. $39/mo.
Sign in or upgradeAwards updated Fri, Oct 9, 2026 · 12:03 AM ET.
This contracting office
6 other open notices from this office · buys mostly Construction, Architecture & Engineering
Duplicate postings
The same office posted this notice more than once within 14 days. Only this page is listed; the others are kept for reference.
Related notices
Similar open RFPs
same PSC Z2KFListing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.