What the county is buying
by RFPFinder from the notice and attachments; the solicitation governsPike County Water & Sewerage Authority seeks sealed bids to construct a filter backwash water treatment facility with concrete structures, piping, filtration media, and dichlorination systems. Bids are evaluated as lowest responsive responsible bidder with 60 days to substantial completion.
Scope
- Construct filter backwash water treatment facility with concrete structures and yard piping
- Install gravel and sand filter media, dichlorination system, and erosion control measures
How to get the bid documents
- Download the 1 document below (no portal account needed)
- Check the submission requirements in the compliance checklist
- Submit by physical before 11:00 AM ET on Nov 13
Details
- Place of performance
- Georgia
- Buyer type
- Public
- Notice type
- Non-State Agency
- Solicitation no.
- PE-33955-NONST-2026-000000004
- Category
- Construction · beta
- Period of performance
- 60 consecutive calendar days to substantial completion; 74 consecutive calendar days to contract clo from notice
- Evaluation
- Sealed bid, price only from notice
- Local presence
- Not required
- Amendments
- None since Oct 14
- shon@watkinseng.com
Not stated in the notice: estimated value, contract type. Check the bid documents.
Contact details from the source notice. Contact the buyer only about this solicitation.
Key dates
Change log
verified Thu, Oct 15 · 8:16 AM ETNo amendments since posting on Wed, Oct 14; verified Thu, Oct 15 · 8:16 AM ET.
Report a problem
Notice as published
Filter Backwash Water Treatment
Sealed Bids for the construction of the Filter Backwash Water Treatment will be received, by Pike County Water & Sewerage Authority, at 7818 US-19 South, Zebulon, Georgia 30295, until Friday, November 13, 2026, at 11:00 A.M. local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty
- days.
The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Filter Backwash Water Treatment as shown on the construction drawings. In general, construction consists of concrete structures, yard piping, gravel & sand filter media, dichlorination system, erosion control and all associated measures for a complete project. Time allotted for completion of work is 60 consecutive calendar days to substantial completion.
Work shall be complete and ready for contract close-out with 74 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one
- Contract.
Copies of the Bidding Documents may be obtained from Watkins & Associates, LLC, 1606 Whiddon Mill Road, Tifton, Georgia 31793, (229) 388-8823 (Office of the Engineer), upon payment of a non-refundable fee of $300.00 (cash or check) or $309.00 (credit/debit card) for each set. Prospective Bidders may examine the Bidding Documents at the Pike County Water & Sewerage Authority, 7818 US-19 South, Zebulon, Georgia 30295, or at the Office of the Engineer at Watkins & Associates, LLC, Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m. Upon receipt of the required payment, Watkins & Associates, LLC will transmit the digital Bidding Documents by electronic download link.