Sign inGet alerts

F16_AN_APG68_DualMonitor_NSN5998013035871_PN785R537G01

DEPT OF DEFENSE, Oklahoma · DEPT OF THE AIR FORCE · FA8122 AFSC PZAAB
Responses dueTue, Nov 30, 202711:01 PM CT · Oklahoma time417 days left
PostedFri, Apr 10No amendments since
Solicitation no.F16_AN_APG68_DualMonitor_NSN5998013035871_PN785R537G01SAM.gov
Set-asideNoneOpen to all firms

What the agency is buying

by RFPFinder from the notice and attachments; the solicitation governs

The DEPT OF DEFENSE is seeking sources for RF Monitor Application: F-16 C/D APG-68 Dual Mode Transmitter. The contract will be awarded based on qualification requirements.

Scope

  • RF Monitor Application: F-16 C/D APG-68 Dual Mode Transmitter
  • Repair, inspect, test, package, and store the item
Not a solicitation — no awardTDP access mandatory before bidDays to respond: 417

How to get the bid documents

  1. Download the 1 document below (no portal account needed)
  2. Check the submission requirements in the compliance checklist
  3. Submit as the notice directs before 11:01 PM CT on Nov 30, 2027
Documents · 1 item, 1 file
  • PDF
    RDL 785R537G01_Redacted.pdf59 KB · 1 page
Open the original listing on SAM.gov

Details

Place of performance
Tinker AFB, Oklahoma
Buyer type
Federal
Notice type
Sources Sought
Solicitation no.
F16_AN_APG68_DualMonitor_NSN5998013035871_PN785R537G01
Category
Supplies & Equipment
Contract type
not stated from notice
Evaluation
n/a, market research from notice
NSN
5998-01-303-5871 from notice
Part number
785R537G01 from notice
Local presence
Not required
Amendments
None since Apr 10
Contact
Tracey Beringer
Office
DEPT OF THE AIR FORCE · FA8122 AFSC PZAAB
Email
tracey.beringer@us.af.mil
Phone
7772211

Not stated in the notice: estimated value, period of performance, quantity, FOB terms. Check the bid documents.

Contact details from the source notice. Contact the buyer only about this solicitation.

Key dates

Fri, Apr 10, 2026Posted
Not statedQuestions due
Tue, Nov 30, 2027 · 11:01 PM CTResponses due · 417 days left

Change log

verified Fri, Oct 9 · 11:30 PM CT

No amendments since posting on Fri, Apr 10, 2026; verified Fri, Oct 9 · 11:30 PM CT.

Change log starts Oct 5, 2026 (tracking began); earlier amendments at SAM.gov are being pulled in.

Report a problem

Notice as published

F16_AN_APG68_DualMonitor_NSN5998013035871_PN785R537G01

P/N: 785R537G01 Noun: RF Monitor Application: F-16 C/D APG-68 Dual Mode Transmitter 1 Jul 2021 Section C 1/3 SECTION C:

  1. QUALIFICATION REQUIREMENTS THAT MUST BE SATISFIED TO BECOME A QUALIFIED SOURCE a.

Prequalification Notice: The offeror shall notify the appropriate government Small Business Office or, if responding to a solicitation, the contracting officer in the appropriate government contracting office, of intent to qualify as a source for this RF Monitor. b.

Facilities, Testing, and Inspection Capabilities: The offeror must certify to the government that they have, or have access to, the required facilities and equipment to repair, inspect, test, package, and store the item. The offeror shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government. c.

Data Verification: The offeror must verify that they have a complete data package. This verification must include a complete list of all procedures, drawings, and specifications, including change notices, in the offeror's possession including, at a minimum Northrop Grumman (97942) drawings 785R537G01 and T823A84. The offeror may also be required to produce copies of all applicable procedures, drawings, or specifications. d.

Repair Process Verification: The offeror must repair this item to conform to the government requirements as prescribed within the ESA-approved engineering/technical data package. The offeror must show compliance with Unique Identification (UID) requirements in accordance with DFARS 211.274 as prescribed within the ESA-approved engineering/technical data package. The offeror must provide, at their own expense, data showing the results of all quality, performance, and environmental evaluations conducted by the offeror to show compliance with the government requirements as prescribed by 416 SCMS/GUEAA.

The offeror shall also identify its sources for materials and its standards for internally used processes. e.

Test and Evaluation and/or Verification: The offeror, at their own expense, shall prepare and submit to 416 SCMS/GUEAA for their prior approval, a qualification test plan/procedure detailing how they intend to verify compliance with all performance, environmental, mechanical, and quality assurance requirements identified by Drawings 785R537G01 and T823A84. After completion of the approved qualification testing, the offeror shall be required to submit a complete test report of the results to 416 SCMS/GUEAA for their review and approval prior to the contract award. The government retains the right to exercise the option to inspect the testing processes, including on-site witnessing of any or all documented testing.

To allow accomplishing this, the offeror shall notify the government at least 30 days in advance of the occurrence of any testing that will be used as a basis for qualification. The offeror's facilities shall be made available for government inspection during these tests. f.

Qualification Article Verification: The offeror must provide, at their own expense, a pre-contract award qualification article for evaluation by the government. This article must comply with all of the requirements of Drawing 785R537G01, T823A84. This article shall be subjected to a form, REPAIR QUALIFICATION REQUIREMENTS NSN: 5998-01-303-5871 P/N: 785R537G01 Noun: RF Monitor Application: F-16 C/D APG-68 Dual Mode Transmitter 1 Jul 2021 Section C 2/3 fit, and function evaluation to demonstrate compatibility with the weapon system and to evaluate the repair capability of the offeror.

Offerors will be notified whether or not their qualification article passed or failed the required qualification testing within 90 days of submitting a product for qualification testing. Note that successful completion of the qualification testing does not guarantee any contract award. If the offeror is deemed qualified and awarded the contract, a post-contract award first article exhibit may be required to verify production capability. g.

Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified are $3,000. h.

Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the RF Monitor and other factors. i.

Qualification Time Limitation: An offeror may not be denied the opportunity to submit and have considered an offer for a contract if the offeror can demonstrate to the satisfaction of the contracting officer that the offeror (or its product) meets these standards for qualification or can meet them before the date specified for award of the contract. The award will not be delayed to provide the vendor with an opportunity to demonstrate its ability to meet the standards specified in this qualification requirement. j.

Evaluation of Proposals Not Previously Qualified: The offeror must be fully qualified in order to be eligible for a contract award. Therefore, the offeror must fulfill all of the requirements stated, in writing, in the qualification requirement before the date specified for award of the contract. Once all requirements are met, the offeror will be listed as an approved repair source for this item.

Approval, however, does not guarantee subsequent contract award.

Award history

USAspending.gov, last 36 months

Award history for this agency is not loaded yet.

Awards for this key have not been synced yet.

This contracting office

29 other open notices from this office · buys mostly Equipment Maintenance & Repair, Other, Supplies & Equipment

Similar open RFPs in Oklahoma

same contracting office

Listing collected from SAM.gov. Always confirm requirements in the original solicitation before you bid.

Alert meView on SAM.gov