Get alerts
Responses dueTue, Dec 12:00 PM CT · Texas time54 days left
PostedFri, Oct 2No amendments since
Solicitation no.RFSQ-US.256632Texas Comptroller - Electronic State Business Daily (ESBD) + Centralized Master Bidders List (CMBL)
Set-asideNoneOpen to all firms

What the city is buying

by RFPFinder from the notice; the solicitation governs

The City of Waco seeks a consulting engineering firm to perform engineering, design and oversee construction and construction services for a water pump station and 2 MG ground storage tank and chlorine contact basin restoration. Offers will be evaluated on qualifications and price.

Scope

  • Engineering, design and oversee construction and construction services
  • Water pump station and 2 MG ground storage tank and chlorine contact basin restoration
Submission: physicalDays to respond: 54

How to get the bid documents

  1. Open the notice on Texas Comptroller - Electronic State Business Daily (ESBD) + Centralized Master Bidders List (CMBL)
  2. Read the notice; the source lists no attachments
  3. Submit by physical before 2:00 PM CT on Dec 1

The source notice lists no attachments.

Open the original listing on the agency portal

Details

Place of performance
Waco, Texas
Buyer type
City
Notice type
RFSQ
Solicitation no.
RFSQ-US.256632
Category
Architecture & Engineering · beta
Contract type
Firm-fixed-price from notice
Local presence
Not required
Amendments
None since Oct 2
Contact
Gina Eckhardt · Director
Phone
(254) 750-8061

Not stated in the notice: estimated value, period of performance. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Oct 2Posted
Not statedQuestions due
Tue, Dec 1 · 2:00 PM CTResponses due · 54 days left

Change log

verified Thu, Oct 8 · 7:15 AM CT

No amendments since posting on Fri, Oct 2; verified Thu, Oct 8 · 7:15 AM CT.

Report a problem

Notice as published

Flat Creek Reuse Project Phase 1A

The City of Waco has issued this Request for Qualifications to select a consulting engineering firm to perform engineering, design and oversee construction and construction services to meet Federal, State and Municipal standards for a water pump station and 2 MG ground storage tank and chlorine contact basin restoration.

Pre-bid conference: No Pre-Bid Conference Data Found

Listing collected from Texas Comptroller - Electronic State Business Daily (ESBD) + Centralized Master Bidders List (CMBL). Always confirm requirements in the original solicitation before you bid.

Alert meView on agency site